Azizi Venice
under constructionHandover: No firm date; Azizi says handovers run through 2026 into 2027 (Sep 2026)

Projects
Handover dates, payment plans and prices for 439 Dubai projects.

under constructionHandover: No firm date; Azizi says handovers run through 2026 into 2027 (Sep 2026)

off-planHandover: Phase 1 due Q4 2028 (registered 31 Dec 2028 for Maldives); DAMAC Islands 2 due Q2 2030

under constructionHandover: DLD registered completion dates 31 Mar 2030 (Serro) to 31 Jul 2030 (Salva); Property Finder Q1 to Q3 2030

under constructionHandover: Palmiera Dec 2027 (Emaar payment plan brief); other clusters June 2028 to Q1 2030

under constructionHandover: Completion set for 31 Dec 2027 (Binghatti and DLD registered completion date)

partly handed overHandover: Phased, by tower: complete to 2030

partly handed overHandover: Clusters from Nov 2025, about 6,300 more homes due in 2026

under constructionHandover: By project: Q4 2026 to Q1 2028 (Property Finder); Nakheel says Bay Grove main works finish late 2028

partly handed overHandover: Clusters from 2021 to Q4 2027

partly handed overHandover: Most phases ready. Anya, Anya Phase 2 and May recorded Ready on the DLD register; Anya registered for Oct 2026

partly handed overHandover: First villas from 2016; new phases due 2027 to 2029

partly handed overHandover: Established clusters complete; remaining clusters registered for 27 Feb 2027 to 30 Aug 2027; Violet's Jan 2026 registered date has passed

partly handed overHandover: Early phases from 2020; newer releases have DLD registered completion dates from Oct 2028 to Feb 2030

under constructionHandover: Phased from late 2026 (Nakheel); registered completion Sep 2027 to Jan 2028 by frond, Dec 2028 for newer villa records (DLD)

partly handed overHandover: Eight projects complete 2021 to 2026; others registered for 31 Dec 2026 to 30 Nov 2031 (DLD)

handed overHandover: Handed over Dec 2024 (Binghatti); registered completion date 1 Oct 2024

partly handed overHandover: Phases 1 to 3 complete; Rêve due Q4 2026; newer towers registered for Mar and May 2027

under constructionHandover: By tower: complete since 2022 to Q4 2029

partly handed overHandover: Phase 3 registered for 19 Apr 2026, overdue; Phase 7 registered for 15 Feb 2028 (Property Finder: 31 Aug 2028); last phase 1 Aug 2029

under constructionHandover: Q2 2026 target (Binghatti), now passed; portal dates Q3 2026 to Q2 2027

handed overHandover: Completed, sources give May 2022 or September 2023

under constructionHandover: Registered: Ivy, Lush, Sage 31 Dec 2027; Olive 30 Jun 2028; apartments 31 May 2028 to 31 Mar 2029 (DLD)

off-planHandover: Not on Binghatti's project page; Propsearch estimate Q3 2028; broker price lists Q2 2029; Property Finder Q4 2029

off-planHandover: DLD registered completion dates 30 Jun 2030 (nine clusters) and 31 Dec 2030 (Antigua 1)

off-planHandover: First villas from Q3 2029 (Sobha); DLD registered completion 31 Aug 2030 (villas), 30 Dec 2030 (The Woods)

handed overHandover: Handed over 5 June 2024

under constructionHandover: 2029 per Azizi; DLD registered completion date 30 Aug 2030

under constructionHandover: Q2 2028 (30 Jun 2028, DLD registered completion date)

handed overHandover: Handovers began Nov 2025; Santorini 2 finished 9 Feb 2026, Santorini 3 on 9 Apr 2026 (DLD)

partly handed overHandover: Phase 1 handed over, Jan 2026. Phase 2: DLD registered completion date 30 Apr 2026, passed

handed overHandover: Handed over from 24 Dec 2025 (Azizi, as Beach Oasis I); DLD registered completion date 30 Apr 2025

under constructionHandover: Q4 2026 (31 Dec 2026)

under constructionHandover: Q1 2027, 31 March 2027 registered completion date (not yet due)

handed overHandover: Handed over, completed Dec 2023

off-planHandover: Dec 2029 for four towers, Dec 2030 for The Mirage and The Pinnacle (Sobha); DLD registered 30 Jun 2030 and 31 Dec 2031

handed overHandover: Q4 2023 (complete, delivered 27 Nov 2023 per DLD records)

handed overHandover: Completed 30 Sep 2025 (DLD); handover from 22 Oct 2025 (Azizi)

under constructionHandover: Q2 2026 (Binghatti), now passed. DLD registered completion date 30 Jun 2026

under constructionHandover: By phase: Serra, Cilia and Lacina 2027 (Lacina registered 30 Dec 2027); Distrikt registered 30 Sep 2028; Capria East and West registered May 2029

under constructionHandover: Q4 2027 (Aldar project page; Q3 2027 at launch); DLD registered completion 28 Nov 2027 (Haven 1) and 30 Mar 2028 (Haven 3)

under constructionHandover: Phased: villas 31 Dec 2026 (Property Finder; named in Sobha's 2026 handover plan); Riverside Crescent Jun to Dec 2027 (Sobha); Skyscape Dec 2028 (Sobha) and registered for 31 Dec 2029; Skyvue registered for 31 Mar 2030

under constructionHandover: Phase 1 registered 31 May 2028, phase 2 30 Sep 2028 (DLD); apartments 30 Dec 2029 to 30 Jan 2030

off-planHandover: DLD registered completion dates from Mar 2027 (Milan 51) to Sep 2028 (Milan Heights)

under constructionHandover: DLD registered completion date 30 Jun 2027; Propsearch estimate Q4 2027

under constructionHandover: Q1 2026 (Binghatti); DLD registered completion date 31 Mar 2026, passed

under constructionHandover: Q1 2026 (Binghatti); DLD registered completion date 31 Mar 2026, both passed

under constructionHandover: Q1 2029 (registered completion date 31 March 2029)

handed overHandover: Completed Apr 2026 (originally targeted Q4 2024)

under constructionHandover: Q4 2028 (31 Dec 2028)

under constructionHandover: Listed Q2 2026, now passed; some portals give Q4 2026

partly handed overHandover: In clusters; Rivana registered for 31 Mar 2027, Alana May 2027, Nima Jul 2027, the last clusters to early 2030

handed overHandover: Costa Brava 1 finished 10 Apr 2026, Costa Brava 2 on 4 Aug 2026 (DLD)

under constructionHandover: Q4 2026 (Property Finder); Jun 2026 estimate, passed (Propsearch)

under constructionHandover: Tower A 30 Apr 2028; Towers B and C 31 Oct 2028 (DLD registered completion dates)

under constructionHandover: Registered date 29 Jul 2025 has passed; broker listings give Q3 to Q4 2026

under constructionHandover: DLD registered completion date 27 Mar 2027; Nakheel contract completion Q2 2028 (Sep 2024)

under constructionHandover: 31 Dec 2028 (DLD registered completion date); Propsearch shows Aug 2027

handed overHandover: Handed over, 16 Apr 2026

under constructionHandover: Dec 2027 (Sobha) or 31 Dec 2028 (DLD registered completion date)

handed overHandover: Handed over, October 2026 (Deyaar, 6 Oct 2026); originally 2025

under constructionHandover: Q2 2027 (DAMAC); DLD registered completion date 30 Sep 2025, passed

under constructionHandover: Q2 2027 (Deyaar, since launch in Feb 2024); no DLD registered completion date on file

under constructionHandover: 2029 opening announced at launch (Aug 2025); Property Finder lists June 2029; no DLD registered date

under constructionHandover: Dec 2027 to Jun 2030 by cluster (Sobha); villas Dec 2027 and Jun 2028 (Sobha), Dec 2028 (Property Finder)

partly handed overHandover: Registered date 29 Jun 2025 has passed; not yet recorded finished on the DLD register

under constructionHandover: Not agreed: Q4 2024 to Q3 2026 depending on source; DLD registered date 2 Feb 2025

under constructionHandover: Q2 2028 (DAMAC project page); unit listings show Q4 2028

under constructionHandover: No single community date; DLD registered completion dates from 30 Jun 2027 to 31 Aug 2029

under constructionHandover: 31 Oct 2028 (DLD registered completion date); Property Finder shows Apr 2028

under constructionHandover: Registered date 29 Sep 2025 has passed; portals give Q2 to Q3 2027

handed overHandover: Malta 2 finished 8 Apr 2026, Malta 1 on 19 Jun 2026 (DLD)

under constructionHandover: DLD registered completion dates: Phase 1 15 May 2028; Phases 2 and 3 31 Aug 2028

under constructionHandover: Jul 2028 (Select Group, Property Finder); 2029 per Bayut; no completion date on the DLD register

under constructionHandover: DLD registered completion date 27 Mar 2027; Propsearch estimate Q2 2027; not published by Meraas

under constructionHandover: Not confirmed by Binghatti. DLD registered completion date of 30 Jun 2026 has passed; CTBUH lists 2027

under constructionHandover: DLD registered completion date 30 Apr 2026, now passed

under constructionHandover: Portals say Q4 2026; DLD records show 30 Apr 2027 (Morocco 1) and 31 Oct 2027 (Morocco 2)

under constructionHandover: DLD registered completion dates Feb to Aug 2029 by cluster; 1 Jun 2029 (Property Finder); not stated by Emaar

under constructionHandover: Building Completion Certificate targeted early 2027 (Omniyat); DLD registered completion date 31 Dec 2026

under constructionHandover: Registered for 31 Dec 2025; DLD records now show 28 Feb 2027

under constructionHandover: Registered for 31 Dec 2025; DLD records now show 30 Jun 2027

under constructionHandover: Registered for 31 Dec 2025; portals said Q2 2026; no new date published

under constructionHandover: Registered for 31 Dec 2025; DLD records now show 31 Dec 2026

under constructionHandover: 16 Jan 2028 (DLD registered completion date); portals list Q4 2027 to Q1 2028

under constructionHandover: 31 Dec 2028 (DLD registered completion date); developer materials say 2029 to early 2030

under constructionHandover: Phase 1: Q1 2027 per Property Finder (Propsearch Jun 2027). Phase 2: DLD registered completion 19 Nov 2027; contract completion Q1 2028

under constructionHandover: March 2027 (Views 1 and 2); Bayut gives Q3 2027 for Views 1

handed overHandover: Completed 2024 (100% built by 30 Sep 2024)

under constructionHandover: Phase 1 Q4 2027 (Meraas target, no DLD date on file); The Acres 3 and Estates 19 Nov 2027; The Acres 2 and Estates 2 3 May 2028 (DLD registered completion dates)

under constructionHandover: DLD registered completion date 30 Jun 2029 (Q2 2029); Property Finder lists Q1 2029

handed overHandover: 2025 (DLD recorded 100% complete on 29 Jul 2025)

under constructionHandover: Q4 2026 (named in Sobha's plan); DLD registered completion date 30 Jun 2027

under constructionHandover: Q3 2027 (DAMAC); DLD registered completion date 15 Jan 2027

under constructionHandover: Due March 2028 (DLD registered completion date 30 Mar 2028)

under constructionHandover: Q4 2026, December 2026 (Property Finder); Bay Residences registered 15 Oct 2026

under constructionHandover: Villas and townhouses targeted Q1 2026, now passed (DLD registered date 31 Jan 2026)

under constructionHandover: Nakheel says main works on phases 1 and 3 finish late 2028; DLD registered completion 15 Mar 2028 (phase 1) and 21 Sep 2028 (phase 3)

under constructionHandover: Q3 2027 (Omniyat, May 2025; Property Finder); DLD registered completion date 13 May 2027

handed overHandover: Handed over. Building Completion Certificate obtained by 31 Oct 2025

under constructionHandover: November 2027 (Q4 2027), per Danube; no DLD registered completion date

under constructionHandover: DLD registered completion date 31 May 2028

under constructionHandover: May 2027, Q2 2027 (Danube); DLD registered completion date 30 Mar 2026, passed

under constructionHandover: DLD registered completion date 31 Jul 2028 (Q3 2028); Danube's own page and Property Finder give Q2 2028

partly handed overHandover: By tower: Seagate completed 2025; Seascape registered for 30 Nov 2026; others Feb 2027 to Jun 2030

under constructionHandover: Jun 2029 (Danube); DLD registered completion date 31 Dec 2029

under constructionHandover: 30 Dec 2027 (DLD registered completion date)

under constructionHandover: Q4 2027 (November 2027); DLD registered completion date 30 Nov 2027

off-planHandover: 28 Feb 2030 (DLD registered completion date); one broker's schedule shows Sep 2030

handed overHandover: All phases delivered, Dec 2021 to Jun 2025 (Emaar; Bayut gives Oct 2025 for Phase 6)

under constructionHandover: DLD registered completion 31 May 2026 (passed); developer Q2 2026; some portals now Q4 2026

under constructionHandover: DLD registered completion 1 Dec 2027; developer Q3 2027

under constructionHandover: Q1 2027 (Kamdar); registered completion date 28 Feb 2027 (DLD)

under constructionHandover: Q1 2027 (TownX); registered completion date 31 Mar 2027 (DLD)

under constructionHandover: Registered completion date 31 December 2026; developer and Propsearch say Q4 2026

under constructionHandover: Phase 1 past its Q3 2025 target and not yet complete; 1WOOD Residence 2 registered for completion on 20 Oct 2027

under constructionHandover: DLD registered completion 31 Jan 2027; developer Q1 2027

off-planHandover: Q1 2029 (Beyond); registered completion date 30 Dec 2028 (DLD)

under constructionHandover: December 2027 (Sobha); 1 Mar 2027 (Property Finder); no DLD registered completion date filed

under constructionHandover: Q2 2028; registered completion date 1 April 2028 (DLD)

under constructionHandover: Registered completion date 10 Jun 2028 (DLD); Q2 2028 at launch, Q4 2028 on some broker pages

under constructionHandover: DLD registered completion 30 Nov 2028; developer Q4 2028

partly handed overHandover: Phase 3: DLD registered completion 15 May 2027, developer Q2 2027. Phase 4: 30 Dec 2026. Phase 5: 3 Jun 2027. Phases 1 and 2 completed

partly handed overHandover: Registered completion date 20 Jul 2026; handovers under way from Q3 2026

under constructionHandover: Registered completion 30 Jun 2028 (DLD); marketed as Q4 2027

under constructionHandover: Q4 2027 (Deyaar); registered completion date 31 December 2027 (DLD)

under constructionHandover: Q4 2028 (Object 1); registered completion date 30 Jun 2029 (DLD)

handed overHandover: Handover began in the week of 21 September 2026 (Tiger Group); construction complete per the DLD register (100%, status Ready, 19 Oct 2026); registered completion date was 31 January 2026; Tiger targeted early July 2026

under constructionHandover: End of 2027 (Amali Properties, Dec 2025); registered completion date 31 March 2027 (DLD)

under constructionHandover: Developer gives Q3 2027; DLD registered completion date 30 Oct 2027

under constructionHandover: Registered completion date 31 May 2028; Tiger says Q2 2028; 3.2% built in October 2026, so the date is very likely to move

under constructionHandover: Q3 2028 (Karma); DLD registered completion date 30 Sep 2028

under constructionHandover: Omniyat states Q4 2027; DLD registered completion date 31 Jan 2026 (passed); Property Finder lists Q4 2026

off-planHandover: Q1 2029 (Beyond launch materials, 8 Jun 2026); DLD registered completion date 30 Oct 2028

under constructionHandover: Q4 2027 (QUBE); registered completion date 1 October 2027 (DLD)

off-planHandover: Q1 2029 (Select Group); registered completion date 9 Feb 2029 (DLD)

under constructionHandover: Q1 2027 (TownX); registered completion date 31 Mar 2027 (DLD)

under constructionHandover: Q4 2028 (Danube); registered completion date 31 Dec 2028 (DLD)

Handover: No date set. The registered completion date of 1 April 2020 has passed

off-planHandover: Registered completion date 15 Mar 2028 (DLD); Q1 2028 per developer data, Q2 2028 in launch listings

under constructionHandover: DLD registered completion 14 Jan 2028; Nshama Q1 2028

under constructionHandover: Registered completion 1 Nov 2026 (DLD), not achievable at current progress; Q4 2026 to Q1 2027 in marketing

under constructionHandover: Registered completion date 31 December 2028; developer date Q4 2028; 4.44% built in October 2026

under constructionHandover: DLD registered completion 1 Sep 2027; developer Q4 2027

under constructionHandover: 4 Aug 2027 (DLD registered completion date); Property Finder shows 30 Jun 2027

under constructionHandover: Registered completion date 17 Jun 2027 (DLD); Q4 2027 on most portals

handed overHandover: Handover began July 2026 (Azizi); first promised for Q4 2025

under constructionHandover: Registered completion date 30 Sep 2028 (DLD); Q4 2027 on portals and broker listings

under constructionHandover: DLD registered completion 13 Feb 2028; Q1 2028 (developer, via Continental Club); June 2027 at launch

off-planHandover: Registered completion date 4 Jul 2028 (DLD); Q4 2028 on Bayut and Propsearch

under constructionHandover: Registered completion date 30 Sep 2028 (DLD); Q4 2027 on Propsearch

under constructionHandover: 30 Sep 2028 (DLD registered completion date); some broker pages still show Q4 2027

under constructionHandover: 30 Jul 2027 (DLD registered completion date); Property Finder shows July 2027

off-planHandover: Registered completion date 4 Jul 2028 (DLD); December 2027 on Property Finder

under constructionHandover: Registered completion date 15 Jan 2028 (DLD); Q1 2028 on Property Finder; Sep 2026 at launch

off-planHandover: DLD registered completion date 4 Jul 2028; portals show Q4 2028

under constructionHandover: DLD registered completion date 23 Jan 2028; Q4 2026 marketed at launch

under constructionHandover: Registered completion date 4 Mar 2028; portals list Q4 2027 to Q1 2028

under constructionHandover: DLD registered completion date 11 Oct 2027; Q4 2027 on portals

under constructionHandover: DLD registered completion 29 Dec 2026; developer Q2 2027; Phase 2 tower Q4 2027 (Property Finder)

off-planHandover: 31 Dec 2028 (DLD registered completion date); Q4 2028 (developer)

under constructionHandover: 2 May 2027 (DLD registered completion date); Q2 2027 (June 2027) on Property Finder

under constructionHandover: Registered completion date 31 December 2029; Emaar and Property Finder say Q4 2029

partly handed overHandover: By building: Beach Walk 1 handed over 2026; Beach Walk 2 complete Aug 2026; Beach Walk 3 registered 14 Jun 2026 (passed); Beach Walk 4 registered 20 Apr 2027

under constructionHandover: Registered completion date 30 Sep 2028 (DLD); Q3 2028 per Ellington's launch material and portals

under constructionHandover: DLD registered completion 31 Mar 2028; Zimaya Q1 2028

under constructionHandover: Registered completion date 30 Mar 2028 (DLD); Prestige One says March 2028

under constructionHandover: Registered completion date 31 Dec 2026; marketed for Q4 2026

under constructionHandover: Registered completion date 28 Feb 2026, now passed; Binghatti still lists Q1 2026

under constructionHandover: Q1 2027 (Binghatti); registered completion date 31 Oct 2026

under constructionHandover: Q2 2027 (registered completion 31 May 2027)

under constructionHandover: 31 Dec 2027 (DLD registered completion date); Binghatti says July 2027

under constructionHandover: Registered completion dates 15 Jun 2027 (Flare 02) and 14 Jul 2027 (Flare 01); Binghatti says Q2 2027

under constructionHandover: Registered completion date 31 Dec 2026; marketed as Q4 2026

under constructionHandover: Q2 2026 target (Binghatti) and 30 Jun 2026 registered completion date, both passed

under constructionHandover: Registered completion date 1 Apr 2026, now passed; Binghatti now says Q4 2026

under constructionHandover: Registered completion date 30 Jul 2027; Binghatti says Q3 2027

under constructionHandover: Registered completion 15 Jun 2026, now passed; Binghatti still lists Q2 2026

under constructionHandover: Q1 2026 (Binghatti), now passed; DLD registered completion date 28 Feb 2026; Propsearch estimate Q4 2027

under constructionHandover: Q4 2027 (Binghatti); registered completion date 30 Nov 2027

under constructionHandover: Registered completion 31 Aug 2026, now passed; Binghatti says Q3 2026, Property Finder Q4 2026

off-planHandover: Registered completion 31 Oct 2027; brokers quote Dec 2027

under constructionHandover: Q1 2027 (Binghatti, as supplied to portals); registered completion date 28 Feb 2027

under constructionHandover: Q1 2026 (Binghatti), now passed; DLD registered completion date 30 Apr 2026

off-planHandover: Registered completion 30 Dec 2027; marketed as Q4 2027

under constructionHandover: 15 Dec 2026 (DLD registered completion date and Property Finder); developer gives Q4 2026

under constructionHandover: 31 Jan 2029 (DLD registered completion date); developer gives Q1 2029

under constructionHandover: DLD registered completion 12 Sep 2027; developer Q3 2027

under constructionHandover: 30 Jun 2026 (DLD registered completion date, passed); Q2 2026 (developer)

off-planHandover: 31 Jan 2030 (DLD registered completion date); marketed as Q1 2030

under constructionHandover: 28 Feb 2027 (DLD registered completion date); marketed as Q1 or Q2 2027

under constructionHandover: DLD registered completion 10 Dec 2028 (Crestlane 2 and 3), 30 Sep 2029 (Crestlane), 25 Apr 2030 (Crestlane 4 and 5)

handed overHandover: Handed over 29 October 2025 (Tiger Properties); registered completion date 28 February 2025

under constructionHandover: 30 Oct 2028 (DLD registered completion date); Imtiaz estimates Q2 2028

under constructionHandover: Registered completion date 15 December 2027; Imtiaz says Q4 2027

handed overHandover: Handed over. Sobha announced handover on 30 Jan 2025; DLD registered completion date 31 Jul 2025

under constructionHandover: Creek Waters: Q3 2027. Creek Waters 2: Dec 2027

off-planHandover: Q4 2028; registered completion date 1 December 2028 (DLD)

under constructionHandover: Q4 2027 (Wadan); DLD registered completion 30 Dec 2027

under constructionHandover: Q3 2029 (DAMAC, via Bayut); DLD registered completion date 30 Mar 2029

under constructionHandover: DAMAC gives Q2 2027; DLD-based dates run from 31 Mar 2027 to 31 Dec 2027 by phase

under constructionHandover: Launch brochure gave January 2027; DAMAC now gives Q2 2027 for Lagoon Views

under constructionHandover: DAMAC gives Q1 2029 (Q3 2029 on its project banner); DLD registered completion 28 Feb 2028

under constructionHandover: Registered completion date 31 Dec 2029; DAMAC gives December 2029

under constructionHandover: Q2 2027 (developer); DLD registered completion 30 Jun 2027

partly handed overHandover: Main Phase 1 plazas handed over Sep 2020 to Apr 2022; Phase 2 date not published

under constructionHandover: Q2 2028 (Takmeel); DLD registered completion 31 Mar 2028

Handover: No handover. Promised for 2008; DLD status under cancellation since 22 Oct 2024

under constructionHandover: DLD registered completion date 25 Dec 2026; developer and portal dates range from Q4 2026 to Q1 2028

under constructionHandover: DLD registered completion 1 Dec 2027; Property Finder October 2027; June 2027 given in 2024

under constructionHandover: DLD registered completion 25 Feb 2027; developer Q1 2027

off-planHandover: Q3 2027 (Zoya Developments); registered completion date 31 Mar 2028 (DLD)

off-planHandover: Q4 2028 (Object 1); registered completion date 30 Sep 2028 (DLD)

under constructionHandover: Registered completion date 31 May 2028; developer and portals say Q2 2028

under constructionHandover: Not consistent; Danube's own site gives Q4 2026 and April 2027; no DLD registered completion date

under constructionHandover: Elitz 1: October 2026 (Danube); registered date 31 Dec 2025 has passed. Elitz 2: December 2027 (Danube); no registered date

under constructionHandover: Q4 2027 (ANAX); registered completion date 1 Sep 2027 (DLD)

under constructionHandover: Registered completion 31 Dec 2028 for both phases (DLD); marketed as Q4 2028

under constructionHandover: June 2027 (Deyaar, Property Finder); DLD registered completion 1 Jun 2027

handed overHandover: Completed 13 Mar 2026 on the DLD register; Emaar's launch estimate was Sep 2026

off-planHandover: Q4 2029 (Ellington); registered completion date 31 Dec 2029 (DLD)

under constructionHandover: Mid-2026 target (Majid Al Futtaim, Jan 2024); registered completion date 31 Mar 2025, not updated

under constructionHandover: Summer 2027 (Deyaar at launch); registered completion date 1 June 2027 (DLD)

off-planHandover: Q4 2028 (Empire Developments); registered completion date 31 Dec 2028 (DLD)

under constructionHandover: Q2 2028 (Empire Developments, Dec 2025); registered completion date 24 Jun 2028 (DLD)

under constructionHandover: Q3 2028 (Omniyat); DLD registered completion date 31 Dec 2027

under constructionHandover: Q4 2028 (GRID); DLD registered completion date 15 Dec 2028

under constructionHandover: Q1 2028 (Imtiaz); registered completion date 15 Aug 2028 (DLD)

under constructionHandover: Q2 2027 (Elysian Developments, at launch in Jan 2025); DLD registered completion date 1 Apr 2027

under constructionHandover: Q4 2026 (developer and portals); registered completion date 31 May 2026, passed

under constructionHandover: December 2026 (Al Marina Investment, Nov 2025); registered completion date 30 Sep 2026 (DLD), now passed

under constructionHandover: July 2027 on Danube's main project page; its FAQ still says July 2026; no completion date on the DLD register

off-planHandover: Q4 2028 (London Gate); registered completion date 29 Jul 2028 (DLD)

under constructionHandover: Q2 2027 (Baron); registered completion date 2 Jun 2027 (DLD)

under constructionHandover: DLD registered completion 30 Jun 2026 (passed); developer Q2 2026; listings now give July to Q4 2026

under constructionHandover: DLD registered completion 14 Oct 2026; Q4 2026 (developer via Continental Club)

under constructionHandover: DLD registered completion date 28 February 2027; Q4 2027 in developer and portal listings

under constructionHandover: Registered completion date 2 January 2028 (DLD); developer site still says Q2 2027

under constructionHandover: October 2028 (Emaar payment plan and Property Finder); no completion date filed on the DLD register

under constructionHandover: February 2028 (Prestige One); registered completion date 16 Feb 2028 (DLD)

off-planHandover: 31 March 2030 (DLD registered completion date); Q1 2030 per Emaar

off-planHandover: Q4 2029 (Danube); registered completion date 31 Dec 2029

under constructionHandover: Registered completion date 25 December 2027; Tiger says Q4 2027; 7.3% built in October 2026, so the date is very likely to move

off-planHandover: 20 October 2027 (DLD registered completion date); Q4 2027 per LEOS

off-planHandover: Q3 2029 (Beyond); registered completion date 30 June 2029 (DLD)

off-planHandover: Q2 2028 (IRTH); registered completion date 31 Aug 2028 (DLD)

under constructionHandover: Q1 2027 (Nshama); DLD registered completion date 26 Feb 2027

under constructionHandover: Q1 2029 (IRTH); registered completion date 31 March 2029 (DLD)

under constructionHandover: 28 February 2028 (DLD registered completion date); Q3 2027 on Mered's website

under constructionHandover: DLD registered completion 30 Apr 2026 (passed); portals now say Q2 2026

under constructionHandover: DLD registered completion 15 Jun 2029; Imtiaz Q2 2029

off-planHandover: June 2028 (DAMAC and Property Finder); registered completion date 30 Jun 2028 (DLD)

under constructionHandover: Q4 2027 (Deyaar); registered completion date 31 December 2027 (DLD)

under constructionHandover: Q2 2027; DLD registered completion date 30 Jun 2027

under constructionHandover: Registered completion date 31 December 2027; developer says Q1 2028

under constructionHandover: Registered completion date 31 March 2027; 11% built in October 2026, so the date is very likely to move

under constructionHandover: Q4 2026 (Arada website, Jul 2026); DLD registered completion date 30 Jun 2026, now passed

off-planHandover: Q2 2029 (Beyond, 25 Nov 2025); DLD registered completion date 30 Sep 2028

under constructionHandover: Registered completion 30 Jun 2027; launched in Nov 2022 with a Q2 2025 date

under constructionHandover: DLD registered completion 20 Sep 2026 (passed; still on the register on 10 Oct 2026)

under constructionHandover: Q4 2026 (LMD); DLD registered completion date 31 Dec 2026

under constructionHandover: Q2 2027 (Maaia); registered completion date 14 January 2027 (DLD)

under constructionHandover: Registered completion 21 Aug 2028 for both phases; Dubai Properties gives Q3 2028

under constructionHandover: 31 December 2026 (DLD registered completion date); Q4 2026 per Grand Signature; Q1 2027 on some portals

under constructionHandover: 26 December 2026 (DLD registered completion date); Q4 2026 per developer; Q1 2027 on some portals

under constructionHandover: Registered completion 31 Dec 2026 (DLD); developer target December 2026

under constructionHandover: Q4 2027 (Prescott); registered completion date 31 August 2027 (DLD)

off-planHandover: Registered completion date 31 Jan 2030 (DLD); Q1 2030 on broker pages

under constructionHandover: Q3 2026 (developer); DLD registered completion date 30 Sep 2026, now passed

under constructionHandover: Registered completion date 15 June 2028 (DLD); Holm gives Q1 2028

under constructionHandover: 30 December 2026 (DLD registered completion date); Q4 2026 per LIV Developers

under constructionHandover: Phase 6 registered for 16 Jul 2026, now passed (developer Q3 2026); Phase 4 registered for 31 Mar 2027

under constructionHandover: Registered completion date 30 June 2026 (DLD), passed; Q3 2026 at launch; some portals now show Q2 2027

off-planHandover: Q4 2029 (Omniyat); DLD registered completion date 30 Dec 2029

under constructionHandover: Q1 2029, phased (Zaya); registered completion date 31 Mar 2029 (DLD)

under constructionHandover: Registered completion 15 Dec 2026; some portals list Q2 2027

under constructionHandover: Q1 2028 (Prestige One); registered completion date 30 Nov 2027 (DLD)

under constructionHandover: 31 Jul 2029 registered completion; Emaar gives July 2029 (Q3 2029)

under constructionHandover: Registered completion date 15 January 2026 has passed; not yet complete, portals now show Q3 2026

under constructionHandover: Q4 2027 (Pantheon and portals); registered completion date 31 October 2027 (DLD)

under constructionHandover: DLD registered completion 27 Mar 2028; brokers give Q1 2028

under constructionHandover: Q1 2027 (MAK Developers); DLD registered completion date 5 Sep 2027

under constructionHandover: Registered completion date 23 September 2026 has passed; building 37.75% complete in August 2026

under constructionHandover: DLD registered completion date 20 Jun 2027; developer says Q3 2027, its June 2026 press release Q4 2027

off-planHandover: DLD registered completion date 31 Dec 2028; developer Q4 2028 (December 2028)

under constructionHandover: Registered completion 21 Nov 2026; Propsearch shows a revised Q3 2027

under constructionHandover: Registered completion date 20 Sep 2029 (DLD); developer and portals give Q3 or Q4 2029

under constructionHandover: Registered completion date 31 Dec 2026 (DLD); Q1 2027 on Property Finder; Q4 2026 at launch

under constructionHandover: Registered completion date 10 December 2027 (DLD); Green Horizon gives Q1 2028

under constructionHandover: Q4 2027 (London Gate, Property Finder: Dec 2027); registered completion date 26 Oct 2028 (DLD)

under constructionHandover: Registered completion date 1 Apr 2027; portals list Q2 2027

under constructionHandover: Q3 2027 (Property Finder); DLD registered completion date 31 Aug 2027; Q2 2027 at launch

under constructionHandover: Registered completion date 31 Dec 2026; Mira Developments says Q4 2026

under constructionHandover: DLD registered completion date 30 Sep 2029; Emaar September 2029

under constructionHandover: Registered completion date 27 Jan 2027; first marketed for December 2026

under constructionHandover: DLD registered completion date 31 Dec 2028; developer Q4 2028

under constructionHandover: Registered completion date 12 Sep 2026 (DLD), now passed; listings show Q4 2026

handed overHandover: Handed over December 2024; DLD declared completion date 30 Dec 2024

off-planHandover: Registered completion date 1 Apr 2027 (DLD); Q2 2027 developer date; Q4 2027 in some listings

under constructionHandover: Registered completion date 12 Feb 2027; portals now show Q1 to Q2 2027

under constructionHandover: Registered completion date 26 Sep 2026 (DLD), now passed; Q2 2027 on Property Finder

under constructionHandover: Q3 2027 (Wadan); DLD registered completion date 1 Sep 2027

under constructionHandover: Q2 2028 (Zoya Developments); DLD registered completion date 30 Jun 2028

under constructionHandover: DLD registered completion 1 Jul 2027; developer and brokers give Q1 to Q2 2027

under constructionHandover: November 2027 (Danube); DLD registered completion date 30 Nov 2027

under constructionHandover: Q3 2027 (OCTA); registered completion date 30 Sep 2027 (DLD)

under constructionHandover: Registered completion date 30 Apr 2027; developer shows Q3 2027

off-planHandover: DLD registered completion date 31 Jul 2028; Q3 2028 (Property Finder); Q4 2027 in earlier marketing

under constructionHandover: Registered completion 31 Aug 2027 (DLD); marketed as Q3 2027

under constructionHandover: Q4 2026 (Binghatti); registered completion date 30 May 2026, passed

off-planHandover: DLD registered completion 31 Dec 2027; developer says December 2027

under constructionHandover: Q2 2028 (Iman Developers); DLD registered completion date 30 Jun 2028

under constructionHandover: Q2 2027 (Ellington Properties); DLD registered completion date 9 Jun 2027

handed overHandover: Handed over. DLD completion date 24 Apr 2025 for both towers

under constructionHandover: DLD registered completion 31 Mar 2026 (passed); developer now gives Q1 2027

under constructionHandover: Q1 2028 (Beyond, via Propsearch and Continental Club); DLD registered completion date 30 Nov 2027

under constructionHandover: Registered completion 31 Mar 2029 (DLD); Emaar gives Q1 2029

under constructionHandover: Q4 2026 (Nakheel); DLD registered completion date 31 Dec 2026 for all three towers; podium villas H1 2027

under constructionHandover: Registered completion date 8 Oct 2027 (DLD); Nakheel says first Palm Jebel Ali villa handovers run from late 2026 through 2027

under constructionHandover: Registered completion date 29 Sep 2027 (DLD); Nakheel says first Palm Jebel Ali villa handovers run from late 2026 through 2027

under constructionHandover: Tower A Q4 2026 (Bayut, JRE); Tower B registered completion date 1 Mar 2027

under constructionHandover: Registered completion date 31 Jan 2028 (DLD); January 2028 (Prestige One)

under constructionHandover: Q3 2029 (Beyond at launch); DLD registered completion date 31 Dec 2029

under constructionHandover: 31 Jan 2029 (DLD registered completion date); the developer and Property Finder still show Q4 2027

under constructionHandover: Registered completion 31 Mar 2026 (DLD), now passed; launch promise Q1 2026

under constructionHandover: DLD registered completion date 8 Jan 2029 for both towers; developer Q1 2029

under constructionHandover: DLD registered completion date 17 Nov 2028; Wasl Q4 2028 (December 2028)

under constructionHandover: Registered completion 1 Jan 2027 (DLD); marketed as Q1 2027

under constructionHandover: 30 Jun 2027 (DLD registered completion date); Property Finder shows Q4 2027

off-planHandover: Q2 2029 (launch material); DLD registered completion date 1 Dec 2029

under constructionHandover: No registered completion date on the DLD register; Property Finder lists Q2 2027 and some agents Q4 2026; 26.71% built in March 2026, so both dates look unlikely

under constructionHandover: REEF 1000 registered for 30 December 2026; REEF 999 30 June 2027; REEF 998 30 June 2028; REEF 996 30 September 2028; REEF 995 30 November 2028

under constructionHandover: Q4 2026 (Vision Developments); DLD registered completion date 31 Dec 2026

under constructionHandover: 30 Jun 2028 (DLD registered completion date); developer and portals show Q4 2028

under constructionHandover: Registered completion date 31 Dec 2027; marketed as Q4 2027

under constructionHandover: 31 Dec 2027 (DLD registered completion date); Grovy states Q4 2027

under constructionHandover: Registered completion dates of 2 May 2026 (Rose Gardens 3), 23 Jul 2026 (Rose Gardens 1) and 30 Aug 2026 (Rose Gardens 2) have all passed; no new dates on the register

handed overHandover: Handed over. DLD handover date 1 Jun 2025; registered completion date 31 Mar 2023

under constructionHandover: 31 Mar 2028 (DLD registered completion date); developer and Property Finder show Q4 2027

under constructionHandover: DLD registered completion 31 Dec 2026; developer date 31 Mar 2027

under constructionHandover: 10 Nov 2027 (DLD registered completion date); Property Finder shows December 2027

under constructionHandover: Q4 2027 (developer, via Continental Club); DLD registered completion date 31 Mar 2027

under constructionHandover: DLD registered completion 30 Jun 2029; developer says Q1 2029

under constructionHandover: December 2027 (Samana); DLD registered completion date 31 Dec 2027

under constructionHandover: 31 Oct 2028 (DLD registered completion date); Samana states Q2 2028

under constructionHandover: DLD registered completion 31 Mar 2028; Samana now states Q3 2028

under constructionHandover: Q2 2028 (Samana Developers, accessed 11 Oct 2026); DLD registered completion date 31 Mar 2027

under constructionHandover: Q3 2029 (Samana); DLD registered completion date 30 Sep 2029

under constructionHandover: Q3 2028 (Samana); DLD registered completion dates 30 Sep 2028 and 31 Oct 2028 (Business Park 2)

under constructionHandover: 28 Feb 2028 (DLD registered completion date); Samana now states Q2 2028

under constructionHandover: 31 Dec 2028 (DLD registered completion date); Samana states Q1 2029

under constructionHandover: Ivy Gardens 2: Q4 2027, DLD registered completion date 31 Dec 2027. Ivy Gardens: May 2026 target passed, no new date published

under constructionHandover: Samana now states February 2027; registered completion date of 30 Apr 2026 has passed

under constructionHandover: Samana now states Q1 2027; registered completion date of 30 Apr 2026 has passed

under constructionHandover: Q4 2027 (Samana, accessed 11 Oct 2026); DLD registered completion date 31 Mar 2027; March 2027 at launch

under constructionHandover: 31 Aug 2027 (DLD registered completion date); March 2028 announced at launch

under constructionHandover: Registered completion date 30 Sep 2028; Samana targets Q3 2028

under constructionHandover: Registered completion date 30 May 2028; Samana now states Q3 2028

under constructionHandover: Q4 2027 (Samana via Property Finder); DLD registered completion date 31 Dec 2027

under constructionHandover: Q3 2028 (Bayut, Property Finder); DLD registered completion date 31 Jul 2028

off-planHandover: Q2 2029 (Samana); DLD registered completion dates 31 Dec 2028 (South Haven) and 30 Jun 2029 (South Haven 2)

under constructionHandover: Waves 1: Q1 2027 (Samana); registered completion date 15 Apr 2026, passed. Waves 2: Q3 2027 (Samana); registered 20 Mar 2026, passed

under constructionHandover: Q4 2026 (developer); DLD registered completion date 15 Oct 2026, unlikely to be met at 52.07% built in Aug 2026

under constructionHandover: Q4 2026 (developer); DLD registered completion date 15 Dec 2026

under constructionHandover: Registered completion 31 Oct 2027 (DLD); marketed as Q4 2027

under constructionHandover: Q1 2028 (Beyond); DLD registered completion date 1 Oct 2027

under constructionHandover: 30 Nov 2026 (DLD registered completion date); an Alnair launch report in June 2025 gave 30 June 2027

under constructionHandover: 15 Aug 2028 (DLD registered completion date); Imtiaz announced Q1 2028 at groundbreaking

under constructionHandover: December 2026 (Prestige One); DLD registered completion date 25 Dec 2026

under constructionHandover: Registered completion 30 Mar 2029 (DLD); Beyond states Q1 2029

off-planHandover: Registered completion 1 Apr 2028 (DLD); Q4 2027 in early marketing

under constructionHandover: Registered completion date 15 Dec 2027; Wadan states Q4 2027

under constructionHandover: Registered completion date 31 Dec 2029; Danube says 2029

under constructionHandover: Q2 2029 (registered completion 30 Jun 2029)

under constructionHandover: Q2 2029 (Iman Developers); DLD registered completion date 30 Jun 2029

under constructionHandover: Registered completion date 29 February 2028; Tiger announced Q1 2028 at launch

under constructionHandover: Q4 2027 in launch listings; DLD registered completion date 20 Jan 2029

off-planHandover: 30 May 2030 (DLD registered completion date); launch material gave Q4 2028

handed overHandover: Handover began April 2026, six months before the October 2026 completion date in the RERA brochure

handed overHandover: Handed over. DLD completion recorded 6 Aug 2026; Sobha announced handover on 1 Sep 2026

under constructionHandover: DLD registered completion 15 Sep 2028; SOL Properties Q3 2028

under constructionHandover: Registered completion date 30 May 2028 (DLD); Q2 2028 (developer)

under constructionHandover: Q3 2027 (SOL Properties at launch); DLD registered completion date 15 Aug 2027

under constructionHandover: Registered completion 31 Dec 2026 (DLD); Q4 2026 at launch

off-planHandover: Q1 2029 (Beyond); DLD registered completion date 30 Dec 2028

under constructionHandover: Dubai South plans South Bay handovers in 2026; DLD registered dates of 10 Mar 2025 (South Bay 1) and 30 May 2026 (South Bay 2) have passed; phase 4 Q1 2027

under constructionHandover: Q4 2027 (Wellington); DLD registered completion date 15 Dec 2027

under constructionHandover: Q4 2029 (developer, via Continental Club and Bayut listings); DLD registered completion date 10 Nov 2029

under constructionHandover: Q4 2026 (Emaar, via Property Finder); DLD registered completion date 25 Dec 2026

under constructionHandover: Q4 2026 (Nuri Living, via portals); DLD registered completion date 31 Dec 2026

under constructionHandover: Registered completion 15 Feb 2028 (DLD); Imtiaz targets December 2027

under constructionHandover: Registered completion 15 Jun 2027 (DLD); Q2 2027 (developer)

off-planHandover: Registered completion 30 Jun 2028 (DLD); some listings say Q1 2029

under constructionHandover: Phase 1: 20 Dec 2027 (DLD registered completion date), marketed as Q4 2027. Phase 2: 6 Jul 2029 (DLD)

under constructionHandover: 31 Mar 2028 (DLD registered completion date); Property Finder shows Q1 2028, some brokers Q3 2028

under constructionHandover: 31 Dec 2027 (DLD registered completion date); Q2 2027 given in July 2025, Q4 2027 on current listings

under constructionHandover: Q2 2028 (Dugasta, via EZRE); DLD registered completion date 30 Apr 2027

under constructionHandover: DLD registered completion 31 Aug 2028; developer Q3 2028

under constructionHandover: Q1 2028 (Prestige One, via Propsearch and Continental Club); DLD registered completion date 30 Nov 2027

off-planHandover: Q3 2028 (Prescott); DLD registered completion date 15 May 2028

under constructionHandover: Registered completion 31 Mar 2028 (DLD); marketed as Q2 2028

under constructionHandover: Q1 2029 (Al Seeb); DLD registered completion date 28 Feb 2029

under constructionHandover: 31 Oct 2027 (DLD registered completion date); AQUA markets Q4 2027

off-planHandover: DLD registered completion 31 Jan 2030; Meraas estimates June to August 2030

under constructionHandover: Registered completion 10 Jul 2028 (DLD); Q2 2028 at launch; Q4 2028 (Propsearch)

under constructionHandover: June 2027 (Prestige One); DLD registered completion 30 Jun 2027

under constructionHandover: Towers A and B: registered completion 31 Jul 2026, passed and not updated (DLD). Tower C: registered completion 31 Mar 2027 (DLD); marketed as Q4 2027

under constructionHandover: 15 Jul 2027 (DLD registered completion date); portals show July 2027 or Q3 2027

under constructionHandover: 31 Dec 2027 (DLD registered completion date); portals show Q4 2027

off-planHandover: Q2 2028 (AMIS); registered completion date 30 Apr 2028 (DLD)

under constructionHandover: November 2026 (Metrical); registered completion date 25 November 2026 (DLD)

under constructionHandover: Q2 2029 (Aldar); registered completion dates 31 Jan 2029 to 31 May 2029 (DLD)

off-planHandover: Q2 2030 (Aldar); registered completion date 30 Jun 2030 (DLD)

under constructionHandover: Registered completion 30 Jun 2027 (DLD); marketed as Q1 2027

under constructionHandover: Developer date Q4 2028 (December 2028 on Property Finder); no completion date in the DLD register; 10.24% built in September 2026

under constructionHandover: Registered completion 31 Dec 2026 (DLD, revised from 31 Dec 2021 in Aug 2026); marketed as Q1 2027

off-planHandover: Registered completion 15 Dec 2028 (DLD); marketed as Q4 2028

under constructionHandover: Registered completion 15 Oct 2027 (DLD); marketed as Q4 2027

under constructionHandover: DLD registered completion 30 Mar 2028; Wadan states Q1 2028

under constructionHandover: DLD registered completion 1 Apr 2026 (passed); developer Q2 2026; portals now list Q4 2026

under constructionHandover: Registered completion 30 Dec 2026 (DLD); Kasco states Q4 2026

under constructionHandover: Registered completion date 31 August 2026 (passed); developer-supplied handover Q3 2027

under constructionHandover: Registered completion 31 Dec 2027 (DLD); Gutti states Q4 2027

under constructionHandover: Prescott states Q3 2027; DLD registered completion date 31 Dec 2026

off-planHandover: 30 Sep 2028 (Verdana 3, 4, 5), 31 Dec 2028 (Verdana 6, 7, 8), 31 Mar 2029 (Verdana 9, 10), DLD registered completion dates

under constructionHandover: Registered completion 30 Sep 2027 (DLD); marketed as Q2 2027 at launch

under constructionHandover: DLD registered completion 31 May 2029; portals list Q2 2029

under constructionHandover: DLD registered completion 30 Jul 2026 (passed); developer Q2 2026; portals Q3 2026

under constructionHandover: 15 Feb 2030 (DLD registered completion date); Q2 2029 given at launch

under constructionHandover: Registered completion 1 Sep 2027 (DLD); Q3 2027 (developer)

under constructionHandover: Registered completion 30 Sep 2026, passed and not updated (DLD); listings show Q1 to Q2 2027

under constructionHandover: No registered completion date on the DLD register; Property Finder lists December 2026 (Q4 2026); 51.1% built in October 2026, so a 2026 handover is not realistic

under constructionHandover: Q4 2026 (developer, via Continental Club); DLD registered completion date 1 Oct 2026, passed

under constructionHandover: Registered completion date 31 January 2028; developer says Q1 2028

under constructionHandover: DLD registered completion 24 Jan 2028; developer Q4 2027

under constructionHandover: DLD registered completion 19 Dec 2027; developer Q4 2027

under constructionHandover: DLD registered completion 16 Dec 2028; developer Q4 2027

off-planHandover: Wadan states Q4 2028; DLD registered completion date 31 Dec 2028 (moved earlier from 28 Apr 2029)

under constructionHandover: Registered completion date 31 Jul 2029 (DLD); Q3 2029 per Bayut and developer data

under constructionHandover: Registered completion 30 Sep 2027 (DLD); Q3 2027 (Imtiaz)
01 to 04: rank by registered sales, H1 2026 (Reliant Surveyors). Binghatti Skyflame's figure covers May 2026 only, so it is not ranked.