Binghatti Hillcrest
Low-rise Binghatti apartment building in Arjan with a registered completion date of 31 December 2026. DLD recorded it 60% built on 17 September 2026.
Short answer
Binghatti Hillcrest is due for completion on 31 December 2026, its registered completion date at the Dubai Land Department (DLD), and is marketed for Q4 2026. The DLD inspection on 17 September 2026 recorded it 60% complete, up from about 50% on 31 July 2026. The five storey building in Arjan launched in October 2025 with studios from about AED 807,000 to AED 828,000; Binghatti listed studios from AED 819,999 in October 2026.
- Status
- under construction
- Handover date
- Registered completion date 31 Dec 2026; marketed as Q4 2026
- Construction
- 60% complete (DLD inspection, 17 Sep 2026)
- Payment plan
- 50/50 for studios and 1 bedrooms at launch; 20/50/30 for other units
- Starting price
- Studios from AED 819,999 (Binghatti, Oct 2026)
Registered completion date
31 Dec 2026
DLD register via Continental Club
Construction progress
60%
DLD inspection, 17 Sep 2026
Units on the DLD register
396
Including 28 shops; Binghatti cites over 322 homes
Median studio sale
AED827,999
117 DLD sales, Continental Club, Oct 2026
When will Binghatti Hillcrest be handed over?
Binghatti Hillcrest is due for completion on 31 December 2026. That is its registered completion date at the Dubai Land Department (DLD), DLD project 4105, and the date Binghatti gave when it launched the project in October 2025. Brokers and portals market it as Q4 2026, and Propsearch estimates December 2026.
At the DLD inspection on 17 September 2026, the building was 60% complete (DLD project register via Continental Club, inspection 17 September 2026). That left 40% of the work for the final three and a half months before the registered date. No change to the date had been filed as of 4 October 2026 (Mitchells).
Building-by-building dates and how the date has changed: Binghatti Hillcrest handover date.
Binghatti Hillcrest construction update
Construction started on 1 October 2025, according to the DLD register. Progress rose by 9.77 percentage points between the inspections of 31 July 2026 and 17 September 2026, to 60% (Continental Club). That puts the 31 July figure at about 50%.
The main contractor is Millionaire Building Contracting and the architect is Silver Stone Engineering Consultants (Propsearch). DLD’s filed description is a basement, ground floor, four residential floors and a roof. The plot was first meant for a cancelled project called Pearl Mizin, and the developer’s filed build cost is AED 135 million (Propsearch).
Binghatti Hillcrest homes and sizes
The DLD register lists 396 units. Binghatti describes “over 322” homes plus 28 ground floor shops, and Propsearch estimates 350 units. Nearly all homes are studios and 1 bedrooms.
| Unit type | Units | Typical size |
|---|---|---|
| Studio | 207 | 360 to 718 sq ft |
| 1 bedroom | 157 | 681 to 998 sq ft |
| 2 bedroom | 4 | 1,134 sq ft |
| Shops and other units | 28 | 996 to 2,219 sq ft |
Counts and sizes are from Continental Club’s DLD unit data, accessed 11 October 2026. Binghatti’s page lists the smallest studio at 363 sq ft.
Binghatti Hillcrest prices and resale
Binghatti released Hillcrest in October 2025. Launch material gave studios from AED 828,000 and 1 bedrooms from AED 1.325 million, with an offer that ran to 31 October 2025 (broker post, 18 October 2025); other brokers listed studios from AED 806,999. In October 2026 Binghatti listed studios from AED 819,999 for 363 sq ft.
The DLD register shows 237 sales from 25 August 2025 to 2 October 2026, with a median of AED 2,061 per sq ft and a median price of AED 895,000 (Mitchells). The quarterly median rose from AED 2,001 per sq ft in Q1 2026 to AED 2,242 in Q3 2026. Continental Club’s figures put the median studio sale at AED 827,999 (117 sales) and the median 1 bedroom at AED 1,348,999 (108 sales). The project’s median per sq ft was 19% above the Arjan off-plan median of AED 1,728 over the year to 5 October 2026, partly because most units are small studios.
Binghatti Hillcrest payment plan
At launch, studios and 1 bedrooms were sold on a 50/50 plan: 10% plus the 4% DLD fee on booking, 10% in November 2025, 1% a month to November 2026 with further 10% instalments in March and July 2026, and 50% on completion (Katalystor). Two bedrooms and shops were sold on 70/30. Binghatti’s standard 20/50/30 plan is also listed, and in October 2026 one broker listed a 50/20/30 option (Impala, 8 October 2026). Under the 50/50 plan, half the price is due at completion, so the 31 December 2026 date matters for buyers’ cash planning. A published service charge of AED 15 per sq ft a year has been quoted for the building (Impala).
Binghatti Hillcrest developer and delivery record
Binghatti Developers was founded in 2008. DLD records show 36 delivered Binghatti projects and 10,899 homes handed over, with 32 more in development (Oliva, accessed 11 October 2026). Hillcrest was described at launch as Binghatti’s only low-rise project in Arjan. It sits near Binghatti Hills, which was 90% complete in July 2026 after passing its Q2 2026 target. Other Binghatti dates for 2026 are on the Binghatti handover date tracker.
What to check before buying at Binghatti Hillcrest
- The completion payment. On the 50/50 plan, half the price falls due at completion, which is registered for 31 December 2026.
- The SPA date and grace period. At 60% on 17 September 2026, 40% of the work remained with about 15 weeks to the registered date.
- The building name. Binghatti Hillcrest in Arjan is a different project from Binghatti Hills, Binghatti Hillside and Binghatti Hillviews in Dubai Science Park.
- Service charges. The AED 15 per sq ft figure is a published estimate; the RERA-approved budget is set once the building is operating.
Binghatti Hillcrest location: Arjan, Dubailand, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Binghatti Hillcrest handover date?
The registered completion date at DLD is 31 December 2026, and the project is marketed for Q4 2026. The DLD inspection on 17 September 2026 recorded 60% complete (DLD project register via Continental Club).
What is the Binghatti Hillcrest completion date?
31 December 2026, as filed with DLD for project 4105. Binghatti's launch material in October 2025 gave the same date. Propsearch's estimate is December 2026.
What is the Binghatti Hillcrest payment plan?
At launch in October 2025, studios and 1 bedrooms were sold on a 50/50 plan: 10% on booking, 10% in November 2025, 1% a month to November 2026 with three 10% instalments along the way, and 50% on completion. Two bedrooms and shops were sold on 70/30. Binghatti's standard 20/50/30 plan is also listed.
What is the Binghatti Hillcrest price?
Studios launched from about AED 807,000 to AED 828,000 and 1 bedrooms from AED 1.325 million in October 2025. In October 2026 Binghatti listed studios from AED 819,999 for 363 sq ft. DLD sales had a median of AED 827,999 for studios and AED 1,348,999 for 1 bedrooms (Continental Club).
How many floors does Binghatti Hillcrest have?
DLD records a basement, ground floor, four residential floors and a roof. Binghatti calls it a six storey building and Propsearch a five storey one.