Illustration: a residential tower under construction at dusk
Binghatti Developers · Dubai Science Park

Binghatti Hills

Binghatti Hills: 1,666 studio, 1 and 2 bedroom homes in Dubai Science Park, studios from AED 800,000 (Oct 2026), on a 20/50/30 plan.

Studio, 1 and 2 bedroom apartments

How this page was made: figures from the DLD project register and the developer and portal pages listed under Sources, as at 12 October 2026. Text drafted with AI assistance from those sources. Every figure matched the fact records at the build on 12 November 2026. Not yet reviewed line by line by a person. How facts are checked

Status
under construction
Handover date
Q2 2026 target (Binghatti), now passed; portal dates Q3 2026 to Q2 2027 Full handover record
Construction
90% complete (DLD inspection, 24 Jul 2026)
Payment plan
20% booking, 50% construction, 30% completion
Starting price
From AED 800,000 for a studio (Binghatti, Oct 2026)

Published handover target

Q2 2026

Binghatti, now passed

Construction progress

90%

DLD inspection, 24 Jul 2026

Total units

1,666

Binghatti: 852 studios, 528 1BR, 286 2BR. The DLD register lists 1,701 units in 2 buildings (4 Oct 2026)

Price from

AED800,000

Binghatti project page, 12 Oct 2026

Registered median, all sales

AED 1,893 per sq ft

457 DLD sales, 28 Apr 2025 to 5 Oct 2026. Mitchells

Binghatti Hills overview

Binghatti Hills is an apartment project by Binghatti Developers in Dubai Science Park, filed with the Dubai Land Department (DLD) as project 3053 in the Al Barsha South Second area. Binghatti describes 2 basement levels, 3 podium levels, a mechanical floor, 41 residential floors and a roof. The DLD register lists 2 buildings, while Property Finder lists 3.

Binghatti lists 1,666 homes: 852 studios, 528 one bedroom and 286 two bedroom apartments, plus 21 shops on the ground floor. The DLD register counted 1,701 units on 4 October 2026. Amenities include an infinity pool, a jacuzzi, a gym, a padel tennis court and a jogging track (Property Finder).

Sales started on 1 April 2024, the same date as the registered construction start. The project is under construction, at 90% complete at the DLD inspection on 24 July 2026, and its Q2 2026 completion date has passed.

Binghatti Hills prices

Unit type Size (sq ft) Price from (AED) Source, date
Studio 445 to 726 800,000 Binghatti project page, 12 Oct 2026
1 bedroom 750 to 2,208 1.2 million (registered sale) DLD via Data Habibi, 25 Sep 2026
2 bedroom 1,346 to 4,201 2 million (registered sale) DLD via Data Habibi, 17 Sep 2026

Sizes are from floor plans on Data Habibi. Binghatti publishes one “from” price for the project. Sources differ on the launch price: Data Habibi gives AED 780,000, Continental Club AED 798,000, and an earlier Binghatti listing put 2 bedroom homes from AED 3,077,646. Property Finder marks the project sold out.

Recent DLD-registered sales: studios at AED 710,000 to AED 800,000 (446 to 504 sq ft, 7 September to 1 October 2026); 1 bedroom units at AED 1.2 million to AED 1.5 million (751 to 1,234 sq ft); and 2 bedroom units at AED 2 million to AED 3.22 million (1,346 to 1,783 sq ft) (Data Habibi). Across 457 sales from 28 April 2025 to 5 October 2026, the median was AED 1,893 per sq ft: AED 2,132 for studios, AED 1,644 for 1 bedroom and AED 1,847 for 2 bedroom units (Mitchells). All were registered before completion.

Binghatti Hills payment plan

Binghatti’s published plan is 70/30 (project page, accessed 12 October 2026):

Stage Share Timing
Down payment 20% On signing the contract, plus the 4% DLD fee
During construction 50% Instalments while the building is built
On completion 30% At handover

There is no post-handover plan. On a studio at AED 800,000, the buyer pays AED 160,000 at booking, AED 400,000 during construction and AED 240,000 on completion, plus the AED 32,000 DLD fee. Resale buyers usually take on the 30% completion payment from the original buyer.

Binghatti Hills location

Binghatti Hills is in Dubai Science Park, in Al Barsha South 2, with access to Al Khail Road and Umm Suqeim Road (Property Finder). Binghatti gives drive times of 8 minutes to Dubai Hills Mall, 9 minutes to King’s College Hospital, 12 minutes to Dubai Hills Golf Club and Al Barsha Mall, and 15 minutes to Mall of the Emirates and Global Village. Property Finder lists 4 minutes to Dubai Miracle Garden and 20 minutes to Dubai Marina. Binghatti Hillside and Binghatti Hillviews are separate towers in the same district.

Is Binghatti Hills a good investment?

The registered median of AED 1,893 per sq ft was about 7.6% above the Al Barsha South Second off-plan median of AED 1,759 per sq ft over the 12 months to 5 October 2026, though Mitchells notes the comparison does not control for unit mix. The quarterly median rose from AED 1,687 per sq ft in Q2 2025 to AED 1,847 in Q2 2026. The building adds 852 studios, 528 one bedroom and 286 two bedroom homes at once, which can weigh on early rents. The main points for a buyer are the missed Q2 2026 date and the 30% due on completion.

Binghatti Hills handover date

Latest position: Q2 2026 target (Binghatti), now passed; portal dates Q3 2026 to Q2 2027. Construction: 90% complete (DLD inspection, 24 Jul 2026). The full record, with how the date has changed and what it means for your payments, is on the Binghatti Hills handover date page.

What to check before booking at Binghatti Hills

  1. The current construction status, since the published Q2 2026 target has passed without an update. Ask Binghatti’s sales team for a written revised date.
  2. The DLD project status for the exact building, through Dubai Land Department’s project status enquiry service.
  3. The DLD registration fee, an additional 4% of the price, which is separate from the instalments above.
  4. The tower name and unit type, since Hills, Hillside and Hillviews are separate projects, and studios, 1 and 2 bedroom units are priced differently.

Binghatti Hills location: Dubai Science Park, Dubai

Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.

Questions buyers also ask

What is the Binghatti Hills payment plan?

Binghatti's published plan is 20% on booking, 50% during construction and 30% on completion (accessed 12 October 2026). There is no post-handover plan.

What is the starting price of Binghatti Hills?

Binghatti lists homes from AED 800,000 (project page, accessed 12 October 2026). A 504 sq ft studio was registered with DLD at AED 800,000 on 1 October 2026 (Data Habibi). Launch prices are given as AED 780,000 (Data Habibi) or AED 798,000 (Continental Club).

How many units does Binghatti Hills have?

1,666 homes in total, 852 studios, 528 one bedroom and 286 two bedroom apartments, plus 21 ground floor shops, per Binghatti. The DLD project register lists 1,701 units across 2 buildings (4 Oct 2026).

What do homes at Binghatti Hills cost?

Recent DLD-registered sales ran from AED 710,000 to AED 800,000 for studios, AED 1.2 million to AED 1.5 million for 1 bedroom units and AED 2 million to AED 3.22 million for 2 bedroom units (Data Habibi, 7 September to 1 October 2026).

Where is Binghatti Hills located?

Dubai Science Park, in Al Barsha South 2, with access to Al Khail Road and Umm Suqeim Road (Property Finder). Binghatti gives an 8 minute drive to Dubai Hills Mall and 9 minutes to King's College Hospital.

Who is the developer of Binghatti Hills?

Binghatti Developers, registered with DLD as Binghatti Developers FZE (project 3053). Binghatti also builds Binghatti Hillside and Binghatti Hillviews in the same district.

What unit types are available at Binghatti Hills?

Studios of 445 to 726 sq ft, 1 bedroom apartments of 750 to 2,208 sq ft and 2 bedroom apartments of 1,346 to 4,201 sq ft (Data Habibi floor plans, October 2026).

Sources

Request a Unit Review