A 121 unit Unique Saray building in Dubailand Residence Complex, registered for completion on 31 October 2027 and 2.22% built in September 2026. Prices, payment plan and sizes.
Short answer
Saray Prime Residence has a registered completion date of 31 October 2027, inside the Q4 2027 handover Unique Saray has marketed since launch in November 2025. The DLD inspection on 21 September 2026 recorded the Dubailand Residence Complex building only 2.22% complete, up from 1.7% in June. Launch prices started from about AED 580,000, and registered sales have a median of AED 718,000, or AED 1,345 per sq ft.
- Status
- under construction
- Handover date
- Registered completion 31 Oct 2027 (DLD); marketed as Q4 2027
- Construction
- 2.22% complete (DLD inspection, 21 Sep 2026)
- Payment plan
- 60/40: 60% by completion, 40% on handover (terms vary by source)
- Starting price
- From about AED 580,000 at launch (Nov 2025)
Registered completion date
31 Oct 2027
DLD project register via Continental Club and Dubai Data
Construction progress
2.22%
DLD inspection, 21 Sep 2026
Units
121
DLD register: 77 studios, 33 one bedrooms, 11 two bedrooms (Tanami)
Median registered sale price
AED718,000
AED 1,345 per sq ft, 53 sales, data through 30 Sep 2026, Dubai Data
When will Saray Prime Residence be handed over?
The Dubai Land Department (DLD) register gives Saray Prime Residence a completion date of 31 October 2027. Unique Saray has marketed a Q4 2027 handover since the launch in November 2025. Property Finder and Data Habibi give December 2027, two months after the registered date.
The building was 2.22% complete at the DLD inspection on 21 September 2026. That leaves almost all of the work to do in about 13 months, so the registered date is ambitious on the progress recorded so far.
Building-by-building dates and how the date has changed: Saray Prime Residence handover date.
Saray Prime Residence construction update
The register records the project as registered on 21 November 2025, with construction starting on 15 November 2025. DLD inspectors recorded 0% on 5 November 2025, 1.7% on 11 June 2026 and 2.22% on 21 September 2026 (Dubai Data). That is an average of about 0.2 percentage points a month since November 2025.
The building has two basements, a ground floor, 11 residential floors and a roof (Tanami Properties). It sits in Wadi Al Safa 5 in the register, DLD project number 4058, with the escrow account at Emirates NBD.
Saray Prime Residence homes and sizes
The register lists 121 units. Tanami Properties gives the mix as 77 studios, 33 one bedrooms and 11 two bedrooms, with a few units carrying private pools or jacuzzis. Data Habibi gives 151 units, which does not match the register. Apartments are sold furnished.
| Home type | Units | Developer floor plan sizes | Registered sales | Median price |
|---|---|---|---|---|
| Studio | 77 | 426 to 531 sq ft | 31 | AED 627,000 |
| 1 bedroom | 33 | 683 to 806 sq ft | 14 | AED 930,000 |
| 2 bedroom | 11 | Up to 1,456 sq ft | 8 | AED 1.40 million |
Sizes are from Tanami Properties’ floor plan table. Sales are DLD registrations through September 2026, via Dubai Data.
Saray Prime Residence prices and resale
Launch prices started from AED 580,000 (Binayah), AED 585,000 (Proprain) or AED 615,000 (Kotook, 15 November 2025), depending on the release. Dubai Data counts 53 registered sales, all off-plan, at a median of AED 718,000, or AED 1,345 per sq ft. Registered sales peaked at 18 in February and 20 in March 2026, then slowed to a handful a month.
Recent registrations include a 425 sq ft studio at AED 630,528 on 13 August 2026 and an 849 sq ft 1 bedroom at AED 1.06 million on 13 July 2026 (Dubai Data). The 2 bedrooms have sold near AED 1,025 per sq ft, well below the studios at about AED 1,520 per sq ft.
Saray Prime Residence payment plan
Sources describe the plan differently. Binayah and Proprain call it 60/40, with 1% monthly instalments during construction and 40% on handover. Data Habibi lists 10% down, 50% during construction and 40% on handover. OffplanIndex shows two plans on offer. All versions leave 40% due at handover, plus the 4% DLD fee at booking. Buyers who rely on a mortgage for that 40% will need it approved for late 2027 or later.
Saray Prime Residence developer and delivery record
Unique Saray Development, registered with the DLD as Unique Saray Properties, is based in Bay Square, Business Bay. Its website lists a second project, Saray South Residence in Dubai South, as coming soon. Saray Prime Residence is its first registered project in Dubai, so the company has no completed building to judge its delivery record by.
What to check before buying at Saray Prime Residence
- The completion date in the SPA, which may say 31 October 2027, Q4 2027 or December 2027.
- Which payment plan applies, since the 60/40 and 10/50/40 versions put different amounts into the construction period.
- The next DLD inspection figure. At 2.22% in September 2026, progress needs to pick up sharply to finish in 2027.
- The unit type’s registered prices, since 2 bedrooms and studios have sold at very different rates per sq ft.
Saray Prime Residence location: Dubailand Residence Complex, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Saray Prime Residence handover date?
The DLD register gives a completion date of 31 October 2027. Unique Saray and agents market Q4 2027, while Property Finder and Data Habibi give December 2027.
What is the Saray Prime Residence completion date?
31 October 2027 in the DLD register. The building was 2.22% complete at the DLD inspection on 21 September 2026 (DLD project register via Continental Club).
What is the Saray Prime Residence price?
Launch prices started from about AED 580,000 to AED 615,000 for a studio, depending on the source. Registered sales through September 2026 had medians of AED 627,000 for studios, AED 930,000 for 1 bedrooms and AED 1.40 million for 2 bedrooms (Dubai Data).
What is the Saray Prime Residence payment plan?
Agents describe a 60/40 plan with 1% monthly instalments and 40% on handover (Proprain, Binayah). Data Habibi lists 10% down, 50% during construction and 40% on handover. The SPA sets the actual schedule.