Aura Prestige
An 81 unit Aura Infinite building in Dubai Silicon Oasis, registered for completion on 1 November 2026 but 40.06% built on 1 October 2026. Completion date, prices, 60/40 plan.
Short answer
Aura Prestige has a registered completion date of 1 November 2026, but the DLD inspection on 1 October 2026 recorded the Dubai Silicon Oasis building only 40.06% complete, so that date will pass with the building unfinished. Agents have marketed handover for Q4 2026 or Q1 2027, and no revised date has been published. 2 bedroom homes have registered at a median of about AED 1.53 million, and the plan is 20% down, 40% during construction and 40% on handover.
- Status
- under construction
- Handover date
- Registered completion 1 Nov 2026 (DLD), not achievable at current progress; Q4 2026 to Q1 2027 in marketing
- Construction
- 40.06% complete (DLD inspection, 1 Oct 2026)
- Payment plan
- 20% down, 40% during construction, 40% on handover
- Starting price
- From about AED 1.47 million to AED 1.51 million for a 2 bedroom (agent listings)
Registered completion date
1 Nov 2026
DLD project register via Continental Club
Construction progress
40.06%
DLD inspection, 1 Oct 2026
Units
81
DLD register; 76 homes and 5 commercial units
Median registered sale price
AED 1.57 million
AED 1,281 per sq ft, 12 months to Aug 2026, Dubai Data
When will Aura Prestige be handed over?
The Dubai Land Department (DLD) register, where the project is listed as Aura Prestige under Aura Infinite Real Estate Development, gives a completion date of 1 November 2026. Property Finder and Proprain list Q4 2026, while Grand Reve Realty and JRE give Q1 2027.
None of these dates fits the latest inspection. On 1 October 2026, DLD inspectors recorded the building 40.06% complete, one month before the registered date. Between 30 April and 1 October 2026, progress rose by about 19 percentage points, close to 4 points a month. At that pace the remaining 60% would take about 15 months, which points to early 2028. That is a calculation from DLD figures. The developer has not published a revised date.
Building-by-building dates and how the date has changed: Aura Prestige handover date.
Aura Prestige construction update
The register records construction starting on 1 June 2025 and registration with the DLD on 25 September 2025. Inspections recorded 0% on 1 June 2025, 20.65% on 30 April 2026 and 40.06% on 1 October 2026 (Dubai Data; Continental Club). That is about 3.9 points a month since April, against about 1.9 points a month from June 2025 to April 2026.
The building has a lower ground floor, a ground floor and 8 upper floors, with shops at the base (Proprain; Continental Club). It sits in the Nadd Hessa district in DLD records, and the Dubai Silicon Oasis Authority is the regulator (Dubai Handover). The DLD project number is 3788 and buyer payments go to an escrow account at Dubai Islamic Bank. JRE names HAO Architects as the designer.
Aura Prestige homes and sizes
The DLD register counts 81 units. Proprain breaks them down as 76 homes and 5 commercial units.
| Home type | Units | Typical size |
|---|---|---|
| 2 bedroom | 61 | 1,159 to 1,273 sq ft |
| 3 bedroom | 15 | 1,510 to 1,578 sq ft |
| Other units | 5 | 727 to 1,040 sq ft |
Source: DLD register via Continental Club, registry updated 4 October 2026. The size range leaves out the smallest and largest 5% of each type. Agent listings give smallest sizes of 1,158 sq ft for 2 bedrooms and 1,527 sq ft for 3 bedrooms.
Aura Prestige prices and resale
Grand Reve Realty listed 2 bedrooms from AED 1,506,818 and 3 bedrooms from AED 1,987,147, and Proprain gave a starting price of AED 1.47 million. Neither page is dated. Property Finder now lists the project as sold out from the developer, with resale units from AED 1.54 million.
The DLD recorded 70 off-plan sales in the 12 months to August 2026 at a median of AED 1.57 million, or AED 1,281 per sq ft (Dubai Data, data through 30 September 2026). The 52 sales of 2 bedrooms had a median of AED 1.53 million for about 1,203 sq ft. The 13 sales of 3 bedrooms had a median of AED 2.00 million for about 1,560 sq ft. Sales started in February 2026 and peaked at 19 in March. On 26 August 2026 a 3 bedroom registered at AED 2.00 million, and 2 bedrooms sold in August for AED 1.46 million to AED 1.54 million.
Aura Prestige payment plan
The plan is 60/40: 20% down payment, 40% during construction and 40% on handover (Grand Reve Realty; JRE; Proprain). The 4% DLD fee is extra. The 40% balance is due at completion. With the registered date about to pass, that payment is likely to fall due later than 1 November 2026.
Aura Prestige developer and delivery record
Aura Infinite Real Estate Development registered with the DLD in August 2023 (Oliva, 2 April 2026). Oliva counted four registered projects with 314 units, none of them recorded as completed at that time. Its most advanced, Aura Elegance in Dubai Silicon Oasis, was 80% complete. Property Finder now lists Aura Elegance as ready, alongside Aura Elite and Aura Central, which are still being built (accessed 11 October 2026). With at most one finished building, the company has a short delivery record.
What to check before buying at Aura Prestige
- The completion date in the SPA and the grace period, since the registered date of 1 November 2026 will pass with the building about 40% complete.
- Whether the developer has applied to the DLD for a new completion date, which would show in the project status record.
- When the 40% handover payment and any mortgage drawdown fall due, if completion moves to 2027 or 2028.
- Registered prices for the same size, since most sales are 2 bedrooms near AED 1,281 per sq ft.
Aura Prestige location: Dubai Silicon Oasis, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Aura Prestige handover date?
The DLD register gives 1 November 2026, and Property Finder lists delivery in November 2026. The building was 40.06% complete on 1 October 2026, so it will not be finished by that date. Some agents give Q1 2027. No revised date has been published.
What is the Aura Prestige completion date?
1 November 2026 in the DLD register. The latest DLD inspection, on 1 October 2026, recorded 40.06% complete, up from 20.65% on 30 April 2026.
What is the Aura Prestige price?
Agent listings gave 2 bedroom prices from about AED 1.47 million to AED 1.51 million and 3 bedrooms from about AED 1.99 million. Registered sales in the 12 months to August 2026 had medians of AED 1.53 million for 2 bedrooms and AED 2.00 million for 3 bedrooms (Dubai Data).
What is the Aura Prestige payment plan?
20% down payment, 40% during construction and 40% on handover, a 60/40 plan (Grand Reve Realty; JRE; Proprain).