Butterfly Towers
Butterfly Towers in Arjan by Al Sayyah Group: DLD completion date of 31 January 2029, 7.65% built in May 2026, studios from about AED 858,000 and a 5 year post-handover plan.
Short answer
Butterfly Towers, Al Sayyah Group's twin towers in Arjan, has a registered completion date of 31 January 2029 at the Dubai Land Department (DLD), and the developer markets Q1 2029. The DLD inspection of 21 May 2026 recorded construction at 7.65%. Studios were offered from AED 857,777 in September 2026, and the main plan leaves 40% of the price for five years after handover.
- Status
- under construction
- Handover date
- 31 Jan 2029 (DLD registered completion date); developer gives Q1 2029
- Construction
- 7.65% complete (DLD inspection, 21 May 2026)
- Payment plan
- 20% down, 30% during construction, 10% on handover, 40% over 5 years after handover; or 50/50
- Starting price
- Studios from AED 857,777 (Impala Real Estate, 23 Sep 2026)
Registered completion date (DLD)
31 Jan 2029
DLD project 3060, via Mitchell's
Construction progress (DLD)
7.65%
DLD inspection, 21 May 2026
Homes on the DLD register
596
Two buildings; Propsearch estimates 570 units
Median registered price
AED 1,649 per sq ft
168 DLD sales, 17 Nov 2025 to 7 Sep 2026, via Mitchell's
When will Butterfly Towers be handed over?
Butterfly Towers has a registered completion date of 31 January 2029 at the Dubai Land Department (DLD). On the register it is project 3060, recorded simply as “butterfly”, in Al Barsha South 3 within Arjan. Al Sayyah Group and the brokers selling it market Q1 2029, and Propsearch estimates January 2029.
Construction is at an early stage. The DLD inspection of 21 May 2026 recorded 7.65% progress, after an inspection on 2 July 2024 recorded 0% (Continental Club).
Building-by-building dates and how the date has changed: Butterfly Towers handover date.
Butterfly Towers construction update
The DLD record shows the project registered on 29 August 2024 and construction starting on 1 January 2025 (Dubricks; Mitchell’s). The register describes two buildings of basement, ground, two podium levels and 17 floors. Propsearch lists Eastern International as main contractor, Edrafor Piling and Special Foundation for the foundations, and Alajmi Engineering Consultants as architect. The DLD inspection of 21 May 2026 put the project at 7.65%, and no later DLD figure had been published by 11 October 2026. The escrow account is held at Emirates NBD.
Butterfly Towers homes and sizes
The two towers, Butterfly A and Butterfly B, hold 596 homes on the DLD register; Propsearch estimates 570 units. Apartments are sold fully furnished, and Tower B includes retail units. Amenities listed by Propsearch include a pool, a children’s pool, a health club, a library and a yoga deck.
| Home type | Size |
|---|---|
| Studio | 409 to 501 sq ft |
| 1 bedroom | 831 to 1,099 sq ft |
| 2 bedroom | 1,350 to 1,724 sq ft |
Sizes are from Continental Club’s layout data, accessed 11 October 2026. Impala Real Estate lists layouts up to 3,759 sq ft among the units on offer.
Butterfly Towers prices and resale
Impala Real Estate listed 41 homes on offer on 23 September 2026, from AED 857,777 for a 431 sq ft studio to AED 13.85 million. One bedroom layouts of about 843 to 959 sq ft were priced from AED 1.35 million to about AED 1.48 million.
Mitchell’s counts 168 DLD sales between 17 November 2025 and 7 September 2026, with a median of AED 1,649 per sq ft and AED 1.32 million. That is about 1.3% above the Al Barsha South 3 off-plan median of AED 1,628 per sq ft. Continental Club gives medians of about AED 837,000 for studios, AED 1.41 million for 1 bedroom and AED 2.15 million for 2 bedroom homes. Recent sales include a 1 bedroom of 881 sq ft at AED 1,417,777 on 7 September 2026 and a 2 bedroom of 1,350 sq ft at AED 2,091,625 on 3 August 2026 (Propsearch). Almost all sales so far are first sales from the developer.
Butterfly Towers payment plan
Takween Aldar lists two plans. The 5 year post-handover plan is 20% on booking, 30% during construction at 5% every three months, 10% on handover and 40% over 60 months after handover at 4% every six months. The 50/50 plan, listed for retail units, is 20% on booking, 30% during construction and 50% on handover. On a AED 857,777 studio under the post-handover plan, about AED 171,555 is due at booking and AED 85,778 on handover.
Butterfly Towers developer and delivery record
Al Sayyah Group develops Butterfly Towers through Al Sayyah and Sons Investment and its subsidiary Desert Falcon Real Estate Development, which is the entity on the DLD register (Propsearch). The group launched the project in November 2024. Its value was filed with DLD at AED 186.2 million.
What to check before buying at Butterfly Towers
- The SPA completion date and grace period, given 7.65% progress about 32 months before the registered date.
- Which plan applies. The post-handover plan runs to about 2034, with 4% due every six months after keys.
- The tower and use. Units in Butterfly A and B, and residential versus retail units, sell on different terms.
- Service charges for a furnished building, which start at handover.
Butterfly Towers location: Arjan, Dubailand, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Butterfly Towers handover date?
The DLD register holds a completion date of 31 January 2029, and Al Sayyah Group and brokers market Q1 2029. Construction was 7.65% complete at the DLD inspection of 21 May 2026 (Mitchell's; Continental Club).
What is the Butterfly Towers completion date?
31 January 2029 is the registered completion date, against a registered construction start of 1 January 2025 (DLD project 3060). Propsearch also estimates January 2029.
What is the Butterfly Towers price?
Impala Real Estate listed studios from AED 857,777 and homes up to AED 13.85 million on 23 September 2026. DLD medians are about AED 837,000 for studios, AED 1.41 million for 1 bedroom and AED 2.15 million for 2 bedroom homes (Continental Club).
What is the Butterfly Towers payment plan?
The 5 year post-handover plan is 20% on booking, 30% during construction at 5% every three months, 10% on handover and 40% over 60 months after handover at 4% every six months. A 50/50 plan pays 20% on booking, 30% during construction and 50% on handover (Takween Aldar).
Who is the developer of Butterfly Towers?
Al Sayyah Group, through its subsidiary Desert Falcon Real Estate Development, the name on the DLD register (Propsearch).