SAAS Hills
Two tower SAAS Properties project in Dubai Science Park with 859 units. DLD registered completion date 31 March 2027, developer date Q4 2027; 12.98% built at the 19 May 2026 inspection.
Short answer
SAAS Hills has a registered completion date of 31 March 2027 in the Dubai Land Department (DLD) register, while the developer's date, recorded by Continental Club and broker listings, is Q4 2027. The DLD inspection on 19 May 2026 recorded the two towers 12.98% complete, so the March 2027 registered date is unlikely to hold. The 859 unit project launched on 15 September 2024, and DLD sales have a median of about AED 1,752 per sq ft, with studios from about AED 850,000.
- Status
- under construction
- Handover date
- Q4 2027 (developer, via Continental Club); DLD registered completion date 31 Mar 2027
- Construction
- 12.98% complete (DLD inspection, 19 May 2026)
- Payment plan
- 40/60: 20% on booking, 20% during construction (5% every 3 months), 60% on handover; 50/50 and 60/40 options also listed
- Starting price
- From about AED 850,000 for a studio (DLD sale, 14 Sep 2026)
Registered completion date
31 Mar 2027
DLD project register via Continental Club, inspection 19 May 2026
Construction progress
12.98%
DLD inspection, 19 May 2026 (6.44% on 10 Nov 2025)
Developer's date
Q4 2027
Continental Club (developer supplied); JRE, accessed 11 Oct 2026
Units
859
DLD register, two buildings
When will SAAS Hills be handed over?
The developer’s date for SAAS Hills is Q4 2027, as recorded by Continental Club from developer data and shown on broker listings such as JRE. The Dubai Land Department (DLD) register still gives a registered completion date of 31 March 2027 for the project, registered as “SAAS Hills”, project number 3225, and Property Finder still shows March 2027.
The DLD inspection on 19 May 2026 recorded the two towers 12.98% complete. With about 87% of the work left ten months before 31 March 2027, the registered date is unlikely to hold, and Q4 2027 is the later date now in circulation.
Building-by-building dates and how the date has changed: SAAS Hills handover date.
SAAS Hills construction update
The DLD register holds four inspections: 0% on 8 August 2024, 3.8% on 20 May 2025, 6.44% on 10 November 2025 and 12.98% on 19 May 2026 (Dubai Data; Property Finder). The last step was a gain of 6.54 points in six months. SAAS Properties announced the end of shoring and piling works on 14 October 2025, and posted a further construction update in April 2026 without a percentage.
The developer is registered as Saas Properties L.L.C, Dubai Branch. The registered construction start was 15 September 2024, and the escrow account is held at Emirates NBD. The register records two buildings on a project area of 100,792 square metres in Al Barsha South Second, the DLD district that covers Dubai Science Park.
SAAS Hills homes and sizes
The project has 859 units in two towers. Tower A has 30 residential floors and Tower B 32, each over a basement, ground floor and two podium levels (offplans.com). Homes range from studios to 5 bedroom apartments, with duplex townhouses and sky villas.
| Home type | Floor plan size | Median size in DLD sales |
|---|---|---|
| Studio | 530 sq ft | About 527 sq ft |
| 1 bedroom | 923 sq ft | About 980 sq ft |
| 2 bedroom | 1,859 sq ft | About 1,862 sq ft |
| 3 bedroom | 2,351 sq ft | About 2,562 sq ft |
| 4 bedroom | 4,039 sq ft | About 3,897 sq ft |
| 5 bedroom | 5,978 sq ft | Too few sales |
Floor plan sizes and DLD medians are from Continental Club (registry updated 3 October 2026).
SAAS Hills prices and resale
DLD records 455 sales at a median AED 18,858 per square metre, about AED 1,752 per sq ft, with almost all bought from the developer (Continental Club). Dubai Data counts 247 sales in the past 12 months at a median AED 1.76 million.
| Home type | Median DLD price | Sales |
|---|---|---|
| Studio | AED 984,368 | 190 |
| 1 bedroom | AED 1,726,952 | 104 |
| 2 bedroom | AED 2,652,367 | 103 |
| 3 bedroom | AED 3,487,435 | 48 |
| 4 bedroom | AED 8,613,000 | 9 |
Recent sales include a 486 sq ft studio at AED 850,860 on 14 September 2026 and a 923 sq ft 1 bedroom at AED 1,633,951 on 24 August 2026. Studios were advertised from AED 951,400 in March 2025 (Offplan Dubai). Property Finder marks the project sold out, but broker feeds still list units from AED 1.02 million to AED 10.78 million, so sources differ on availability.
SAAS Hills payment plan
The main plan is 40/60: 20% on booking, 20% during construction at 5% every three months, and 60% on handover (Continental Club; JRE). Two other options are listed, 20/30/50 and 20/40/40, which move more of the price into the construction period (Projects Scout). Offplans.com lists DLD fee waivers on some plans, of 4% on studios, 1 bedrooms and townhouses and 2% on 2 bedrooms.
On the median 1 bedroom price of AED 1,726,952, the 40/60 plan leaves about AED 1.04 million due on handover.
What to check before buying at SAAS Hills
- Which date the SPA states: 31 March 2027, as registered, or Q4 2027, the developer’s later date.
- Which tower the unit is in, since the two towers differ in height, though the DLD reports a single progress figure for both.
- The share due on handover, which ranges from 40% to 60% depending on the plan.
- Whether a DLD fee waiver applied to the original purchase, which affects the price comparison on a resale.
SAAS Hills location: Dubai Science Park, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
When is the SAAS Hills handover date?
The developer's date is Q4 2027 (Continental Club, developer supplied; JRE). The DLD register gives a registered completion date of 31 March 2027, and Property Finder still shows March 2027. The DLD inspection on 19 May 2026 recorded 12.98% complete.
What is the SAAS Hills completion date?
The DLD registered completion date is 31 March 2027 (DLD project register via Mitchell's and Continental Club, as at 4 Oct 2026). The developer and most broker listings give Q4 2027.
What is the SAAS Hills price?
DLD records 455 sales at a median AED 1,752 per sq ft. Median prices are about AED 984,000 for a studio, AED 1.73 million for a 1 bedroom, AED 2.65 million for a 2 bedroom and AED 3.49 million for a 3 bedroom (Continental Club, registry updated 3 Oct 2026). Broker listings run up to AED 10.78 million for the largest homes.
What is the SAAS Hills payment plan?
The main plan is 40/60: 20% on booking, 20% during construction at 5% every three months, and 60% on handover. Plans with 30% or 40% during construction, leaving 50% or 40% on handover, are also listed.
How many towers and units does SAAS Hills have?
Two towers with 859 units on the DLD register. Tower A has 30 residential floors and Tower B 32, each above a basement, ground floor and two podium levels (offplans.com).