Casa Aura Residence
AGN Skyline's five-storey, 58-unit building in Dubai South. Registered completion date 12 September 2027, 6.32% built at the DLD inspection of 4 May 2026, studios sold from AED 600,000 and a 60/40 plan.
Short answer
Casa Aura Residence, a five-storey building with 58 apartments by AGN Skyline Developers in the Dubai South Residential District, has a registered completion date of 12 September 2027, matching the developer's Q3 2027. The Dubai Land Department (DLD) inspection of 4 May 2026 recorded it 6.32% complete. Studios were sold from AED 600,000 in 2025 on a 60/40 plan, and the building is listed as sold out.
- Status
- under construction
- Handover date
- DLD registered completion 12 Sep 2027; developer Q3 2027
- Construction
- 6.32% complete (DLD inspection, 4 May 2026)
- Payment plan
- 60/40: 20% booking, 40% in 22 monthly instalments, 40% on handover
- Starting price
- Studios registered from AED 600,000 (Sep 2025); Property Finder now lists from AED 1 million
Registered completion date
12 Sep 2027
DLD project register via Continental Club and Mitchells
Construction progress
6.32%
DLD inspection, 4 May 2026
Homes
58
One G+4 building, DLD register
Median registered price
About AED 1,375 per sq ft
7 DLD sales since Apr 2025, Mitchells; small sample
When will Casa Aura Residence be handed over?
The Dubai Land Department (DLD) register gives Casa Aura Residence a completion date of 12 September 2027. The developer’s date is Q3 2027, and Property Finder and JRE list September 2027.
The DLD inspection of 4 May 2026 recorded 6.32%, the only reading above zero so far. Finishing by 12 September 2027 would need the remaining 93.68 points in about 16 months, close to 6 points a month. A five-storey building can be built faster than a tower, but the register showed only 6.32 points in the first year after the registered construction start of 12 May 2025.
Building-by-building dates and how the date has changed: Casa Aura Residence handover date.
Casa Aura Residence construction update
AGN Skyline held a groundbreaking ceremony and presented it as the start of on-site construction. Gulf News reported the official launch and groundbreaking together on 10 February 2026, describing the approach as starting construction before the launch. The register’s two readings are 0% on 24 January 2025 and 6.32% on 4 May 2026 (Continental Club, registry updated 7 October 2026). The project number is 3522 and the escrow bank is United Bank Limited. No DLD reading after May 2026 had been published by early October 2026.
Casa Aura Residence homes and sizes
Casa Aura is one ground plus four building on a plot of 2,586.97 square metres, registered as “Casa Aura Residence” with 58 units in Madinat Al Mataar, the DLD district for the Dubai South Residential District.
| Home type | Size (DLD) | Recent registered prices |
|---|---|---|
| Studio | 368 to 426 sq ft | AED 600,000 to AED 650,000 (Sep to Oct 2025) |
| 1 bedroom | 626 to 948 sq ft | AED 851,318 to AED 1,049,469 (Oct 2025 to Mar 2026) |
| 2 bedroom | 1,055 to 1,219 sq ft | AED 1,335,667 to AED 1,361,282 (Mar to Jul 2026) |
| 3 bedroom | 1,463 to 1,525 sq ft | No registered sale published |
Sizes are from the DLD register via Continental Club, and prices from DLD transactions listed by Continental Club and Mitchells. Amenities listed by the developer include a pool, gym, padel and basketball courts, a jogging track and an open-air cinema (Gulf News).
Casa Aura Residence prices and resale
Mitchells shows 11 apartment sales from 26 September 2025 to 1 July 2026, with a median of about AED 1,375 per sq ft across the 7 sales in its detailed window, a small sample. Recent sales include a 2 bedroom of 1,066 sq ft for AED 1,361,282 on 1 July 2026 and a 1 bedroom of 728 sq ft for AED 941,310 on 18 March 2026. The off-plan median for Madinat Al Mataar over the 12 months to 5 October 2026 was about AED 1,692 per sq ft, though that figure mixes unit types and includes commercial sales (Mitchells). The register also holds a 23 November 2023 transaction of 27,846 sq ft for AED 5,012,300, which matches the plot size rather than a home. JRE lists the building as sold out, and Property Finder shows a starting price of AED 1 million.
Casa Aura Residence payment plan
Continental Club lists 20% on booking, 40% during construction in 22 instalments and 40% on handover. Tanami Properties describes the same 60/40 plan as 1% a month. AGN Skyline says the instalments run over 22 months after booking and are aligned with construction milestones, with the final 40% due on completion. For a buyer who booked in late 2025, the construction instalments end before the registered completion date, leaving 40% tied to handover.
Casa Aura Residence developer and delivery record
AGN Skyline Developers, registered as A G N Skyline Real Estate Developments, presents Casa Aura on its website as its arrival in Dubai (“A Legacy of Excellence Arrives in Dubai”), and Gulf News describes it as a family-led developer. Its Dubai office is in Motor City. Its website features only Casa Aura, so there is no completed Dubai project to judge its delivery by.
What to check before buying at Casa Aura Residence
- The next DLD inspection. The last published reading is from May 2026, and the building needs about 6 points a month to meet 12 September 2027.
- That the seller is the registered owner, since the building is listed as sold out and any purchase is likely a resale or assignment of an off-plan contract.
- How much of the 60% has been paid on a resale unit, because the 40% handover payment passes to the buyer.
Casa Aura Residence location: Dubai South Residential District, Dubai South, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Casa Aura Residence handover date?
The DLD register gives a completion date of 12 September 2027, and the developer gives Q3 2027. At the DLD inspection of 4 May 2026 the building was 6.32% complete (DLD register via Continental Club and Mitchells).
What is the Casa Aura Residence completion date?
12 September 2027 on the DLD register (project 3522). Property Finder shows the same date. Construction was registered as starting on 12 May 2025.
What is the Casa Aura Residence price?
DLD records show studios sold for AED 600,000 to AED 650,000 in September and October 2025, 1 bedrooms for AED 851,318 to AED 1,049,469, and 2 bedrooms for about AED 1.34 million to AED 1.36 million in 2026. Property Finder now lists a starting price of AED 1 million, and JRE lists the building as sold out.
What is the Casa Aura Residence payment plan?
20% on booking, 40% during construction in 22 instalments, and 40% on handover (Continental Club; Tanami Properties describes it as 60/40 at 1% a month). AGN Skyline says the instalments run over 22 months after booking.