
Muraba Veil
Muraba Veil, the 380 metre RCR Arquitectes tower in Al Wasl: DLD registered completion date of 31 December 2028, 7.6% built in September 2026, 2 bedroom homes from about AED 11.8 million and a 50/50 plan.
Short answer
Muraba Veil, a 73 storey, 380 metre tower by Muraba Properties beside the Dubai Water Canal in Al Wasl, has a DLD registered completion date of 31 December 2028, matching the developer's Q4 2028 target. The latest DLD inspection, on 28 September 2026, recorded 7.6% construction progress. 2 bedroom homes have sold from about AED 11.8 million, and half the price is due on completion.
- Status
- under construction
- Handover date
- DLD registered completion date 31 Dec 2028; developer Q4 2028
- Construction
- 7.6% complete (DLD inspection, 28 Sep 2026)
- Payment plan
- 50/50: 50% in instalments to September 2027, 50% on completion
- Starting price
- From about AED 11.8 million (2 bedroom, DLD sales 2025)
Registered completion date
31 Dec 2028
DLD register via Continental Club
Construction progress
7.6%
DLD inspection, 28 Sep 2026
Median 2 bedroom sale
AED13,658,036
DLD sales, 14 deals, via Continental Club, Oct 2026
Units
135
DLD register; Muraba markets 131 residences
When will Muraba Veil be handed over?
The Dubai Land Department (DLD) register holds a completion date of 31 December 2028 for Muraba Veil, and Muraba gives the same target, Q4 2028. Gulf News also reported a December 2028 completion.
Progress has been slow so far. Construction was registered as starting on 1 December 2024, and the tower was 7.6% complete at the DLD inspection of 28 September 2026, with 27 months left to the registered date. Continental Club’s pace estimate, based on the past year of inspections, is about 0.58% a month.
Building-by-building dates and how the date has changed: Muraba Veil handover date.
Muraba Veil construction update
DLD inspections recorded 5.45% on 16 March 2026, 7.16% on 18 June 2026, 7.5% on 17 September 2026 and 7.6% on 28 September 2026. The project is DLD project 3106, with its escrow account at Commercial Bank of Dubai.
The tower is registered as five basements, ground, one podium and 72 floors. It is 380 metres tall and 22.5 metres wide, the width of one apartment, and wrapped in a stainless steel mesh “veil” that gives it its name (Dezeen, 17 October 2024). WSP is the engineering consultant (The Foundry).
Muraba Veil homes and sizes
Muraba markets 131 residences from 2 to 5 bedrooms, each spanning the full width of the tower (Construction Week, 22 October 2024). The DLD register lists 135 units, including a few non-residential units.
| Home type | Units (DLD) | Typical size |
|---|---|---|
| 2 bedroom | 54 | about 3,839 sq ft |
| 3 bedroom | 48 | 4,951 to 8,172 sq ft |
| 4 bedroom | 28 | 9,919 to 15,356 sq ft |
| 5 bedroom | 1 | about 26,667 sq ft |
Counts and sizes are from the DLD register via Continental Club. Ceiling heights start at 3.2 metres and reach 7.65 metres in some units (The Foundry).
Muraba Veil prices and resale
Broker pages list prices from about AED 11.7 million. The lowest DLD sales match that: two 2 bedroom units at AED 11,764,843, on 22 April and 23 May 2025. Continental Club also records a starting price of AED 18 million in Q4 2024, so sources differ on the launch figure.
The DLD has recorded 41 sales since 2023, including earlier land transfers. Median prices are AED 13,658,036 for a 2 bedroom of about 3,840 sq ft and AED 22,913,251 for a 3 bedroom of about 4,940 sq ft. The building median is about AED 3,897 per sq ft, up 8% over the past year. Recent sales include a 3 bedroom at AED 36.6 million on 10 September 2026 and a 4 bedroom at about AED 42.95 million on 6 May 2026.
The anticipated service charge is AED 38 per sq ft a year (The Foundry).
Muraba Veil payment plan
The plan is 50/50. The Foundry lists:
- 5% on booking, plus an AED 5,000 admin fee.
- 15% plus the 4% DLD fee, 30 days after booking.
- 10% each in September 2025, September 2026 and September 2027.
- 50% on completion, set for December 2028.
Christie’s lists a similar split of 10%, 15%, 15%, 10% and 50%. One Continental Club summary describes a 75/25 plan, which does not match the other published schedules.
Muraba Veil developer and delivery record
Muraba Properties, founded in 2013 and led by managing director Ibrahim Al Ghurair, has worked with Pritzker Prize winners RCR Arquitectes for a decade. Muraba Veil is the fifth project of that partnership (Construction Week). Its earlier Dubai building, Muraba Residences on the Palm Jumeirah East Crescent, has 46 units (Continental Club). In 2024 Muraba said it takes its time on each project rather than set dates early (Time Out Dubai, 23 October 2024).
What to check before buying at Muraba Veil
- Progress against the registered date. At 7.6% in September 2026, the remaining 92% would need to be built in 27 months to meet 31 December 2028.
- The completion date and grace period in the SPA, since 50% of the price is due on completion.
- The unit count and size basis. The register shows 135 units and marketing shows 131, and duplex and penthouse sizes vary widely.
- Service charges. AED 38 per sq ft on a 3,839 sq ft 2 bedroom is about AED 145,900 a year.
Muraba Veil location: Al Wasl, Sheikh Zayed Road, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Muraba Veil handover date?
The DLD register holds a completion date of 31 December 2028, and Muraba targets Q4 2028. The tower was 7.6% complete at the DLD inspection of 28 September 2026.
What is the Muraba Veil completion date?
31 December 2028, per the DLD register (project 3106), with construction registered as starting on 1 December 2024.
What is the Muraba Veil price?
The lowest DLD sales were 2 bedroom units at AED 11,764,843 in April and May 2025. Median DLD prices are AED 13,658,036 for a 2 bedroom and AED 22,913,251 for a 3 bedroom. The largest unit sale recorded was a 4 bedroom at about AED 42.95 million in May 2026 (Continental Club).
What is the Muraba Veil payment plan?
A 50/50 plan. The Foundry lists 5% on booking, 15% plus the 4% DLD fee 30 days later, 10% each in September 2025, 2026 and 2027, and 50% on completion in December 2028. Christie's lists a similar 10/15/15/10/50 split.
