REEF
REEF buildings by REEF Luxury Developments: REEF 1000 due 30 December 2026 and 67.22% built, plus completion dates, prices and payment plans for REEF 999, 998, 996 and 995.
Short answer
REEF Luxury Developments, founded in 2024, has five numbered buildings in the DLD register. The first, REEF 1000 in Dubailand Residence Complex (DLRC), has a registered completion date of 30 December 2026 and was 67.22% complete at a DLD inspection on 5 October 2026. REEF 999 in Al Furjan is due 30 June 2027 and was 13.21% built in August 2026. REEF 998, REEF 996 and REEF 995 are registered for June to November 2028 and are at or near 0% to 2%.
- Status
- under construction
- Handover date
- REEF 1000 registered for 30 December 2026; REEF 999 30 June 2027; REEF 998 30 June 2028; REEF 996 30 September 2028; REEF 995 30 November 2028
- Construction
- REEF 1000 67.22% complete (DLD inspection, 5 Oct 2026); REEF 999 13.21% (27 Aug 2026); later buildings 0% to 2.07%
- Payment plan
- REEF 1000 and REEF 999: 60/40 (20% down, 40% during construction, 40% on handover); REEF 998: 70/30 with 30% on handover or over a post-handover plan
- Starting price
- REEF 1000 studio median AED 620,620 (DLD sales); REEF 998 from AED 759,441 at launch (Jul 2025)
REEF 1000 registered completion
30 Dec 2026
DLD project register via Continental Club
REEF 1000 progress
67.22%
DLD inspection, 5 Oct 2026
REEF buildings in the DLD register
5 (1,465 units)
REEF 1000, 999, 998, 996 and 995
REEF 1000 median studio price
AED620,620
43 DLD sales, via Continental Club, Oct 2026
When will the REEF buildings be handed over?
REEF Luxury Developments has five numbered buildings in the DLD project register, each with its own date. The first, REEF 1000 in Dubailand Residence Complex (DLRC), has a registered completion date of 30 December 2026, and the developer gives Q4 2026. A DLD inspection on 5 October 2026 recorded it 67.22% complete, up from 50% on 14 July 2026 (Continental Club, 10 October 2026).
That is a gain of 17.22 points in about 12 weeks. At that pace, the remaining 33 points would take a little over five months, which points to about March 2027, a few months after the registered date. The other buildings are at an earlier stage: REEF 999 in Al Furjan is due 30 June 2027 and was 13.21% built in August 2026, while REEF 998, REEF 996 and REEF 995 are registered for June to November 2028.
Building-by-building dates and how the date has changed: REEF handover date.
REEF construction update
| Building | Area | Units (DLD) | Progress (DLD, date) | Registered completion |
|---|---|---|---|---|
| REEF 1000 | DLRC | 126 | 67.22%, 5 Oct 2026 | 30 Dec 2026 |
| REEF 999 | Al Furjan | 148 | 13.21%, 27 Aug 2026 | 30 Jun 2027 |
| REEF 998 | DLRC | 339 | 2.07%, 27 Aug 2026 | 30 Jun 2028 |
| REEF 996 | Dubai Production City | 505 | 0.1%, 1 Sep 2026 | 30 Sep 2028 |
| REEF 995 | DLRC | 347 | 0%, 22 Dec 2025 | 30 Nov 2028 |
Source: DLD project register via Continental Club and Dubai Data. REEF 1000 started construction on 1 November 2024 and moved from 23.06% in February 2026 to 30.76% in April, 50% in July and 67.22% in October. REEF 999, two buildings of a ground floor, podium, 12 floors and a roof, started on 1 April 2025. REEF 995 was registered with DLD on 15 September 2026 and has no published market name or sales page yet. A sixth building, REEF 997 on Dubai Islands with 63 homes due Q1 2028, appears on the developer’s site but is not among these register records.
REEF homes and sizes
REEF 1000 has 125 homes according to the developer and 126 units in the DLD register, in a building of a ground floor, podium, six floors and a roof.
| Home type | REEF 1000 | REEF 998 |
|---|---|---|
| Studio | 437 to 488 sq ft | 412 to 478 sq ft |
| 1 bedroom | 752 to 1,066 sq ft | 623 to 798 sq ft |
| 2 bedroom | 1,152 to 1,370 sq ft | 1,002 to 1,011 sq ft |
| 2 bedroom duplex | 1,653 to 1,905 sq ft | Not offered |
| 3 bedroom | Not offered | 1,397 sq ft |
REEF 1000 sizes are from the developer’s site; REEF 998 sizes are from its 2025 fact sheet. REEF 998 has 323 homes according to the developer and 339 units in the DLD register. REEF 996 offers studios to 3 bedroom apartments across 505 units. Every REEF building carries the developer’s patented outdoor-cooled sunken balcony.
REEF prices and resale
REEF 1000. DLD registered sales give medians of AED 620,620 for studios of about 431 sq ft (43 sales), AED 1,249,580 for 1 bedrooms of about 829 sq ft (35 sales) and AED 1,783,347 for 2 bedrooms of about 1,249 sq ft (23 sales) (Continental Club, to 6 October 2026). Recent sales include a 1 bedroom at AED 1,404,749 on 29 September 2026 and a 2 bedroom at AED 2,116,275 on 12 August 2026. Continental Club counts about 1% of sales as resales and records a 1% rise in the price per square metre over the past year.
REEF 998. Launched in early July 2025 as an AED 450 million project, with prices from AED 759,441 for a studio, AED 1,049,572 for a 1 bedroom, AED 1,564,693 for a 2 bedroom and AED 2,048,804 for a 3 bedroom (fact sheet; Construction Week, 2 July 2025). The project’s sales site now quotes from AED 696,000. DLD sales in the 12 months to August 2026 had a median of AED 1.05 million, or AED 1,558 per sq ft (Dubai Data).
REEF 999. Continental Club lists prices from AED 1.2 million.
REEF payment plan
- REEF 1000 and REEF 999: 60/40, with 20% down payment, 40% during construction and 40% on handover (Continental Club).
- REEF 998, 3 year plan: 20% on booking, 50% during construction at 1% a month, 30% on handover.
- REEF 998, 5.5 year plan: 20% on booking, 50% during construction, 30% after handover.
The REEF 998 sales site says REEF 999 and REEF 1000 have sold out.
REEF developer and delivery record
REEF Luxury Developments was established in 2024 and lists five projects launched. None of its buildings has been handed over yet, so REEF 1000 will be its first delivery. Its progress so far has been steady, with gains of 7.7 to 19.2 points between each of its 2026 inspections.
What to check before buying at REEF
- Which building the unit is in. Dates run from December 2026 to November 2028, and the buildings are in three different areas.
- The completion date and grace period in the SPA for that building.
- The plan on REEF 998, since the 3 year and 5.5 year plans place the last 30% on different dates.
- The price paid for REEF 1000 resales against the AED 620,620 studio median and AED 1,249,580 1 bedroom median from developer sales.
REEF location: Dubailand Residence Complex (DLRC), plus Al Furjan and Dubai Production City, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the REEF 1000 handover date?
The DLD project register gives REEF 1000 a completion date of 30 December 2026, and REEF Luxury Developments gives Q4 2026. The building was 67.22% complete at the DLD inspection on 5 October 2026 (Continental Club, 10 Oct 2026).
What is the REEF 999 completion date?
REEF 999, in Al Furjan, has a registered completion date of 30 June 2027 and a developer date of Q2 2027. It was 13.21% complete at the DLD inspection on 27 August 2026.
When will REEF 998 be handed over?
REEF 998, in DLRC, is due on 30 June 2028 according to the DLD register, matching the Q2 2028 date given at launch in July 2025. It was 2.07% complete on 27 August 2026.
What is the REEF 998 price and payment plan?
At launch in July 2025, prices started from AED 759,441 for a studio. The plan was 20% on booking and 50% during construction, then 30% either on handover or after it on the 5.5 year plan. Registered sales have a median of about AED 1.05 million.
Who is the developer of the REEF buildings?
REEF Luxury Developments, founded in 2024. Its buildings feature a patented outdoor-cooled sunken balcony. None of its buildings has been handed over yet; REEF 1000 is the most advanced.