Views VII by Golden Woods
Golden Woods' 68-unit low-rise building in Dubai South. Registered completion 30 July 2026 has passed; 90.35% built in May 2026. Prices, sizes and post-handover plans.
Short answer
Views VII by Golden Woods, a 68-unit building in Dubai South's residential district, has a registered completion date of 30 July 2026, which has passed. The last Dubai Land Department (DLD) inspection, on 8 May 2026, recorded it 90.35% complete. Golden Woods' own site gives Q2 2026 and portals give Q3 2026. 1 bedrooms are listed from AED 1,131,870, and a 3 bedroom sold for AED 2,165,898 on 15 September 2026.
- Status
- under construction
- Handover date
- DLD registered completion 30 Jul 2026 (passed); developer Q2 2026; portals Q3 2026
- Construction
- 90.35% complete (DLD inspection, 8 May 2026)
- Payment plan
- 40% on booking, 10% on handover, 50% over 36 months after handover; or 20/80
- Starting price
- 1 bedroom from AED 1,131,870 (developer list via portals, 2026)
Registered completion date
30 Jul 2026 (passed)
DLD project register via Continental Club
Construction progress
90.35%
DLD inspection, 8 May 2026
Homes
68
DLD register; one G+4+roof building
Median sale price per sq ft
AED1,213
14 DLD sales, 28 Apr 2025 to 5 Oct 2026 (Mitchells)
When will Views VII by Golden Woods be handed over?
The Dubai Land Department (DLD) register gives Views VII by Golden Woods a completion date of 30 July 2026. That date has passed. The last published DLD inspection, on 8 May 2026, recorded the building 90.35% complete, and the register still listed it as under construction on 4 October 2026 (Mitchells). A daily tracker of the register showed the same 90.3% and an active status on 10 October 2026 (Dubai Handover).
Golden Woods’ own project page gives a completion date of Q2 2026. Portals give Q3 2026 (Continental Club, developer supplied; Luxury Located; Dubainary). One portal, Ezre, describes the building as handed over in Q3 2026, but the DLD register does not show it as completed. The DLD register lists the project as “Views Vii By Golden Woods”.
Building-by-building dates and how the date has changed: Views VII by Golden Woods handover date.
Views VII by Golden Woods construction update
Construction started on 31 July 2024 (DLD project number 3233). Between the inspections of 3 December 2025 and 8 May 2026, the building gained 25.9 points, from about 64% to 90.35% (DLD register via Continental Club). That was the fastest stretch of the build. No inspection after 8 May 2026 had been published by 10 October 2026.
The building is registered as ground plus four floors plus roof, with 68 units, in Madinat Al Mataar, the DLD area name for Dubai South’s residential district. The escrow bank is Abu Dhabi Commercial Bank (Mitchells).
Views VII by Golden Woods homes and sizes
Golden Woods’ published unit list, as shown on portals, covers 1, 2 and 3 bedroom apartments. DLD sales also include studios.
| Home type | Size | Listed from |
|---|---|---|
| Studio | About 333 to 406 sq ft | Not on developer list |
| 1 bedroom | 781 to 791 sq ft | AED 1,131,870 |
| 2 bedroom | 964 to 1,084 sq ft | AED 1,301,279 |
| 3 bedroom | 1,768 sq ft | AED 2,210,100 |
Sizes and prices for 1 to 3 bedrooms are from Ezre and Luxury Located (developer data checked 4 September 2026). Studio sizes are from DLD sales listed by Mitchells. Shared facilities listed by Golden Woods include an adult pool, a kids’ pool, a jacuzzi, a sauna, an outdoor cinema and a gym.
Views VII by Golden Woods prices and resale
Mitchells counts 45 DLD sales between 19 December 2024 and 15 September 2026, all bought from the developer. Across 14 sales since 28 April 2025, the median was AED 1,213 per sq ft, below the Madinat Al Mataar off-plan median of AED 1,692 per sq ft for the 12 months to 5 October 2026. Recent DLD sales were:
- a 3 bedroom of 1,768 sq ft for AED 2,165,898 on 15 September 2026
- two 2 bedrooms of about 1,021 sq ft for AED 1,224,636 each on 6 May 2026
- a studio of about 406 sq ft for AED 430,000 on 6 April 2026
- a 1 bedroom of 781 sq ft for AED 936,719 on 1 January 2026
The 1 bedroom sale in January 2026 was well below the AED 1,131,870 list price shown on portals later in the year. Dubainary quotes a service charge of AED 14 per sq ft, with RGP Properties as the managing company; that is a published estimate, not a RERA-approved budget.
Views VII by Golden Woods payment plan
Ezre lists two plans published by Golden Woods. The first is 40% on booking, 10% on handover and 50% over 36 months after handover. The second is 20% on booking and 80% on handover. Dubainary lists post-handover plans with 10% on booking, 10% during construction and 80% after handover, spread over either 36 or 60 months. VILA Properties shows yet another split. With the building above 90%, most buyers on these plans have the largest share still to pay at or after handover.
Views VII by Golden Woods developer and delivery record
Golden Woods Development has projects in Jumeirah Village Circle and Dubai South, with four listed in Luxury Located’s catalogue in September 2026. Its JVC tower Golden Wood Views 5 was 89.05% complete in April 2026, with a registered completion date of 14 October 2026, about a year after its first Q4 2025 date. On Views VII, Golden Woods’ own Q2 2026 date and the registered 30 July 2026 date have both passed.
What to check before buying at Views VII by Golden Woods
- The DLD completion status. Portal claims of a Q3 2026 handover are not the same as the register showing the building completed.
- Which payment plan the SPA uses, since the 20/80 plan and the post-handover plans put very different amounts due at handover.
- Recent DLD prices for the same unit type, since DLD sales have run below the list prices quoted on portals.
- The first RERA-approved service charge, which replaces the AED 14 per sq ft estimate once the building is completed.
Views VII by Golden Woods location: Dubai South Residential District, Dubai South, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Views VII by Golden Woods handover date?
The DLD register gives a completion date of 30 July 2026, which has passed with the building at 90.35% at the last inspection on 8 May 2026. Golden Woods' site gives Q2 2026, and portals such as Luxury Located give Q3 2026.
What is the Views VII by Golden Woods completion date?
The registered completion date is 30 July 2026 (DLD project register). The register still listed the project as under construction on 4 October 2026 (Mitchells).
What is the Views VII by Golden Woods price?
Developer lists published on portals start at AED 1,131,870 for a 1 bedroom, AED 1,301,279 for a 2 bedroom and AED 2,210,100 for a 3 bedroom (Ezre, Luxury Located). DLD sales in 2026 include studios at AED 430,000 to AED 471,674 and 2 bedrooms at about AED 1.22 million to AED 1.26 million.
What is the Views VII by Golden Woods payment plan?
Two plans are published: 40% on booking, 10% on handover and 50% over 36 months after handover, or 20% on booking and 80% on handover (Ezre). Dubainary also lists plans with 80% spread over three or five years after handover.