Taraf 3 Residence
An 18 storey apartment building of 151 units in JVC. Registered completion date 31 March 2028; DLD recorded 5.88% built on 5 May 2026. Launch prices from AED 760,400.
Short answer
Taraf 3 Residence has a registered completion date of 31 March 2028 at the Dubai Land Department (DLD), and Property Finder lists a Q1 2028 handover. The DLD inspection on 5 May 2026 recorded the building 5.88% complete, six months after construction started on 1 November 2025. The 151 unit tower in JVC District 10 launched in November 2025 from AED 760,400, on a 40/60 payment plan according to brokers.
- Status
- under construction
- Handover date
- 31 Mar 2028 (DLD registered completion date); Property Finder shows Q1 2028, some brokers Q3 2028
- Construction
- 5.88% complete (DLD inspection, 5 May 2026)
- Payment plan
- 40/60, as listed by brokers; the full schedule is not published
- Starting price
- From AED 760,400 at launch (Nov 2025)
Registered completion date
31 Mar 2028
DLD project register via Continental Club
Construction progress
5.88%
DLD inspection, 5 May 2026
Units
151
DLD register; 149 homes and 2 shops
Launch price
AED760,400
Property Finder, Driven Properties
When will Taraf 3 Residence be handed over?
Taraf 3 Residence has a registered completion date of 31 March 2028 at the Dubai Land Department (DLD), under project number 4192. Property Finder lists a Q1 2028 handover, which matches. Driven Properties and Grand Reve Realty show Q3 2028, so broker dates differ by up to six months.
The building was 5.88% complete at the DLD inspection on 5 May 2026 (DLD project register via Continental Club). The previous inspection, on 9 November 2025, had recorded no progress. Construction started on 1 November 2025.
Building-by-building dates and how the date has changed: Taraf 3 Residence handover date.
Taraf 3 Residence construction update
The DLD register lists Taraf 3 Residence as under construction, with 5.88% recorded on 5 May 2026 and no newer inspection in the extract of 4 October 2026 (Mitchells). The developer’s estimated project value filed with DLD is AED 55 million (Propsearch).
The design consultant, CVTEC, describes the building as a basement, ground floor, four podium parking levels, 13 residential floors and a roof. The ground floor holds two shops and the lobby, and the first podium floor has the gym and pools. Propsearch counts 18 storeys plus a basement in JVC District 10.
Taraf 3 Residence homes and sizes
| Home type | Units | Size |
|---|---|---|
| Studio | 24 | 437 to 457 sq ft |
| 1 bedroom | 86 | 841 to 923 sq ft |
| 2 bedroom | 39 | 1,230 to 1,743 sq ft |
| Shops | 2 | 1,202 to 1,329 sq ft |
Unit counts and sizes are from the DLD-based listing on Continental Club (accessed 11 October 2026). The consultant gives the same mix of 24 studios, 86 one bedrooms and 39 two bedrooms, 149 homes in all (CVTEC).
Taraf 3 Residence prices and resale
Booking opened on 1 November 2025 at prices from AED 760,400 (Property Finder). fäm Properties gives a launch date of 20 November 2025.
DLD has registered 11 sales against the project, including the original land purchase in November 2019. Off-plan sales registered so far include:
- studios of 438 sq ft at AED 779,035, AED 795,000 and AED 809,671 on 9 March 2026, about AED 1,780 to AED 1,850 per sq ft
- a 1 bedroom of 853 sq ft at AED 1,194,564 on 17 June 2026, about AED 1,400 per sq ft
- 2 bedrooms of 1,230 to 1,373 sq ft at AED 1,755,560 to AED 1,965,900 in February 2026, and 1,281 sq ft at AED 1,817,200 in December 2025
- the two shops at AED 2.71 million and AED 2.99 million on 18 June 2026
(Propsearch; Data Habibi). With so few registered sales, no resale trend can be drawn yet.
Taraf 3 Residence payment plan
Brokers list a 40/60 plan: 40% paid before handover and 60% on handover (Driven Properties; Grand Reve Realty). The split between the booking deposit and construction instalments has not been published. On this plan the largest payment, 60% of the price, falls due at completion.
Taraf 3 Residence developer and delivery record
DLD lists the developer as Taraf Properties FZCO, and Property Finder markets the project under Taraf Properties. Continental Club and some brokers label it Taraf Holding, but that name also belongs to the Yas Holding company behind Terra Golf Collection, which is registered under a different entity. The escrow account is held at First Abu Dhabi Bank (Mitchells).
What to check before buying at Taraf 3 Residence
- The completion date in the SPA. DLD holds 31 March 2028, while some brokers quote Q3 2028.
- The 40/60 instalment schedule. Brokers do not publish when the 40% falls due, so the SPA schedule is the one to read.
- The developer entity on the contract and escrow account. The register names Taraf Properties FZCO, with escrow at First Abu Dhabi Bank.
- Progress against time. 5.88% was recorded six months into a 29 month programme.
Taraf 3 Residence location: Jumeirah Village Circle (JVC), District 10, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Taraf 3 Residence handover date?
The registered completion date at DLD is 31 March 2028, and Property Finder shows Q1 2028. Driven Properties lists Q3 2028. The DLD inspection on 5 May 2026 recorded 5.88% complete (DLD project register via Continental Club).
What is the Taraf 3 Residence completion date?
31 March 2028, as filed with DLD under project number 4192. Construction started on 1 November 2025, so the register allows about 29 months.
What is the Taraf 3 Residence price?
Launch prices started at AED 760,400 (Property Finder). DLD registered studios of 438 sq ft at AED 779,035 to AED 809,671 on 9 March 2026, a 1 bedroom of 853 sq ft at AED 1,194,564 on 17 June 2026, and 2 bedrooms of 1,230 to 1,373 sq ft at AED 1.76 million to AED 1.97 million in February 2026 (Propsearch).
What is the Taraf 3 Residence payment plan?
Brokers list a 40/60 plan, meaning 40% before handover and 60% on handover (Driven Properties; Grand Reve Realty). The instalment dates are not published, so the SPA schedule is the reference.