Azizi Rose
Azizi Rose in Downtown Jebel Ali: handover and completion date, DLD construction progress, launch and DLD sale prices, and the 10/40/50 payment plan.
Short answer
Azizi Rose has a registered completion date of 4 July 2028 with the Dubai Land Department (DLD), while portals now show Q4 2028. The last published DLD inspection, on 16 February 2026, recorded 0% complete, and the registered construction start was 4 July 2026. Azizi launched the 14 storey building in January 2026 with studios from AED 607,000 and 1 bedrooms from AED 924,000 on a 10/40/50 plan.
- Status
- off-plan
- Handover date
- DLD registered completion date 4 Jul 2028; portals show Q4 2028
- Construction
- 0% complete (DLD inspection, 16 Feb 2026)
- Payment plan
- 10% on booking, 40% in four instalments during construction, 50% on handover
- Starting price
- From AED 607,000 for a studio at launch (Jan 2026)
DLD registered completion date
4 Jul 2028
DLD project register via Mitchell's, project 4403
Construction progress
0%
DLD inspection, 16 Feb 2026
Launch price, studio
AED607,000
Azizi, Jan 2026
Median DLD price, studio
AED617,760
22 sales, Continental Club, Sep 2026
When will Azizi Rose be handed over?
The DLD project register gives Azizi Rose a registered completion date of 4 July 2028, exactly two years after its registered construction start of 4 July 2026 (Mitchell’s, register as at 4 October 2026). Portals show a later Q4 2028: Data Habibi records the developer’s date moving from Q3 2028 to Q4 2028, and DirectDXB listed Q4 2028 on 23 September 2026. Propsearch still shows Q1 2028, so the published dates do not agree.
The last DLD inspection on the public register, dated 16 February 2026, recorded 0% complete. That inspection came before the registered start date, and no later inspection had been published by 11 October 2026.
Building-by-building dates and how the date has changed: Azizi Rose handover date.
Azizi Rose construction update
Azizi Rose is DLD project 4403, registered to Azizi Developments with 226 units. The register lists its status as under construction, but the only published inspection figure is 0% from 16 February 2026 (Continental Club, register updated 25 September 2026). The project value filed with DLD is AED 67.2 million (Propsearch). Buyer payments go to an escrow account at Ajman Bank, as recorded by DLD (Dubai Diligence). Azizi has not published a construction update for Rose.
Azizi Rose homes and sizes
Azizi Rose is a 14 storey building of studios and 1 bedroom apartments with shops on the ground floor (Propsearch). Building amenities include pools for adults and children, gyms, a private cinema, a gaming lounge and a multipurpose hall. It sits close to Life Pharmacy metro station on the Red Line and to Jebel Ali Free Zone.
| Home type | Size range in DLD sales |
|---|---|
| Studio | 322 to 352 sq ft |
| 1 bedroom | 695 to 875 sq ft |
Sizes are from DLD sales registered between 14 and 29 September 2026, as listed by Data Habibi. Some portals list a larger 1 bedroom of up to about 1,190 sq ft.
Azizi Rose prices and resale
Azizi announced the launch in January 2026, with studios from about AED 607,000 and 1 bedrooms from AED 924,000 (Azizi, 7 January 2026). Later quotes show 1 bedrooms from about AED 1.14 million for a 728 sq ft unit (Ezre), so entry prices have varied by unit.
DLD recorded 36 sales up to 23 September 2026, all bought from the developer. Median prices were AED 617,760 for a studio of about 344 sq ft (22 sales) and AED 1,089,460 for a 1 bedroom of about 710 sq ft (14 sales), an overall median of about AED 1,640 per sq ft (Continental Club). Recent examples include a studio at AED 618,750 on 18 September 2026 and a 729 sq ft 1 bedroom at AED 1,101,920 on 17 September 2026. No resales had been recorded.
Azizi Rose payment plan
Azizi sells Rose on its standard 50/50 structure:
- 10% on booking
- 10% within 30 days of booking
- 10% within 300 days
- 10% within 450 days
- 10% within 600 days
- 50% on handover
This schedule is from OffPlan Insider (8 October 2026) and DirectDXB (23 September 2026). The DLD registration fee of 4% is paid on top at booking. With 50% due on completion, the largest payment follows the actual handover date, not the marketed one.
Azizi Rose developer and delivery record
Azizi says it has delivered more than 45,000 homes, handed over 7 projects in 2026 and targets 10 more by the end of the year (GDN, 15 September 2026). It has several other buildings in Downtown Jebel Ali, including Azizi Wares, Azizi Lina and Azizi Gabriel. Its record against launch dates is mixed; Azizi Venice, for example, missed its Q1 2026 date for the first buildings. More detail is in the Azizi Developments review.
What to check before buying at Azizi Rose
- The completion date in the SPA. The register says 4 July 2028, while portals range from Q1 2028 to Q4 2028.
- The next DLD inspection. The only published figure, 0% in February 2026, predates the registered start.
- The 50% handover payment, and whether a mortgage for it will be possible on a studio of this size and price.
- The escrow account details. DLD records Ajman Bank as the escrow bank for project 4403.
Azizi Rose location: Downtown Jebel Ali, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Azizi Rose handover date?
The DLD register holds a completion date of 4 July 2028. Data Habibi and DirectDXB show Q4 2028, Continental Club shows Q3 2028 as the developer date, and Propsearch shows Q1 2028, so sources differ.
What is the Azizi Rose completion date?
4 July 2028 is the registered completion date for project 4403 on the DLD register (via Mitchell's, as at 4 October 2026). The last published inspection, on 16 February 2026, recorded 0% complete.
What is the Azizi Rose price?
Studios launched from AED 607,000 and 1 bedrooms from AED 924,000 in January 2026. DLD medians were AED 617,760 for a studio and AED 1,089,460 for a 1 bedroom (Continental Club, transactions to 23 September 2026).
What is the Azizi Rose payment plan?
10% on booking, four instalments of 10% at 30, 300, 450 and 600 days from booking, and 50% on handover (OffPlan Insider, 8 October 2026).