
Enara by Omniyat
Omniyat's sold-out office tower in Marasi Bay, Business Bay. DLD completion date 31 December 2027, but Omniyat now says Q3 2028. 7.25% built in June 2026.
Short answer
Enara by Omniyat, a sold-out office tower in Marasi Bay, Business Bay, has a registered completion date of 31 December 2027 on the Dubai Land Department (DLD) register, but Omniyat's own project page now gives Q3 2028. The DLD recorded it 7.25% complete on 12 June 2026, and Omniyat put it at 14% in late August 2026. Its 34 offices start from 8,321 sq ft and have registered at a median of about AED 5,980 per sq ft.
- Status
- under construction
- Handover date
- Q3 2028 (Omniyat); DLD registered completion date 31 Dec 2027
- Construction
- 7.25% complete (DLD inspection, 12 Jun 2026); 14% per Omniyat (30 Aug 2026)
- Payment plan
- 70% before handover, 30% on handover (Continental Club)
- Starting price
- Offices from 8,321 sq ft; DLD sales from about AED 12.7 million
Registered completion date
31 Dec 2027
DLD register via Continental Club, updated 8 Oct 2026
Omniyat's completion date
Q3 2028
Omniyat project page, accessed 11 Oct 2026
Construction progress
7.25%
DLD inspection, 12 Jun 2026
Median price paid
About AED 5,980 per sq ft
AED 64,351 per sq m, Continental Club, Oct 2026
When will Enara by Omniyat be handed over?
Omniyat’s project page now gives a completion date of Q3 2028 for Enara (accessed 11 October 2026). In an update reported on 30 August 2026, Omniyat said the tower was scheduled for completion in 2028 (Al Masdar Al Aqaari). The Dubai Land Department (DLD) register, listed under the name “Enara By Omniyat”, still shows a completion date of 31 December 2027, and Propsearch and Continental Club both show December 2027 or Q4 2027.
The DLD recorded Enara 7.25% complete at its inspection of 12 June 2026, up from 5.63% on 20 January 2026. At about 0.35% a month over the past year (Continental Club), the gap between the register date and the work on site is wide, which fits the developer’s later 2028 date.
Building-by-building dates and how the date has changed: Enara by Omniyat handover date.
Enara by Omniyat construction update
The register records a construction start of 1 October 2024. Piling had been completed on the plot under an earlier, cancelled scheme (Propsearch). On 16 February 2026 Omniyat appointed Dutco as main contractor after enabling works and 100% of piling were complete, and said the structure would rise to level 10 during 2026, with facade works starting later in the year (Zawya). By 30 August 2026, Omniyat put the tower at 14% complete and said the structure was expected to reach level three by the end of 2026 (Al Masdar Al Aqaari), a lower target than the one given in February.
The tower is about 120 metres tall, with six basement levels for 595 parking spaces (Propsearch). KEO International Consultants is the architectural consultant. The escrow account is with Mashreq Bank.
Enara by Omniyat offices and sizes
Enara is an office building, not a residential one. Omniyat lists 34 offices over 21 levels, with 378,603 sq ft of office space, 33,074 sq ft of retail and a private members’ club on levels 1 and 2. The DLD register holds 49 units, which may include retail and club space; Propsearch estimates 36.
| Office type | Size from | Fit-out |
|---|---|---|
| Grand Office | 8,321 sq ft | Shell and core |
| Ultra-Grand Office | 11,829 sq ft | Shell and core |
| Premium bespoke triplex | Not published | Not published |
Sizes are from Omniyat’s project page. Registered units range from about 3,100 to 14,960 sq ft (DLD register via Continental Club).
Enara by Omniyat prices and resale
Omniyat did not publish a price list. The first office sales were registered in November 2024, and Omniyat said in May 2025 that only two of 34 offices remained (Gulf News, 21 May 2025). Registered office sales from March 2025 to June 2026 ranged from about AED 3,290 to AED 7,650 per sq ft (Mitchells). The largest was AED 70.4 million for 13,768 sq ft on 15 January 2026; two smaller units of 2,031 and 2,647 sq ft registered at AED 12.7 million and AED 13.4 million on 19 June 2026.
Continental Club puts the median at AED 64,351 per sq m, about AED 5,980 per sq ft, with 8% of deals resales and prices up 14% over the past year. The 39 registered transactions also include five transfers of the 8,713 sq m plot between 2014 and May 2025.
Enara by Omniyat payment plan
Omniyat has not published a payment plan. Continental Club lists 70% before handover and 30% on handover. With the tower sold out, new buyers can only buy from existing owners, on terms agreed with them and the developer.
Enara by Omniyat developer and delivery record
Omniyat calls Enara its first ultra-luxury commercial tower. Its August 2026 update put AVA on Palm Jumeirah at 98% with delivery in 2026, and Orla by Omniyat at 70% with delivery in early 2027 (Al Masdar Al Aqaari). Omniyat’s larger Business Bay office tower, Lumena by Omniyat, is due in Q4 2029.
What to check before buying at Enara by Omniyat
- Which completion date the SPA carries. The register says 31 December 2027; Omniyat now says Q3 2028.
- The DLD inspection after June 2026, to see whether progress has moved toward Omniyat’s 14% figure.
- The developer’s consent and fees for an assignment, since every office is now resold rather than bought from Omniyat.
- Shell and core fit-out cost, which is not included in the price of Grand and Ultra-Grand offices.
Enara by Omniyat location: Business Bay, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Enara by Omniyat handover date?
Omniyat's project page gives Q3 2028, and Omniyat said in August 2026 that Enara is scheduled for completion in 2028. The DLD register still shows a completion date of 31 December 2027, and Propsearch shows December 2027.
What is the Enara by Omniyat completion date?
31 December 2027 on the DLD register for project 3220 (Continental Club and Mitchells, October 2026). Omniyat's own date is Q3 2028.
What is the Enara by Omniyat price?
Omniyat does not publish a price list. DLD office sales from March 2025 to June 2026 ranged from about AED 3,290 to AED 7,650 per sq ft (Mitchells), with a median of about AED 5,980 per sq ft (Continental Club). The largest single sale was AED 70.4 million for 13,768 sq ft on 15 January 2026.
What is the Enara by Omniyat payment plan?
Continental Club lists 70% before handover and 30% on handover. Omniyat has not published the plan, and the tower is sold out from the developer.
Is Enara by Omniyat sold out?
Yes. Omniyat said in May 2025 that 32 of its 34 offices were sold, and in February 2026 that the tower was fully sold out.

