
Binghatti Skyblade
Binghatti Skyblade is a 65 storey Binghatti tower on Burj Khalifa Boulevard, Downtown Dubai. Prices from AED 1,674,999 (Oct 2026); handover due Q4 2027.
Short answer
Binghatti Skyblade is a 65 storey tower of studio to 3 bedroom apartments by Binghatti Developers on Burj Khalifa Boulevard, Downtown Dubai, priced from AED 1,674,999 on Binghatti's site on 12 October 2026. Binghatti gives Q4 2027 for completion, and the DLD register holds 30 November 2027.
- Status
- under construction
- Handover date
- Q4 2027 (Binghatti); registered completion date 30 Nov 2027
- Construction
- 17.06% complete (DLD inspection, 21 Apr 2026)
- Payment plan
- 20% booking, 50% during construction, 30% on completion (Binghatti); 10/50/40 at launch
- Starting price
- From AED 1,674,999 (Binghatti, Oct 2026)
Price from
AED1,674,999
Binghatti, 12 Oct 2026
Handover
Q4 2027
Binghatti; DLD registered completion 30 Nov 2027
Construction progress
17.06%
DLD inspection, 21 Apr 2026
Median price per sq ft
AED3,909
387 DLD sales since 28 Apr 2025 (Mitchells, Oct 2026)
Binghatti Skyblade overview
Binghatti Skyblade is a single residential tower by Binghatti Developers on Burj Khalifa Boulevard in Downtown Dubai. Binghatti describes 4 basements, ground, 3 podium levels, 55 residential floors, 5 mechanical floors and a roof, 65 storeys in all, on a plot of 55,166 sq ft (Propsearch). Binghatti unveiled it at a launch event in Istanbul in September 2025 as an AED 2 billion project (Construction Week Online, 9 September 2025).
Binghatti lists 619 homes and 2 shops, after announcing 621 residences at launch. The DLD register counts 596 units: 356 studios, 125 one bedroom, 95 two bedroom and 18 three bedroom units, plus 2 other units. Unit names include premium studios, 1 bedroom Royal Suites, 2 bedroom Burj Royal Suites and 3 bedroom Burj Royal Wing units. Some studios have private jacuzzis and some larger units have private pools. The tower is under construction as DLD project 3725.
Binghatti Skyblade prices
| Unit type | Size (sq ft) | Price from (AED) | Source, date |
|---|---|---|---|
| Studio | 378 to 533 | 1.7 million | Property Finder, 12 Oct 2026 |
| 1 bedroom | 761 to 995 | 3.2 million | Property Finder, 12 Oct 2026 |
| 2 bedroom | 1,243 to 1,570 | 4.7 million | Property Finder, 12 Oct 2026 |
| 3 bedroom | 2,145 to 2,491 | 13,394,999 | Binghatti, 11 Oct 2026 (Property Finder: 13 million) |
Sizes are the DLD register’s typical ranges, via Continental Club. Binghatti’s own page gave a single entry price of AED 1,674,999 on 12 October 2026, slightly below Property Finder’s studio figure. Property Finder marked all its listed units as out of stock. Launch prices started at about AED 1.67 million (Propsearch) to AED 1.7 million (Data Habibi).
DLD-registered sales: in the 12 months to 26 September 2026, medians were AED 1.8 million for a studio (346 sales), AED 3.7 million for a 1 bedroom (120), AED 4.9 million for a 2 bedroom (90) and AED 13.4 million for a 3 bedroom (5) (Overit). Mitchells puts the median at AED 3,909 per sq ft across 387 sales since 28 April 2025, 2.4% above the Burj Khalifa district off-plan median. Recent sales include a 533 sq ft studio at AED 2,014,999 on 21 September 2026 and a 1,261 sq ft 2 bedroom at AED 4,959,999 on 2 October 2026 (Propsearch).
Binghatti Skyblade payment plan
Binghatti’s page and Property Finder give the current plan: 20% on signing, 50% during construction and 30% on completion. Propsearch and Data Habibi record the launch plan as 10% on booking, 50% during construction and 40% on handover, and Continental Club also describes a 60/40 plan with 10% down at launch. Buyers from the launch period may be on the 10/50/40 terms. Agent listings give a service charge of AED 20 to AED 22 per sq ft a year (JRE; Dubai Housing, accessed 12 October 2026), about AED 44,000 to AED 48,000 a year for a 2,196 sq ft 3 bedroom; Binghatti has not published a figure.
| Stage | Share | Timing |
|---|---|---|
| Booking | 20% (10% at launch) | On signing, plus the 4% DLD fee |
| Construction | 50% | Instalments during the build |
| Completion | 30% (40% at launch) | On handover |
No post-handover plan has been published. On a 2 bedroom at AED 4,959,999, the completion payment is about AED 1.49 million at 30% and about AED 1.98 million at 40%.
Binghatti Skyblade location
Skyblade stands on Burj Khalifa Boulevard in Downtown Dubai, in the DLD district of Burj Khalifa, with views of Burj Khalifa and the Dubai Water Canal. Binghatti gives direct access to Sheikh Zayed Road, Al Khail Road and Marasi Drive, and lists drive times of 3 minutes to Burj Khalifa, Dubai Mall and Dubai Opera, 10 minutes to DIFC, 12 minutes to the Museum of the Future and 16 minutes to Dubai International Airport (accessed 12 October 2026).
When will Binghatti Skyblade be handed over?
Binghatti’s project page says Binghatti Skyblade will be completed in Q4 2027 (accessed 12 October 2026). The DLD register holds a registered completion date of 30 November 2027. Propsearch and Data Habibi also give Q4 2027, with Data Habibi naming November 2027, while Property Finder shows 28 December 2027.
The tower was 17.06% complete at the last DLD inspection on 21 April 2026. No newer inspection had been published by 4 October 2026 (Mitchells).
To reach 100% by 30 November 2027, the tower needs about 83 more points in roughly 19 months from the April 2026 inspection, close to 4.4 points a month. That is about three times the rate recorded between August 2025 and April 2026, so the next published inspection will show whether the pace has picked up.
Building-by-building dates and how the date has changed: Binghatti Skyblade handover date.
Binghatti Skyblade construction update
The DLD register records construction starting on 1 February 2025. Inspections put progress at 6.02% on 20 August 2025 and 17.06% on 21 April 2026, an increase of 11.04 points in eight months (DLD register via Continental Club). The register describes one building of 4 basements, ground, 3 podium levels, 61 upper floors and a roof. Silver Stone Engineering Consultants is the consultant. The developer’s cost estimate filed with the Land Department is AED 880 million, and buyer payments go to an escrow account at Dubai Islamic Bank.
Binghatti Skyblade developer and delivery record
Binghatti says it has delivered more than 50 developments and has over 40,000 units in its portfolio (Binghatti, 25 March 2026). Several Binghatti towers due in 2026 have passed their dates, but Skyblade’s own date has not changed since launch.
What to check before buying at Binghatti Skyblade
- Which payment plan applies, 20/50/30 or the 10/50/40 launch terms, since the handover payment differs by 10% of the price.
- The completion date and grace period in the SPA, against the registered date of 30 November 2027.
- The latest DLD inspection for project 3725. The 17.06% figure dates from 21 April 2026.
- The unit’s features, such as a private pool or jacuzzi, which explain part of the price spread per sq ft.
Binghatti Skyblade location: Downtown Dubai, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
Where is Binghatti Skyblade?
On Burj Khalifa Boulevard in Downtown Dubai, with access to Sheikh Zayed Road, Al Khail Road and Marasi Drive. Binghatti puts it 3 minutes from Burj Khalifa and Dubai Mall and 10 minutes from DIFC (accessed 12 Oct 2026).
Who is the developer of Binghatti Skyblade?
Binghatti Developers. It launched the tower in Istanbul in September 2025 as an AED 2 billion project, and it is registered with the DLD as project 3725.
What is the starting price of Binghatti Skyblade?
Binghatti listed Skyblade from AED 1,674,999 on 12 October 2026. Property Finder gave studios from AED 1.7 million, 1 bedrooms from AED 3.2 million, 2 bedrooms from AED 4.7 million and 3 bedrooms from AED 13 million on the same date.
What unit types are available at Binghatti Skyblade?
Studios, premium studios, 1 bedroom Royal Suites, 2 bedroom apartments, 2 bedroom Burj Royal Suites and 3 bedroom Burj Royal Wing units, from 378 to 2,491 sq ft on the DLD register. Binghatti lists 619 homes and 2 shops.
What is the Binghatti Skyblade handover date?
Binghatti gives Q4 2027, and the DLD register holds a registered completion date of 30 November 2027. The tower was 17.06% complete at the DLD inspection on 21 April 2026.
What is the Binghatti Skyblade completion date?
30 November 2027 is the registered completion date on the DLD register (project 3725). Binghatti's own page says Q4 2027, and Property Finder shows 28 December 2027.
What is the Binghatti Skyblade price?
Launch prices started at about AED 1.67 million to AED 1.7 million (Propsearch, Data Habibi). In the 12 months to 26 September 2026, DLD sales had a median of AED 1.8 million for a studio, AED 3.7 million for a 1 bedroom and AED 4.9 million for a 2 bedroom (Overit).
What is the Binghatti Skyblade payment plan?
Binghatti's page gives 20% on signing, 50% during construction and 30% on completion. Propsearch and Data Habibi record the launch plan as 10% on booking, 50% during construction and 40% on handover.

