Alta View Skyhomes
Alta View (ALTA V1EW) Skyhomes by Object 1 in JVC: Q4 2028 from the developer, 30 June 2029 completion date on the DLD register, 5.82% built, prices from AED 748,000.
Short answer
Alta View Skyhomes, also sold as ALTA V1EW Skyhomes, is a 46 floor residential tower by Object 1 in District 10 of Jumeirah Village Circle. Object 1 gives a Q4 2028 handover, but the Dubai Land Department (DLD) register lists a completion date of 30 June 2029, about six months later. The DLD recorded the tower 5.82% complete on 16 September 2026. Studios start from AED 748,000 on a 20/50/30 plan.
- Status
- under construction
- Handover date
- Q4 2028 (Object 1); registered completion date 30 Jun 2029 (DLD)
- Construction
- 5.82% complete (DLD inspection, 16 Sep 2026)
- Payment plan
- 20% on booking, 50% in 8 instalments during construction, 30% on handover; post-handover option with 25% over 5 instalments after handover
- Starting price
- From AED 748,000 (Object 1, Oct 2026)
Registered completion date
30 Jun 2029
DLD register via Continental Club and Mitchells, Sep to Oct 2026
Construction progress
5.82%
DLD inspection, 16 Sep 2026
Starting price
AED748,000
Studio, Object 1, Oct 2026
Units
507
DLD register; 499 apartments and 8 retail units
When will Alta View Skyhomes be handed over?
Object 1 markets Alta View Skyhomes with a Q4 2028 handover, the date it gave at launch in June 2025 and still shows on its project page, which mentions completion “in December 2028”. The Dubai Land Department (DLD) register, under project number 3842, lists a completion date of 30 June 2029. Object 1’s own brochure brief, as reproduced by Mitchells, also gives June 2029. So the developer’s marketing date and its registered date are six months apart.
The DLD recorded the tower 5.82% complete at its inspection of 16 September 2026, up 1.76 points since 4 June 2026. With about 94% of the work left and under three years to the registered date, the building needs to move much faster than it has so far.
Building-by-building dates and how the date has changed: Alta View Skyhomes handover date.
Alta View Skyhomes construction update
The DLD register records a construction start of 1 August 2025. Progress was 4.06% at the inspection of 4 June 2026 and 5.82% on 16 September 2026, a rise of 1.76 points in just over three months. The escrow account is with ADIB. Object 1 announced the tower as 54 storeys at launch (Construction Week Online, 25 June 2025). The DLD register and Object 1’s brochure give the configuration as B+G+5P+2MF+46+R: a basement, ground floor, five podium levels, two mechanical floors, 46 residential floors and a roof.
Alta View Skyhomes homes and sizes
The register holds 507 units: 499 apartments and 8 retail units, according to Object 1’s brochure and floor plans as summarised by Mitchells.
| Home type | Units | Size | Starting price (Object 1, Oct 2026) |
|---|---|---|---|
| Studio | 45 | 416 sq ft | AED 748,000 |
| 1 bedroom | 408 | 719 to 1,136 sq ft | AED 1,149,000 |
| 2 bedroom | 46 | 1,164 to 2,122 sq ft | AED 1,630,000 |
Most 1 bedrooms are 720 to 750 sq ft; the larger ones are first floor units with big terraces. Apartments are semi-furnished. Object 1 estimates the service charge at AED 15 per sq ft a year, which would be about AED 6,240 for a studio.
Alta View Skyhomes prices and resale
The DLD has registered 230 sales since the tower went on sale, almost all from the developer; only 4 were resales by late September 2026 (Continental Club). Median prices paid are AED 776,424 for studios (41 sales), AED 1,197,982 for 1 bedrooms (157 sales) and AED 1,644,837 for 2 bedrooms (25 sales). Recent 1 bedroom sales between 25 June and 27 August 2026 ranged from about AED 1.01 million to AED 1.28 million. Continental Club calculates the building’s median price per square metre fell 5% over the past year while the wider district rose 2%.
Alta View Skyhomes payment plan
Property Finder and Object 1 list two plans. The standard plan is 20% on booking, 50% in eight construction instalments and 30% on handover. The post-handover plan takes the same 70% before handover, then 5% on handover and 25% in five instalments after it. Earlier broker listings from October 2025 showed a 10% deposit version (10/60/30), so terms have changed since launch. On a AED 748,000 studio, the 30% handover payment is AED 224,400.
Alta View Skyhomes developer and delivery record
Object 1 is part of the TSZ Group and has been registering projects in Dubai since 2022 (Data Habibi). Its website lists two completed buildings, RA1N Residence (handed over Q1 2026) and V1ter Residence (Q3 2026), both in JVC District 12. Data Habibi counts 2 completed projects with 324 units delivered against about 6,400 units under construction, and 6 active projects past their announced handover dates. Object 1 says its earlier JVC buildings, such as 1WOOD Residence, have 12 to 16 residential floors, so Alta View is a much taller build than its delivered stock.
What to check before buying at Alta View Skyhomes
- Which completion date the SPA uses, Q4 2028 or 30 June 2029, and the grace period after it.
- The DLD progress at each instalment date. Eight construction instalments are due while the tower was under 6% complete in September 2026.
- Resale prices against the developer price. Registered prices per square metre fell 5% over the past year.
- Object 1’s delivery of its other 2026 and 2027 projects, given its short record of completed buildings.
Alta View Skyhomes location: Jumeirah Village Circle (JVC), District 10, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Alta View Skyhomes handover date?
Object 1 gives Q4 2028 (December 2028 on its project page). The DLD register lists a later completion date of 30 June 2029 (DLD register via Continental Club, inspection 16 Sep 2026).
What is the Alta View Skyhomes completion date?
The registered completion date is 30 June 2029. Object 1's own brochure brief, as published by Mitchells, also gives June 2029, while the developer's website and Property Finder give Q4 2028.
What is the Alta View Skyhomes price?
Object 1 lists studios of 416 sq ft from AED 748,000, 1 bedrooms of 719 to 1,136 sq ft from AED 1,149,000 and 2 bedrooms of 1,164 to 2,122 sq ft from AED 1,630,000 (October 2026). Median DLD registered prices are AED 776,424 for studios and AED 1,197,982 for 1 bedrooms.
What is the Alta View Skyhomes payment plan?
The standard plan is 20% on booking, 50% in eight instalments during construction and 30% on handover. A post-handover option keeps the 70% before handover, then 5% on handover and 25% in five instalments after it (Property Finder and Object 1).
Is Alta View the same as ALTA V1EW?
Yes. Object 1 styles the name with a digit 1, so ALTA V1EW Skyhomes, Alta View Skyhomes and Altaview all refer to the same tower in JVC District 10, DLD project 3842.