
Safa Two by de GRISOGONO
Safa Two by de GRISOGONO on Sheikh Zayed Road. DAMAC's estimated handover is 2027; no published quarter or payment plan was found.
Short answer
Safa Two by de GRISOGONO, DAMAC's 87 storey tower on Sheikh Zayed Road in Business Bay, has an estimated handover of 2027, with no specific quarter published. Substructure and piling work were under way as of December 2023, and no construction percentage for 2026 was found. Recent transactions range from about AED 2.0 million to AED 2.25 million for a 1 bedroom unit up to more than AED 3 million for a 3 bedroom. A payment plan breakdown is not published.
- Status
- under construction
- Handover
- 2027 (estimated, no quarter published)
- Payment plan
- Not published
- Starting price
- From about AED 2.0M (1 bedroom, transactions, 2026)
Storeys
87 plus 1 basement
Propsearch
Estimated handover
2027
Propsearch, Aug 2026
1 bedroom transaction range
AED 2.0M to 2.25M
Propsearch, 2026
2 bedroom transaction range
AED 2.8M to 3.1M
Propsearch, 2026
When will Safa Two be handed over?
Propsearch lists an estimated handover of 2027, without a specific quarter. Substructure and piling work were under way as of December 2023, described as “progressing as planned” at that stage. No construction percentage for 2026 has been published, so progress since then cannot be confirmed.
What is the Safa Two payment plan?
Not published. No breakdown of booking, construction or handover instalments was found. Ask DAMAC or an authorised agent for the current schedule and how the 4% DLD registration fee is billed alongside it before booking.
What do homes at Safa Two cost?
| Home type | Size | Transaction price (AED) |
|---|---|---|
| Studio | From 370 sq ft | Not published |
| 1 bedroom | From 680 sq ft | 2.0M to 2.25M |
| 2 bedroom | From 1,100 sq ft | 2.8M to 3.1M |
| 3 bedroom | From 1,400 sq ft | Over 3M |
These figures come from recorded transactions rather than a published price list, so they reflect what has sold, not a current asking price for every unit.
Who is the developer and what is its handover record?
DAMAC Properties reports 50,000 units delivered to date and 8,800 handovers planned across its portfolio for 2026. No handover date specific to Safa Two has been published against which to measure this project.
What to check before booking
- The current construction percentage for this building, through the Dubai Land Department’s project status enquiry service, since no 2026 figure has been published.
- The payment plan and 4% DLD fee structure, in writing, since neither is published.
- The handover date and grace period written into your sale and purchase agreement, rather than the 2027 estimate alone.
- The exact unit and floor, since prices vary widely between the studio, 1, 2 and 3 bedroom types shown above.
Questions buyers also ask
When will Safa Two be handed over?
Propsearch lists an estimated handover of 2027, with no specific quarter published. DAMAC has not published a revised or more precise date.
What is the payment plan for Safa Two?
Not published. No instalment breakdown is published.
How much do apartments cost at Safa Two?
Recent transactions range from about AED 2.0 million to AED 2.25 million for a 1 bedroom, AED 2.8 million to AED 3.1 million for a 2 bedroom, and over AED 3 million for a 3 bedroom unit.
How many storeys does Safa Two have?
87 storeys plus 1 basement level, on Sheikh Zayed Road in Business Bay.
Who designed Safa Two?
DAMAC developed the tower in partnership with the Swiss jeweller de GRISOGONO, which lends its name and interior design to the project.
