Serenz by Danube
Serenz by Danube in JVC has a registered completion date of 31 December 2029. Danube reported 3% on 30 September 2026. Prices, sizes and payment plans.
Short answer
Serenz by Danube, a 1,227 unit tower in Jumeirah Village Circle (JVC), has a registered completion date of 31 December 2029 on the Dubai Land Department (DLD) register, and Danube says 2029. The DLD inspection of 15 July 2026 recorded 0.08%, and Danube's own inspection on 30 September 2026 put progress at 3%, with piling and excavation under way. It launched in February 2026 from AED 850,000; registered studio sales have a median of AED 886,000.
- Status
- under construction
- Handover date
- Registered completion date 31 Dec 2029; Danube says 2029
- Construction
- 0.08% complete (DLD inspection, 15 Jul 2026); Danube reported 3% on 30 Sep 2026
- Payment plan
- 30/70 plan listed by Danube in Oct 2026; launched on Danube's 1% monthly plan
- Starting price
- From AED 850,000 at launch (Feb 2026); from AED 1.1 million on Danube's site in Oct 2026
Registered completion date
31 Dec 2029
DLD project register via Continental Club; Danube says 2029
Construction progress
3%
Danube inspection, 30 Sep 2026; DLD recorded 0.08% on 15 Jul 2026
Units
1,227
DLD register; Danube's site says 1,250
Median registered studio price
AED886,000
266 DLD sales, via Continental Club, Oct 2026
When will Serenz by Danube be handed over?
The Dubai Land Department (DLD) register gives Serenz by Danube a registered completion date of 31 December 2029. Danube’s own page says 2029, and Alnair reported a Q4 2029 completion when the tower launched in February 2026.
The project is at the start of its build. Construction was registered as starting on 1 May 2026. The DLD inspection of 15 July 2026 recorded 0.08%. Danube’s internal inspection on 30 September 2026 put overall progress at 3%, with piling and excavation in progress. The two figures come from different inspections eleven weeks apart.
Building-by-building dates and how the date has changed: Serenz by Danube handover date.
Serenz by Danube construction update
- Launch: 9 February 2026 (Danube via Business Wire).
- Registered construction start: 1 May 2026.
- DLD inspection, 15 July 2026: 0.08%.
- Danube inspection, 30 September 2026: 3%, piling and excavation in progress.
- Registered completion date: 31 December 2029.
The DLD register lists the project as “Serenz By Danube”, number 4338, with Commercial Bank of Dubai as escrow bank.
Serenz by Danube homes and sizes
All apartments are sold furnished. The DLD register lists 1,227 units, while Danube’s site gives 1,250 apartments.
| Home type | Units (DLD) | Size |
|---|---|---|
| Studio | 470 | 381 to 439 sq ft |
| 1 bedroom | 626 | 539 to 805 sq ft |
| 2 bedroom | 91 | 853 to 1,208 sq ft |
| 3 bedroom | 17 | 1,307 to 1,693 sq ft |
| Other units | 23 | 969 to 2,325 sq ft |
Sizes exclude the smallest and largest 5% of each type (DLD register via Continental Club, October 2026).
Serenz by Danube prices and resale
Danube launched Serenz with prices from AED 850,000 (9 February 2026), and Alnair reported studios from AED 852,000. By October 2026 the starting price had risen: Danube’s site showed AED 1.1 million, and OffPlan Insider listed studios from AED 932,000 and 1 bedrooms from AED 1,316,000 (3 October 2026).
The DLD had recorded 567 sales by early October 2026, all but one from the developer. Medians by type:
- Studio, about 388 sq ft: AED 886,000.
- 1 bedroom, about 570 sq ft: AED 1,294,950.
- 2 bedroom, about 872 sq ft: AED 1,905,120.
- 3 bedroom, about 1,302 sq ft: AED 2,303,000.
The overall median is about AED 2,252 per sq ft (Continental Club, October 2026).
Serenz by Danube payment plan
Sources describe the plan in different ways. At launch, Danube said Serenz was sold on its 1% monthly plan, and Alnair called it a 70/30 split. Binayah breaks that plan into 10% down, 59% during construction, 1% on handover and 30% after handover. In October 2026, Danube’s site listed a 30/70 plan instead. OffPlan Insider gives its steps as 10% on booking, 10% two months later, 5% at ten months, 5% at eighteen months and 70% on handover (8 October 2026). The plan in the SPA is the one that applies.
Serenz by Danube developer and delivery record
Danube says it has completed 16 projects and announced in July 2026 that 11 more would hand over within 12 months (Danube via Arabian Post, 30 July 2026). Serenz, launched in 2026, is not among them. The Danube Properties review covers its record across those projects.
What to check before buying at Serenz by Danube
- Which plan is in the SPA. A 1% monthly plan and a 30/70 plan put very different amounts due before the end of 2029.
- The completion date and grace period in the SPA. The register date is 31 December 2029.
- The price paid against registered sales. Starting prices rose from AED 850,000 to about AED 1.1 million in eight months.
- The escrow account. Payments for project 4338 go to the Commercial Bank of Dubai escrow account named on the register.
Serenz by Danube location: Jumeirah Village Circle, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Serenz by Danube handover date?
The DLD register gives 31 December 2029 as the registered completion date. Danube's own page says 2029, and Alnair reported Q4 2029 at launch (11 Feb 2026).
What is the Serenz by Danube completion date?
31 December 2029 on the DLD register. Construction was registered as starting on 1 May 2026, and Danube reported 3% progress on 30 September 2026.
What is the Serenz by Danube price?
Danube launched Serenz in February 2026 with prices from AED 850,000. In October 2026 Danube's site showed a starting price of AED 1.1 million. Registered sales have medians of AED 886,000 for studios and AED 1,294,950 for 1 bedrooms (DLD via Continental Club).
What is the Serenz by Danube payment plan?
Danube marketed Serenz at launch on its 1% monthly plan. In October 2026 its site listed a 30/70 plan, and OffPlan Insider gave the split as 10% on booking, 10% after two months, 5% at ten months, 5% at eighteen months and 70% on handover (8 Oct 2026).
How many floors does Serenz by Danube have?
Danube's site describes a 50 storey tower. The launch release described a 50 plus 25 storey development.