Illustration: a residential tower under construction at dusk
Deniz Properties · Dubailand Residence Complex (DLRC)

09 Life Residences

Deniz Properties' 127-unit furnished apartment building in DLRC, launched January 2026. Registered completion 1 December 2027, 6.84% built in August 2026, studios from AED 675,000.

Studio, 1, 2 and 3 bedroom furnished apartments Updated 11 October 2026

Short answer

09 Life Residences, a 127-unit building by Deniz Properties in Dubailand Residence Complex (DLRC), has a registered completion date of 1 December 2027, and brokers give a handover target of Q3 2027. The last Dubai Land Department (DLD) inspection, on 26 August 2026, recorded it 6.84% complete. It launched on 27 January 2026 with studios from AED 675,000, 20% down and 40% payable over three years after handover.

Status
under construction
Handover date
DLD registered completion 1 Dec 2027; developer Q3 2027
Construction
6.84% complete (DLD inspection, 26 Aug 2026)
Payment plan
20% down payment, 40% after handover over 3 years (developer); variants with 10% on handover
Starting price
Studios from AED 675,000 (Deniz, launch Jan 2026)

Registered completion date

1 Dec 2027

DLD project register via Continental Club

Construction progress

6.84%

DLD inspection, 26 Aug 2026

Homes

127 apartments

48 studios, 52 one bed, 19 two bed, 8 three bed (DLD via Continental Club)

Starting price at launch

AED675,000

Deniz Properties, studio

When will 09 Life Residences be handed over?

The Dubai Land Department (DLD) register gives 09 Life Residences a completion date of 1 December 2027. Brokers selling the project, including Grand Reve and Miva, give a handover target of Q3 2027, and Ezre lists Q3 2027 as the date published by the developer. Continental Club shows Q4 2027, in line with the registered date.

The DLD inspection of 26 August 2026 recorded the building 6.84% complete. With about 93 points left and 15 months to the registered date, the build would need to run far faster than it has so far to meet December 2027. The project appears in the DLD register as “09 Life Residences” (project number 4250) and in Deniz’s launch material as “09Life Residences”.

Building-by-building dates and how the date has changed: 09 Life Residences handover date.

09 Life Residences construction update

Construction started on 1 November 2025, about three months before the sales launch. DLD inspections recorded 2.37% on 17 December 2025, 5.54% on 1 June 2026 and 6.84% on 26 August 2026 (DLD register via Continental Club). That is about 4.5 points in the eight months to August 2026. The escrow bank is First Abu Dhabi Bank.

Grand Reve describes the building as a basement technical floor, a two-level parking podium, nine residential floors and a landscaped rooftop. The design and site supervision consultant is Mimar (Ain Alemirate, 28 January 2026).

09 Life Residences homes and sizes

Deniz sells the apartments fully furnished, with BOSCH and LG appliances and a home automation system (Grand Reve). The DLD unit mix is below.

Home type Units Size
Studio 48 388 to 485 sq ft
1 bedroom 52 761 to 953 sq ft
2 bedroom 19 975 to 1,111 sq ft
3 bedroom 8 1,529 to 1,700 sq ft

Counts and sizes are from the DLD register via Continental Club, excluding the smallest and largest 5% of each type. Developer lists on portals give a wider range of 391 to 1,743 sq ft (Ezre).

09 Life Residences prices and resale

Deniz launched the project on 27 January 2026 at the Ritz-Carlton DIFC, with studios from AED 675,000 (Deniz; Ain Alemirate). Grand Reve lists 1 bedrooms from AED 1,160,000, 2 bedrooms from AED 1,300,000 and 3 bedrooms from AED 2,080,000. By October 2026 Ezre showed a lowest price of AED 708,969.

Continental Club lists 38 DLD sales from March 2026, all from the developer, at a median of about AED 1,461 per sq ft. Recent DLD sales were:

  • two 1 bedrooms of about 773 and 806 sq ft for AED 1,341,999 and AED 1,353,999 on 28 September 2026
  • a 2 bedroom of about 1,065 sq ft for AED 1,600,000 on 18 September 2026
  • studios of about 421 sq ft for AED 612,750 on 3 September 2026 and AED 658,069 on 18 September 2026

Studios have sold close to or below the launch price, while 1 bedroom sales in September 2026 were above Grand Reve’s AED 1,160,000 starting figure.

09 Life Residences payment plan

Deniz advertises 20% down and 40% after handover over three years. Grand Reve gives the full split as 20% on booking, 40% during construction, 10% on handover and 30% over three years after handover. Ezre lists five developer plans, including 20% on booking, 40% during construction, 4% on handover and 36% after handover. Continental Club shows a 60/40 plan with 40% on handover. The versions differ on how much falls due at handover, from 4% to 40%.

09 Life Residences developer and delivery record

Deniz Properties’ preceding project, 08 Life Residences in International City 2, has 107 units and a registered completion date of 31 May 2026. The DLD inspection of 26 August 2026 recorded that building 64.87% complete, three months after its registered date (DLD register via Continental Club). At the 09 Life launch in January 2026, Deniz said it was approaching delivery of 08 Life. Seeniun Properties, the sales partner, said Deniz starts construction before launching sales, which matches the 09 Life record.

What to check before buying at 09 Life Residences

  1. Which payment plan the SPA uses, since published versions put between 4% and 40% on handover.
  2. Progress at 08 Life Residences, the developer’s preceding building, which was behind its registered date in August 2026.
  3. The furnishing schedule, since the price includes furniture and appliances that should be listed in the SPA.
  4. DLD prices for the same layout, since studio sales have been close to or below the launch price.

09 Life Residences location: Dubailand Residence Complex, Dubai

Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.

Questions buyers also ask

What is the 09 Life Residences handover date?

The DLD register gives a completion date of 1 December 2027. Brokers including Grand Reve and Miva give Q3 2027. The building was 6.84% complete at the DLD inspection of 26 August 2026.

What is the 09 Life Residences completion date?

The registered completion date is 1 December 2027 (DLD project register via Continental Club). Construction started on 1 November 2025.

What is the 09 Life Residences price?

Deniz launched studios from AED 675,000. Grand Reve lists 1 bedrooms from AED 1,160,000, 2 bedrooms from AED 1,300,000 and 3 bedrooms from AED 2,080,000. DLD sales in September 2026 included studios at AED 612,750 and AED 658,069 and 1 bedrooms at about AED 1.34 million to AED 1.35 million.

What is the 09 Life Residences payment plan?

Deniz advertises 20% down and 40% after handover over three years. Grand Reve breaks this down as 20% on booking, 40% during construction, 10% on handover and 30% over three years after handover.

Sources

  1. DLD project register via Continental Club, 09 Life Residences (opens in a new tab)continentalclub.ae · inspection 26 Aug 2026; registry updated 8 Oct 2026
  2. Grand Reve Realty, 09 Life Residences (opens in a new tab)grandreverealty.com · accessed 11 Oct 2026
  3. Ezre, 09 Life Residences (opens in a new tab)ezre.ae · accessed 11 Oct 2026