Illustration: aerial view of a waterfront villa community at sunset
DP World and multiple developers · Dubai Maritime City

Dubai Maritime City

Dubai Maritime City is DP World's district of towers with studio to 4 bedroom apartments by several developers, from AED 1.1M at Oceanz by Danube (2026).

Studios to 4 bedroom apartments and duplexes, across separate towers

How this page was made: figures from the DLD project register and the developer and portal pages listed under Sources, as at 6 October 2026. Text drafted with AI assistance from those sources. Every figure matched the fact records at the build on 12 November 2026. Not yet reviewed line by line by a person. How facts are checked

Status
under construction
Handover date
By tower: complete since 2022 to Q4 2029 Full handover record
Construction
Towers 0.11% to 85.45% built (DLD, Sep 2026)
Payment plan
Varies by tower. Not published community wide
Starting price
From AED 1.1M (Oceanz by Danube, Bayut, 2026)

Residential towers tracked

8

2 complete (Anwa; Riva Residence, DLD Dec 2025), 6 under construction or launched. Bayut, 28 Sep 2026; Mitchells, 5 Oct 2026

District area

249 hectares

Bayut, accessed 28 Sep 2026

Riva Residence, construction

100%

DLD inspection 22 Dec 2025, via Mitchells, 5 Oct 2026

Latest published handover

Chelsea Residences by DAMAC, Q4 2029

Bayut, accessed 28 Sep 2026

What is Dubai Maritime City?

Dubai Maritime City is a DP World development on a peninsula between Port Rashid and Dubai Dry Docks, close to Bur Dubai. It covers about 249 hectares and mixes industrial, commercial and residential precincts, including a Harbour Residences district, a Maritime Centre and an Academic Quarter. The site has been under development for more than a decade, with infrastructure works continuing well past its original targets.

Which residential towers are being built in Dubai Maritime City?

DP World is the master developer of the district. The residential towers inside it are built by separate companies. Anwa by Omniyat was completed in 2022, and the DLD register recorded Riva Residence 100% built in December 2025. The others below are under construction or newly launched.

Tower Developer Home types Published handover Starting price
Anwa Omniyat Studios to 3 bed, plus 4 bed duplex Complete, 2022 Not published
Riva Residence Vakson 1 to 3 bed Q4 2025. DLD recorded 100% built on 22 Dec 2025 From AED 1.75M
Nautica (One and Two) Not named on source page 1 to 2 bed Q4 2026 From AED 1.4M
Mar Casa Deyaar 1 to 3 bed, plus penthouses Q4 2026. DLD registered completion date 31 Oct 2026; 56.45% built on 4 Aug 2026 From AED 1.28M
Oceanz Danube Properties Studio to 3 bed Q1 2027. Oceanz 1 to 3 were 20.64% to 50.04% built in Aug 2026 (DLD) From AED 1.1M
Saria Tower Beyond 1 to 3 bed, plus 4 bed penthouses Q3 2027 (Bayut). Beyond expects Q1 2028 (Mar 2026) From AED 1.7M
Coral Reef DAMAC Properties 1 to 3 bed Q1 2028 From AED 1.66M
Chelsea Residences DAMAC Properties 1 to 3 bed Q4 2029 From AED 2.17M

Home types, published handover dates and prices come from Bayut’s area guide, accessed 28 September 2026, rather than from each developer’s own project page. Construction figures come from the DLD register. The DLD register also lists Anwa Aria by Omniyat and Breez by Danube in the district.

Building-by-building dates and how the date has changed: Dubai Maritime City handover date.

Who is the developer of Dubai Maritime City and what is its record?

DP World, the Dubai government owned ports and logistics group, is the master developer behind Dubai Maritime City. It sets out the district’s infrastructure and precincts, but does not build the residential towers itself. Those are developed separately by companies including Omniyat, DAMAC Properties, Danube Properties, Deyaar and Beyond, each with its own sales, construction and handover record.

Is Dubai Maritime City a good investment?

The district is mostly off-plan. DXB Analytics counted 8,068 sales but only 154 Ejari rental contracts since January 2024, and a gross yield of 3.90% on AED 2,784 per sq ft (March 2026). The off-plan median was AED 3,087 per sq ft in the 12 months to 26 September 2026 (DLD data via Mitchell’s). Thousands of units across Oceanz, Mar Casa, Saria, Coral Reef, Chelsea Residences and Breez are due between late 2026 and 2029. The main factors are rents once that supply lands and each tower’s own handover date.

Dubai Maritime City handover date

Latest position: By tower: complete since 2022 to Q4 2029. Construction: Towers 0.11% to 85.45% built (DLD, Sep 2026). The full record, with how the date has changed and what it means for your payments, is on the Dubai Maritime City handover date page.

What to check before booking in Dubai Maritime City

  1. Which company is actually developing your tower, since Dubai Maritime City has several developers building under one district name.
  2. The handover date in your sale and purchase agreement, rather than a district wide description.
  3. The DLD project status for your building, through Dubai Land Department’s project status enquiry service.
  4. Whether a registered date has already passed, as with Anwa Aria’s 31 January 2026 date, which the tower had not met at 84.86% built in September 2026.

Dubai Maritime City location: Dubai Maritime City, Dubai

Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.

Questions buyers also ask

Is Dubai Maritime City finished?

No. It is a DP World maritime district still being built out. Anwa by Omniyat has been complete since 2022, and Riva Residence was recorded 100% built at the DLD inspection of 22 December 2025. The other towers are under construction or newly launched, with published handover dates up to Q4 2029 (Bayut, accessed 28 Sep 2026; Mitchells, 5 Oct 2026).

Which developers build in Dubai Maritime City?

DP World is the master developer of the district itself. Individual residential towers are built by separate companies, including Omniyat, DAMAC Properties, Danube Properties, Deyaar and Beyond (Bayut, accessed 28 Sep 2026).

What is the cheapest new listing in Dubai Maritime City?

Bayut listed Oceanz by Danube from about AED 1.1 million, with a published handover date of Q1 2027 (Bayut, accessed 28 Sep 2026). DLD inspections in August 2026 put Oceanz 1 to 3 between 20.64% and 50.04% complete, although Danube's July 2026 statement lists all three among projects to hand over within 12 months.

Where exactly is Dubai Maritime City?

On a peninsula between Port Rashid and Dubai Dry Docks, close to Bur Dubai (Bayut, accessed 28 Sep 2026).

Sources

  1. Dubai Maritime City, official site (opens in a new tab)dubaimaritimecity.com · accessed 28 Sep 2026
Request a Unit Review