Illustration: a residential tower under construction at dusk
Emirates Properties Group · Jumeirah Village Triangle (JVT)

Azha Millennium Residences

Emirates Properties Group's 30-storey Millennium-branded tower in JVT District 4. Registered completion 1 September 2027, 30.07% built in September 2026, 50/50 post-handover plan.

Studio, 1 and 2 bedroom apartments Updated 11 October 2026

Short answer

Azha Millennium Residences, a 30-storey tower by Emirates Properties Group in Jumeirah Village Triangle (JVT), has a registered completion date of 1 September 2027, and the developer's handover target is Q4 2027. The Dubai Land Department (DLD) inspection of 29 September 2026 recorded it 30.07% complete, up from about 14.6% in February. Prices start from AED 650,000, and the plan leaves 50% of the price for 36 months after handover.

Status
under construction
Handover date
DLD registered completion 1 Sep 2027; developer Q4 2027
Construction
30.07% complete (DLD inspection, 29 Sep 2026)
Payment plan
10% on booking, 30% during construction, 10% on handover, 50% over 36 months after handover
Starting price
From AED 650,000 (studio)

Registered completion date

1 Sep 2027

DLD project register via Continental Club

Construction progress

30.07%

DLD inspection, 29 Sep 2026

Homes

196 apartments plus retail

Developer; the DLD register lists 200 units

Median sale price per sq ft

AED1,583

67 DLD sales since Oct 2025 (Crown Key, 26 Sep 2026)

When will Azha Millennium Residences be handed over?

The Dubai Land Department (DLD) register gives Azha Millennium Residences a completion date of 1 September 2027. Emirates Properties Group announced a Q4 2027 completion at launch in June 2025 (Construction Week, 14 June 2025), and Property Finder lists December 2027. The DLD inspection of 29 September 2026 recorded the tower 30.07% complete.

With about 70 points left, the tower would need about 6 points a month to meet the registered date and about 4.7 points a month to finish by December 2027. Between February and September 2026 it averaged a little over 2 points a month. The project is registered by Azha JVT Residences, an Emirates Properties Group company (DLD project number 3482).

Building-by-building dates and how the date has changed: Azha Millennium Residences handover date.

Azha Millennium Residences construction update

Construction started on 1 June 2025. Between the inspections of 25 February 2026 and 29 September 2026, the tower gained 15.45 points, from about 14.6% to 30.07% (DLD register via Continental Club). The structure is a basement, ground floor, four podium levels, 30 residential floors and a roof, with shops on the ground floor (Azha; DLD register description via Crown Key). The escrow bank is Abu Dhabi Commercial Bank.

The developer’s project page carries a live site camera and a handover countdown but no dated progress figure.

Azha Millennium Residences homes and sizes

Emirates Properties Group describes 196 apartments branded by Millennium Hotels and Resorts, plus retail space, in a project valued at AED 350 million (Construction Week, 14 June 2025). The DLD register lists 200 units, which includes 4 other units.

Home type Units Developer size (with balcony) DLD size range
Studio 56 452 sq ft 375 to 475 sq ft
1 bedroom 84 951 sq ft 843 to 977 sq ft
2 bedroom 56 1,472 sq ft 1,427 to 1,491 sq ft

Developer sizes are from the Azha project page. DLD ranges are from the register via Continental Club, excluding the smallest and largest 5% of each type.

Azha Millennium Residences prices and resale

Prices start from AED 650,000 (Continental Club; Tanami Properties). Crown Key counts 67 DLD sales from October 2025 to late September 2026, at a median of AED 1,583 per sq ft (26 September 2026). Continental Club’s median for studios is about AED 1,700 per sq ft and for 1 bedrooms about AED 1,500. Recent DLD sales were:

  • a studio of about 375 sq ft for AED 684,184 on 21 September 2026
  • a 1 bedroom of about 843 sq ft for AED 1,313,123 on 21 September 2026
  • a 1 bedroom of about 872 sq ft for AED 1,309,358 on 1 September 2026

Studios have sold between about AED 664,000 and AED 796,000 since April 2026, and 1 bedrooms between about AED 1.27 million and AED 1.41 million (DLD via Continental Club).

Azha Millennium Residences payment plan

The launch plan is 10% on booking, 30% during construction, 10% on handover and 50% over 36 months after handover (Construction Week, 14 June 2025). Property Finder, Tanami Properties and Continental Club list the same plan in 2026. Buyers therefore pay 50% by the end of handover and the rest over three years. Crown Key notes that the 4% DLD fee is usually paid with the booking instalment.

Azha Millennium Residences developer and delivery record

Emirates Properties Group is an Ajman-based developer best known for the Azha Community of about 1,800 villas in Al Amerah, Ajman. Its own construction updates show some slippage. Azha-1 had a forecast finish of 14 August 2025 and was 98.75% complete on 31 January 2026. At Azha Al Aamra Residences, buildings A, B and D had a forecast finish of 31 May 2026 and were 80% to 82% complete on 30 September 2026.

What to check before buying at Azha Millennium Residences

  1. Which completion date the SPA uses, since the registered 1 September 2027 date and the developer’s Q4 2027 differ.
  2. The post-handover schedule, which starts at handover and runs for 36 months.
  3. The branded-residence terms, including how Millennium Hotels and Resorts services affect the service charge.
  4. The group’s progress on Azha-1 and Azha Al Aamra, which ran past their forecast finish dates.

Azha Millennium Residences location: Jumeirah Village Triangle, Dubai

Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.

Questions buyers also ask

What is the Azha Millennium Residences handover date?

The DLD register gives a completion date of 1 September 2027, and Emirates Properties Group gave Q4 2027 at launch. Property Finder lists December 2027. The tower was 30.07% complete at the DLD inspection of 29 September 2026.

What is the Azha Millennium Residences completion date?

The registered completion date is 1 September 2027 (DLD project register). Construction started on 1 June 2025.

What is the Azha Millennium Residences price?

Prices start from AED 650,000 (Continental Club, Tanami Properties). DLD sales in September 2026 included a studio of about 375 sq ft for AED 684,184 and 1 bedrooms for AED 1,309,358 and AED 1,313,123.

What is the Azha Millennium Residences payment plan?

10% on booking, 30% during construction, 10% on handover and 50% over 36 months after handover, as announced at launch (Construction Week, 14 Jun 2025).

Sources

  1. DLD project register via Continental Club, Azha Millennium Residences (opens in a new tab)continentalclub.ae · inspection 29 Sep 2026; registry updated 4 Oct 2026
Request a Unit Review