Sukoon by Nuri
Sukoon by Nuri in Meydan, Nad Al Sheba 1: handover and completion date of 31 December 2026, DLD progress of 46.77%, prices from AED 1.5 million and the 30/70 payment plan.
Short answer
Sukoon by Nuri has a registered completion date of 31 December 2026, and the developer gives a Q4 2026 handover. The DLD inspection on 30 June 2026 recorded the 41 unit building 46.77% complete, so just over half the work remained six months before that date. Prices start from AED 1.5 million, and 70% of the price is due on handover.
- Status
- under construction
- Handover date
- Q4 2026 (Nuri Living, via portals); DLD registered completion date 31 Dec 2026
- Construction
- 46.77% complete (DLD inspection, 30 Jun 2026)
- Payment plan
- 10% booking, 10% in Nov 2025, 10% in Mar 2026, 70% on handover (30/70)
- Starting price
- From AED 1,500,000 (1 bedroom)
DLD registered completion date
31 Dec 2026
DLD project register via Continental Club
Construction progress
46.77%
DLD inspection, 30 Jun 2026
Units
41
DLD register; 28 one bed, 8 two bed, 2 penthouses
Starting price
AED1,500,000
Property Finder, accessed 11 Oct 2026
When will Sukoon by Nuri be handed over?
Sukoon by Nuri has a registered completion date of 31 December 2026 in the DLD project register, where it appears as “Sukoon By Nuri” in Nad Al Sheba 1. Property Finder and fäm Properties list a December 2026 or Q4 2026 handover, and the developer supplied Q4 2026 to Continental Club.
The date has not changed in the sources available, but the building was under half complete at the end of June 2026.
Building-by-building dates and how the date has changed: Sukoon by Nuri handover date.
Sukoon by Nuri construction update
The DLD register records construction starting on 1 May 2025. Progress went from about 28.9% on 20 February 2026 to 46.77% on 30 June 2026, a gain of 17.92 points in just over four months. The escrow account is held at Al Ahli Bank of Kuwait, Dubai Branch, under DLD project number 3753.
At that pace of about 4.2 points a month, the remaining 53 points would take about 13 months from the June inspection, which points to mid 2027 rather than December 2026. This is a calculation from the register figures, not a revised date.
Sukoon by Nuri homes and sizes
Sukoon is a single low rise building, registered as one basement, ground, five floors and a roof level. Interiors are by Bergman Design House of London, and the roof has a pool and lounge (Data Habibi).
| Home type | Units (DLD) | Size (DLD) |
|---|---|---|
| 1 bedroom | 28 | 769 to 1,079 sq ft |
| 2 bedroom | 8 | 1,167 to 1,287 sq ft |
| 3 bedroom penthouse | 2 | 4,665 to 4,964 sq ft |
| Other, including retail | 3 | 460 to 679 sq ft |
Sizes are DLD register ranges, excluding the smallest and largest 5% of each type (Continental Club, October 2026). Data Habibi gives 40 units; the register lists 41. Some listings describe villas and townhouses, but the register and the developer describe an apartment building.
Sukoon by Nuri prices and resale
Property Finder lists a starting price of AED 1.5 million. Palmera lists 2 bedrooms from AED 2.4 million and 3 bedroom penthouses from AED 11 million. The DLD register shows 39 sales, all from the developer, at a median of about AED 1,966 per sq ft. Recorded sales range from AED 1,469,000 to AED 2,473,000. They include a 1 bedroom of about 818 sq ft at AED 1,556,000 and a 2 bedroom of about 1,216 sq ft at AED 2,436,000 (Continental Club, transactions to 3 October 2026).
Sukoon by Nuri payment plan
Agents list the plan as 10% on booking, 10% in November 2025, 10% in March 2026 and 70% on handover (The Dubai Lands; GCC Offplan). That makes it a 30/70 plan with no post-handover portion. Both dated instalments have passed, so for most buyers only the 70% balance remains. On a AED 1.5 million unit that is AED 1.05 million at handover.
Sukoon by Nuri developer and delivery record
Nuri Living, registered with DLD as Nuri Real Estate Development, was co-founded by Sheikh Mohammed bin Abdulla Al Thani and Sachin Gadoya (Data Habibi). It describes its approach as “conscious luxury” with sustainable materials.
What to check before buying at Sukoon by Nuri
- The SPA completion date and grace period, given that progress points to 2027 at the 2026 pace.
- Funding for the 70% handover payment, which falls due on completion whenever it comes.
- The service charge, quoted at AED 17 per sq ft by GCC Offplan, for a small building with a rooftop pool.
- Which unit type is involved, since the two penthouses of about 4,700 to 5,000 sq ft are priced very differently from the 1 bedroom units.
Sukoon by Nuri location: Meydan, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Sukoon by Nuri handover date?
Portals list Q4 2026 from the developer, and the DLD register holds a registered completion date of 31 December 2026 (Property Finder; Continental Club).
What is the Sukoon by Nuri completion date?
The registered completion date is 31 December 2026. The building was 46.77% complete at the DLD inspection on 30 June 2026, up from about 28.9% on 20 February 2026 (DLD project register via Continental Club).
What is the Sukoon by Nuri price?
1 bedroom apartments start from AED 1.5 million and 2 bedrooms from about AED 2.4 million (Property Finder; Palmera). DLD sales include a 1 bedroom of about 818 sq ft at AED 1,556,000 and a 2 bedroom of about 1,216 sq ft at AED 2,436,000.
What is the Sukoon by Nuri payment plan?
10% on booking, 10% in November 2025, 10% in March 2026 and 70% on handover, a 30/70 plan (The Dubai Lands; GCC Offplan). Nothing is due after handover.