Alaya
Majid Al Futtaim's grand villa cluster at Tilal Al Ghaf. Registered completion date 20 July 2026; DLD status changed to completed by 4 October 2026, with handovers to owners under way.
Short answer
Alaya, Majid Al Futtaim's grand villa cluster at Tilal Al Ghaf, had a registered completion date of 20 July 2026, and its Dubai Land Department status changed to finished on 30 September 2026. The last published DLD inspection, on 14 August 2026, recorded 91.45%. Majid Al Futtaim had targeted early 2026 when it awarded the contract in January 2024. Handovers to owners were under way in September 2026, and the original plan puts 40% of the price into instalments over two years after handover.
- Status
- partly handed over
- Handover date
- Registered completion date 20 Jul 2026; handovers under way from Q3 2026
- Construction
- 91.45% at last inspection (DLD, 14 Aug 2026); status completed (DLD, 30 Sep 2026)
- Payment plan
- 10% booking, 45% during construction, 5% on handover, 40% over 2 years after handover
- Starting price
- From AED 6.8M for a 4 bedroom villa at launch (2021)
Registered completion date
20 Jul 2026
DLD project 2322, via Mitchells Commercial Realty
DLD status
Completed
Changed 30 Sep 2026 (dubaihandover.com); last inspection 91.45%, 14 Aug 2026
Launch price, 4 bedroom villa
From AED6.8M
Belcato; Dubai Immo
Recent 5 bedroom resales
AED 12M to AED 18.25M
DLD sales, 7 to 24 Sep 2026, via Data Habibi
When will Alaya be handed over?
Alaya is a cluster of grand villas inside Tilal Al Ghaf, Majid Al Futtaim’s lagoon community off Hessa Street. Its registered completion date with the Dubai Land Department was 20 July 2026. The register status changed to finished on 30 September 2026 (dubaihandover.com), and Mitchells Commercial Realty’s copy of the register showed project 2322 as completed on 4 October 2026.
The last published DLD inspection, on 14 August 2026, recorded 91.45%. The status change came after that inspection, so the completion percentage on the register lags the status. Majid Al Futtaim’s own target was early 2026: when it appointed UNEC as contractor on 22 January 2024, it gave a 26 month build for an early 2026 handover.
Handovers are under way. An agent’s update on 4 September 2026 described Alaya North as in its handover phase, with snagging under way and owners beginning to receive their homes, and a snagging firm published an Alaya handover guide on 8 September 2026. Belcato lists Alaya as delivered in Q3 2026. Majid Al Futtaim has not published a completion announcement.
Building-by-building dates and how the date has changed: Alaya handover date.
Alaya construction update
UNEC (United Engineering Construction) is the main contractor. Majid Al Futtaim awarded Alaya and Elysian Mansions together in January 2024, in contracts worth AED 3 billion. The DLD register records a project start of 31 March 2022. DLD’s last published inspection, on 14 August 2026, put Alaya at 91.45%, before the status changed to completed. Dubaihandover.com notes that the register’s own headline completion field for Alaya holds an invalid value, so the dated inspection figure is the one to use.
Alaya homes and sizes
Majid Al Futtaim launched Alaya on 24 November 2021 as 130 grand villas across 200,000 sq m, with customisable facades, suites and landscaping. The DLD register lists 45 homes under project 2322: 8 four bedroom, 29 five bedroom and 8 six bedroom villas. Its filed description refers to 399 villas, revised from 164. A separate release, Alaya Gardens, added 235 villas on wider plots.
| Home type | Size |
|---|---|
| 4 bedroom villa | 5,908 to 6,897 sq ft |
| 5 bedroom villa | 5,908 to 8,192 sq ft |
| 6 bedroom villa | About 9,530 sq ft |
Sizes are from Belcato’s project listing, accessed 6 October 2026. Data Habibi lists some larger 5 and 6 bedroom layouts of up to 18,167 sq ft.
Alaya prices and resale
Launch prices started from AED 6.8 million for a 4 bedroom villa, AED 9.7 million for a 5 bedroom and AED 14 million for a 6 bedroom (Dubai Immo). DLD resales of 5 bedroom villas between 7 and 24 September 2026 ranged from AED 12 million for 5,933 sq ft to AED 18.25 million for 8,227 sq ft (Data Habibi). Dubaihandover.com puts the median at AED 2,099 per sq ft across 22 sales registered since 2 January 2026, against AED 1,373 per sq ft in 2022.
Alaya payment plan
The launch plan was 10% at reservation, 10% two months later, 5% every four months from June 2022, 5% on handover, then 10% every six months for two years after handover (Dubai Immo). Belcato summarises the same plan as 10% down, 45% during construction, 5% on handover and 40% after handover. For a villa at the AED 6.8 million entry price, AED 340,000 falls due on handover and AED 2.72 million follows in four instalments over two years.
Alaya developer and delivery record
Majid Al Futtaim has already handed over Elan, Aura and Harmony at Tilal Al Ghaf. Alaya reached its registered completion date of 20 July 2026, about six months after the developer’s early 2026 target, and its DLD status changed to finished ten weeks later. Data Habibi records Alaya Gardens as moved from Q4 2025 to Q3 2026.
What to check before buying at Alaya
- Whether the villa is in Alaya or Alaya Gardens, since they are listed separately, with different dates and plot sizes.
- The handover notice and snagging window for the specific villa, since handovers are rolling rather than on one day.
- For a resale, the post-handover balance, as up to 40% of the original price may still be owed to the developer after keys.
- The title deed status, which follows handover and settlement of the developer’s balance.
Alaya location: Tilal Al Ghaf, Al Hebiah Fourth, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Alaya handover date?
Alaya's registered completion date was 20 July 2026, and its DLD status changed to finished on 30 September 2026 (dubaihandover.com). The last published DLD inspection, on 14 August 2026, recorded 91.45%. Majid Al Futtaim had targeted early 2026 when it awarded the construction contract in January 2024.
Has Alaya been handed over?
Handovers have started. The DLD register listed Alaya as completed on 4 October 2026, and an agent's update on 4 September 2026 described Alaya North as in its handover phase, with snagging under way and owners beginning to receive homes. Majid Al Futtaim has not published a completion announcement.
What is the Alaya payment plan?
The launch plan was 10% at booking, 45% during construction, 5% on handover and 40% after handover, paid as 10% every six months for two years (Dubai Immo; Belcato). The post-handover instalments start once the villa is handed over.
Is Alaya the same as Alaya Gardens?
No. Alaya Gardens is a later release of 235 villas on larger plots. Data Habibi lists it separately, with a Q3 2026 date moved from Q4 2025 and 91% built.
How many villas are in Alaya?
Majid Al Futtaim announced 130 grand villas on 200,000 sq m at launch in November 2021 and repeated that figure in January 2024. The DLD register counts 45 homes under project 2322, so the register and developer figures do not match.