Binghatti Amberhall
Binghatti apartment and office tower in JVC District 13. The registered completion date of 28 February 2026 has passed, and DLD recorded 38.03% built on 30 April 2026.
Short answer
Binghatti Amberhall has no confirmed handover date. The Dubai Land Department (DLD) register gives a registered completion date of 28 February 2026, which has passed, and the last published DLD inspection, on 30 April 2026, recorded the tower 38.03% complete. Binghatti's own project page still says Q1 2026. Sales started on 15 February 2025 on a 20/50/30 payment plan, and 1 bedroom apartments of about 714 sq ft were offered from AED 1,189,999 on 1 October 2026.
- Status
- under construction
- Handover date
- Registered completion date 28 Feb 2026, now passed; Binghatti still lists Q1 2026
- Construction
- 38.03% complete (DLD inspection, 30 Apr 2026)
- Payment plan
- 20% on booking, 50% during construction, 30% on completion
- Starting price
- 1 bedroom from AED 1,189,999 (developer stock, 1 Oct 2026)
Registered completion date
28 Feb 2026
DLD register via Continental Club; date passed
Construction progress
38.03%
DLD inspection, 30 Apr 2026
Units on the DLD register
710
Binghatti lists 630 homes plus 38 offices and 39 shops
Median registered sale price
AED 1,662 per sq ft
420 DLD sales, 28 Apr 2025 to 5 Oct 2026, Mitchells
When will Binghatti Amberhall be handed over?
There is no confirmed handover date for Binghatti Amberhall. The Dubai Land Department (DLD) register holds a registered completion date of 28 February 2026 for the tower, DLD project 3552. That date has passed. At the last published DLD inspection, on 30 April 2026, the project was 38.03% complete (DLD project register via Continental Club, inspection 30 April 2026).
Binghatti’s own project page still says the tower is “expected to be completed by Q1 2026”, and Propsearch shows an estimated handover of March 2026. Neither has been revised. Construction started on 15 February 2025, so the original target allowed about one year for a tower with three basements, a podium and residential floors above. On 10 October 2026 Dubai Handover, which tracks the register daily, listed the project as 224 days past its registered date.
Building-by-building dates and how the date has changed: Binghatti Amberhall handover date.
Binghatti Amberhall construction update
The DLD register records construction starting on 15 February 2025 and progress of 38.03% at the inspection of 30 April 2026. The register extract published by Mitchells Commercial Realty, as at 4 October 2026, still shows 38.03% and the status “under construction”, so no newer inspection had been published by early October.
The building is described differently by each source. DLD’s filed description is three basements, ground, three podium levels, 13 residential floors and a roof. Binghatti describes three basements, ground, four podium levels and 19 residential floors. Propsearch counts 18 storeys and notes the plot was first meant for a cancelled project called Jouri 6. The developer’s estimate of the build cost, filed with DLD, is AED 335 million (Propsearch).
Binghatti Amberhall homes and sizes
Binghatti lists 630 homes: 230 studios, 322 one bedroom and 78 two bedroom apartments. The building also has 38 offices on the lower floors and 39 ground floor shops. The DLD register counts 710 units in total, while Propsearch estimates 683.
| Unit type | Number (Binghatti) | Sizes seen in DLD sales and listings |
|---|---|---|
| Studio | 230 | 366 to 409 sq ft |
| 1 bedroom | 322 | 713 to 850 sq ft |
| 2 bedroom | 78 | 1,264 to 1,622 sq ft |
| Office | 38 | 694 to 1,858 sq ft |
| Shop | 39 | 990 to 1,322 sq ft |
Sizes are from DLD sales between June and September 2026 (Mitchells, Propsearch) and developer listings on 1 October 2026 (DirectDXB).
Binghatti Amberhall prices and resale
Bookings opened on 15 February 2025, with a launch price of about AED 1.2 million recorded by Property Finder. On 1 October 2026 the remaining developer stock included 1 bedroom apartments of 714 to 738 sq ft from AED 1,189,999 and offices from AED 2,126,236 for 850 sq ft (DirectDXB; Binghatti).
DLD sales give a wider picture. Across 420 sales from 28 April 2025 to 5 October 2026, the median was AED 1,662 per sq ft and the median price AED 1.09 million (Mitchells). The quarterly median rose from AED 1,486 per sq ft in Q3 2025 to AED 1,892 in Q1 2026, though unit mix differs between quarters. Recent registrations include a 1 bedroom of 713 sq ft at AED 1,189,999 on 27 July 2026, a 2 bedroom of 1,264 sq ft at AED 1,604,999 and a studio of 403 sq ft at AED 650,000, both on 10 September 2026. Studios registered between AED 600,000 and AED 769,999 from June to September 2026.
Binghatti Amberhall payment plan
Binghatti sells Amberhall on its standard 70/30 plan: 20% on signing the contract, 50% during construction and 30% when the project is completed. In October 2026 developer stock showed three prices per unit. For the 714 sq ft 1 bedroom, the instalment price was AED 1,189,999, a plan with a larger deposit was AED 1,154,299 and the cash price was AED 1,118,599 (DirectDXB, 1 October 2026). The 4% DLD registration fee is paid on top.
Binghatti Amberhall developer and delivery record
Binghatti Developers is a Dubai developer founded in 2008. DLD records show 36 delivered Binghatti projects and 10,899 homes handed over, with 32 more in development (Oliva, accessed 11 October 2026). Several of its 2026 dates have slipped, as the Binghatti handover date tracker shows. Amberhall is one of the clearer cases: the registered date has passed with the tower well under half built at the last inspection.
What to check before buying at Binghatti Amberhall
- The completion date and grace period in the SPA. The registered date of 28 February 2026 is already behind, so the contract terms on delay matter more than the published quarter.
- The escrow account. Payments for DLD project 3552 belong in the project escrow account at United Arab Bank, which the Dubai REST app shows.
- Which instalments are already due. With 50% payable during construction, it helps to know which construction milestones have been certified and which payments fall before the next inspection.
- The unit type on the title. The 710 registered units include offices and shops, which trade at higher prices per sq ft than the apartments.
Binghatti Amberhall location: Jumeirah Village Circle, Dubai
Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.
Questions buyers also ask
What is the Binghatti Amberhall handover date?
No firm date has been published. The DLD register holds a registered completion date of 28 February 2026, which has passed. Binghatti's project page still lists Q1 2026. The last published DLD inspection, on 30 April 2026, recorded 38.03% complete (DLD project register via Continental Club).
What is the Binghatti Amberhall completion date?
The completion date on file at DLD is 28 February 2026 (DLD project 3552). Property Finder shows the same date and Propsearch an estimate of March 2026. The project was 38.03% built at the 30 April 2026 inspection, so that date was not met.
What is the Binghatti Amberhall payment plan?
Binghatti's plan is 20% on signing, 50% during construction and 30% on completion. In October 2026 developer stock also carried a cash price about 6% below the instalment price (DirectDXB, 1 Oct 2026).
What is the Binghatti Amberhall price?
Property Finder records a launch price of about AED 1.2 million in February 2025. On 1 October 2026, 1 bedroom apartments of 714 to 738 sq ft were offered from AED 1,189,999 and offices from AED 2,126,236 (DirectDXB; Binghatti). DLD sales from April 2025 to October 2026 had a median of AED 1,662 per sq ft (Mitchells).
How many units are in Binghatti Amberhall?
Binghatti lists 630 homes (230 studios, 322 one bedroom and 78 two bedroom), plus 38 offices and 39 shops. The DLD register lists 710 units and Propsearch 683.