Illustration: a residential tower under construction at dusk
Danube Properties · Dubai Sports City

Aspirz by Danube

Aspirz by Danube in Dubai Sports City: Q4 2028 handover, completion date 31 December 2028 on the DLD register, 5.08% built (DLD) and 11% (Danube), prices from AED 850,000.

Studio to 3 bedroom furnished hotel apartments, plus offices Updated 11 October 2026

Short answer

Aspirz by Danube, a 40 floor tower of hotel apartments and offices in Dubai Sports City, is due for handover in Q4 2028. The Dubai Land Department (DLD) register gives a completion date of 31 December 2028 and recorded the tower 5.08% complete on 30 July 2026; Danube's own inspection put it at 11% on 30 September 2026, with piling and shoring done. Prices start from AED 850,000 on Danube's 1% monthly plan.

Status
under construction
Handover date
Q4 2028 (Danube); registered completion date 31 Dec 2028 (DLD)
Construction
5.08% complete (DLD inspection, 30 Jul 2026); 11% (Danube internal inspection, 30 Sep 2026)
Payment plan
Danube's 1% monthly plan; brokers list 10/60/30 and a 10/51/9/30 option with 30% over 30 months after handover
Starting price
From AED 850,000 (Danube, studio flex or standard office)

Registered completion date

31 Dec 2028

DLD register via Continental Club, updated 1 Oct 2026

Construction progress

5.08% (DLD) / 11% (Danube)

DLD inspection 30 Jul 2026; Danube inspection 30 Sep 2026

Units

706

DLD register; Danube's launch figure was 698

Median studio price paid

AED870,000

112 DLD sales, via Continental Club, Oct 2026

When will Aspirz by Danube be handed over?

Danube gives Q4 2028 for Aspirz by Danube, the same date it announced at launch in 2025. The Dubai Land Department (DLD) register, where the project appears as “Aspirz By Danube” (project 3838), gives a completion date of 31 December 2028. The developer date and the register date agree.

The DLD inspection of 30 July 2026 recorded the tower 5.08% complete. Danube’s own internal inspection of 30 September 2026 put overall progress at 11%. The two figures are two months apart and measured differently, so they are not a contradiction, but only the DLD figure is an independent inspection.

Building-by-building dates and how the date has changed: Aspirz by Danube handover date.

Aspirz by Danube construction update

The DLD register records a construction start of 1 November 2025, with progress up 3.96 points between the inspections of 6 April and 30 July 2026. Danube’s update of 30 September 2026 lists shoring and piling completed, the main contractor appointed, and excavation and substructure works in progress. The escrow account is with First Abu Dhabi Bank.

The register describes one mixed-use building with two basements, a ground floor, seven podium levels and 40 upper floors.

Aspirz by Danube homes and sizes

At launch Danube described 698 units: 266 offices on floors 2 to 15 and 432 hotel apartments on floors 17 to 40 (Construction World, 25 August 2025). The DLD register holds 706 units. Apartments are sold furnished, and several “flex” layouts have a multipurpose room that can be closed off as an extra bedroom.

Home type Size (DLD register) Starting price (Danube)
Studio flex 376 to 394 sq ft AED 850,000
1 bedroom 473 to 792 sq ft AED 1,125,000
1 bedroom flex plus within the 1 bedroom range AED 1,350,000
2 bedroom flex plus 850 to 1,012 sq ft AED 1,750,000
3 bedroom flex plus 1,315 to 1,329 sq ft AED 2,500,000
Standard office not published AED 850,000

Sizes are the register’s typical ranges published by Continental Club; 380 further units on the register, mostly offices, are listed at 328 to 805 sq ft.

Aspirz by Danube prices and resale

The DLD has registered 535 sales, all but 2 from the developer (Continental Club, October 2026). Median prices paid are AED 870,000 for studios (112 sales), AED 1,319,000 for 1 bedrooms (132 sales) and AED 2,016,000 for 2 bedrooms (6 sales). In September 2026 studios registered at about AED 843,000 to AED 880,000 and 1 bedrooms of about 700 to 790 sq ft at AED 1.32 million to AED 1.51 million. Broker feeds in late September 2026 showed homes available from AED 858,000 to AED 2,601,000.

Aspirz by Danube payment plan

Danube advertises Aspirz on its 1% monthly plan and, for the first time, offered the same plan on office units (Hindustan Times, August 2025). Broker listings show several versions. The most common is 10% on booking, 60% during construction and 30% on handover. A post-handover version takes 10% on booking, 51% during construction, 9% on handover and 30% over 30 months after handover. Other options include 30/40/30 and full payment upfront (Silver Oak Properties, October 2026).

Aspirz by Danube developer and delivery record

Danube says it has completed 16 projects and has 16 more under construction. In July 2026 it said 11 projects would hand over within 12 months, including Elitz, Sportz, Viewz, Oceanz, Fashionz and Oasiz (Gulf News). It has publicised early handovers at Pearlz and Opalz. Danube Sportz, its earlier Dubai Sports City project, is among those due within that period. Aspirz is Danube’s first tower mixing offices with hotel apartments.

What to check before buying at Aspirz by Danube

  1. Whether the unit is a hotel apartment or an office, since the use, service charge and rental rules differ.
  2. Which payment plan version applies, given at least five splits in circulation, and how much falls after handover.
  3. The SPA completion date, against the register date of 31 December 2028.
  4. Progress on the DLD register, not only Danube’s updates. The latest independent figure is 5.08% from July 2026.

Aspirz by Danube location: Dubai Sports City, Dubai

Map shows the area. Check the exact plot in the developer's site plan or the DLD project record. Check any project's DLD status.

Questions buyers also ask

What is the Aspirz by Danube handover date?

Danube gives Q4 2028. The DLD register lists a completion date of 31 December 2028 and recorded the tower 5.08% complete at its inspection of 30 July 2026 (DLD register via Continental Club).

What is the Aspirz by Danube completion date?

31 December 2028 on the DLD register (project 3838). It matches the Q4 2028 date Danube announced at launch in 2025.

What is the Aspirz by Danube price?

Danube lists studio flex apartments and standard offices from AED 850,000, 1 bedrooms from AED 1,125,000, 1 bedroom flex plus from AED 1,350,000, 2 bedroom flex plus from AED 1,750,000 and 3 bedroom flex plus from AED 2,500,000. Median DLD registered prices are AED 870,000 for studios and AED 1,319,000 for 1 bedrooms.

What is the Aspirz by Danube payment plan?

Danube advertises its 1% monthly plan. Broker listings show 10% on booking, 60% during construction and 30% on handover, and a post-handover version with 10% on booking, 51% during construction, 9% on handover and 30% over 30 months after handover.

Is Aspirz residential or commercial?

Both. Danube's launch announcement described 266 office units on floors 2 to 15 and 432 hotel apartments on floors 17 to 40, in one tower on a 37,000 sq ft plot.

Sources

  1. DLD project register via Continental Club, Aspirz by Danube (opens in a new tab)continentalclub.ae · inspection 30 Jul 2026, register updated 1 Oct 2026
  2. Danube Properties, Aspirz construction progress (opens in a new tab)danubeproperties.com · inspection dated 30 Sep 2026
  3. Danube Properties, Aspirz portfolio page (opens in a new tab)danubeproperties.com · accessed 11 Oct 2026
  4. Danube Aspirz sales site, prices (opens in a new tab)danubeaspirz.com · accessed 11 Oct 2026
  5. Silver Oak Properties, Aspirz payment plans (opens in a new tab)silveroakglobal.com · accessed 11 Oct 2026
Request a Unit Review