How this page was made: figures from the DLD project register and the developer and portal pages listed under Sources, as at 28 October 2026. Text drafted with AI assistance from those sources. Every figure matched the fact records at the build on 12 November 2026. Not yet reviewed line by line by a person. How facts are checked

Short answer

DAMAC Islands, launched in December 2024, is scheduled for handover in Q4 2028, per Property Finder listings. A few later phases inside it, such as Seychelles and Bali Phase 4, carry a later Q2 2029 date. DAMAC Islands 2, launched on 13 November 2025, is due in Q2 2030. The Dubai Land Department's project register lists the DAMAC Islands clusters as under construction, with no units handed over yet (DLD register via Continental Club; PropertyIndex, accessed 28 Sep 2026).

DAMAC Islands (phase 1), handover

Q4 2028

Property Finder, accessed 28 Sep 2026

Later phases in Islands 1 (Seychelles, Bali Phase 4)

Q2 2029

Property Finder, accessed 28 Sep 2026

DAMAC Islands 2, handover

Q2 2030

DAMAC Properties, accessed 28 Sep 2026

Units handed over so far

None recorded

DLD project register lists it under construction, via Continental Club

Phase 1: DAMAC Islands

DAMAC Islands launched in December 2024, with 4 bedroom townhouses from about AED 2.0 million and 6 bedroom villas from about AED 6.0 million. Property Finder lists the main project’s handover as Q4 2028, matching the date given on individual listings for its original clusters, Maldives, Bora Bora, Hawaii and the early Fiji and Bali releases.

Some phases sold later inside DAMAC Islands carry a later date. Property Finder lists Seychelles and Bali Phase 4 with a Q2 2029 handover date, a year after the main project.

Phase or cluster Handover Source
DAMAC Islands (main listing) Q4 2028 Property Finder, accessed 28 Sep 2026
Bora Bora Phase 2, Bali Phase 2, Fiji Q4 2028 Property Finder, accessed 28 Sep 2026
Seychelles, Bali Phase 4 Q2 2029 Property Finder, accessed 28 Sep 2026

DAMAC Islands Maldives handover date by building

Maldives, one of the six original clusters, is registered with the Dubai Land Department (DLD) as five separate projects, listed as “Damac Islands - Maldives 1” to “Maldives 5”. All five carry a registered completion date of 31 December 2028, in line with the Q4 2028 date for phase 1. Together they hold 1,569 registered units.

Building Construction progress (DLD, date) Registered completion date Units (DLD)
Maldives 1 6.59% (12 Oct 2026) 31 Dec 2028 397
Maldives 2 14.12% (16 Jul 2026) 31 Dec 2028 380
Maldives 3 12.09% (15 Jul 2026) 31 Dec 2028 313
Maldives 4 2.86% (1 May 2026) 31 Dec 2028 324
Maldives 5 2.61% (1 May 2026) 31 Dec 2028 155

Source: DLD project register via Continental Club, register as at 4 to 5 October 2026, with Maldives 1 as at its 12 October 2026 inspection. Maldives 2 and 3 were registered as starting on 23 March 2025 and moved fastest in 2026, gaining 8.92 and 6.94 percentage points between their March and July inspections. Maldives 4 and 5 were below 3% at their May 2026 inspections, and Maldives 1 reached 6.59% on 12 October 2026, up from 3.21% on 4 May 2026. The progress of these three over 2027 is the main test of the shared December 2028 date.

Phase 2: DAMAC Islands 2

DAMAC described DAMAC Islands 2 as a new phase of the same master community, launched on 13 November 2025 at prices from AED 2.7 million. DAMAC’s own project guide gives its handover as Q2 2030, about 18 months after the Q4 2028 date for phase 1.

Has any unit at DAMAC Islands actually been handed over?

No. The Dubai Land Department’s project register, via PropertyIndex and Continental Club, lists the DAMAC Islands clusters as under construction and states the project has not handed over. DAMAC’s own construction and handover updates through 2026, including its 4 September 2026 release on 50,000 homes delivered, name DAMAC Hills, DAMAC Hills 2, DAMAC Lagoons, Chic Tower and Elegance Tower as the projects handing over units this year. DAMAC Islands is not among them.

DAMAC Islands: construction pace and DAMAC's delivery record

Figures from DLD inspections in the fact record for DAMAC Islands. Finish dates below are our calculation at the pace recorded so far: arithmetic on the inspection figures, not a forecast and not the developer's view. How it is worked out.

Conclusion: Of the 14 buildings or phases with a DLD reading, 13 are under 15% built, too early to work out a finish date from the pace; and 1 has no two DLD readings within the last 12 months, so no pace can be worked out yet.

Building or phaseLast DLD readingPace (points a month)Registered completionAt the pace recorded so far
DAMAC Islands Bali 17.01% (12 Oct 2026)0.831 Dec 2028too early (7.01% built)
DAMAC Islands Bali 32.76% (4 May 2026)0.230 Jun 2029too early (2.76% built)
DAMAC Islands Bali 42.11% (4 May 2026)0.230 Jun 2029too early (2.11% built)
DAMAC Islands Bora Bora 16.77% (12 Oct 2026)0.931 Dec 2028too early (6.77% built)
DAMAC Islands Bora Bora 34.23% (12 Oct 2026)0.331 Dec 2028too early (4.23% built)
DAMAC Islands Bora Bora 42.11% (4 May 2026)0.231 Dec 2028too early (2.11% built)
DAMAC Islands Fiji 11.74% (1 May 2026)0.231 Dec 2028too early (1.74% built)
DAMAC Islands Maldives 16.59% (12 Oct 2026)0.631 Dec 2028too early (6.59% built)
DAMAC Islands Maldives 214.12% (16 Jul 2026)2.231 Dec 2028too early (14.12% built)
DAMAC Islands Maldives 312.09% (15 Jul 2026)1.731 Dec 2028too early (12.09% built)
DAMAC Islands Maldives 42.86% (1 May 2026)0.231 Dec 2028too early (2.86% built)
DAMAC Islands Maldives 52.61% (1 May 2026)0.231 Dec 2028too early (2.61% built)
DAMAC Islands Seychelles 12.49% (1 May 2026)0.230 Jun 2029too early (2.49% built)
DAMAC Islands The Tropics 1, 3 & 50% (4 Feb 2026)one reading31 Dec 2030needs 1.7 a month

DAMAC delivery record from DLD data

14 of the 86 DAMAC projects we track from DLD data (16%) had passed their registered completion date unfinished, by a median of 13 months, against 177 of 1,294 projects (14%) across all developers. Data as at 22 October 2026. All developers compared.

Register changes we recorded

No change to the registered completion date of any building since 13 October 2026, the earliest date in our records.

Register change log · Handover calendar

Questions buyers also ask

Has DAMAC Islands been handed over yet?

No. The Dubai Land Department's project register lists the DAMAC Islands clusters as under construction, and DAMAC's own 2026 handover announcements name DAMAC Hills, DAMAC Hills 2, DAMAC Lagoons, Chic Tower and Elegance Tower as delivering units this year, not DAMAC Islands (DAMAC, 4 Sep 2026; PropertyIndex, accessed 28 Sep 2026).

When did DAMAC Islands and DAMAC Islands 2 launch?

DAMAC Islands launched in December 2024. DAMAC Islands 2 launched on 13 November 2025, described by DAMAC as one year after the first phase's debut.

What clusters make up DAMAC Islands?

Phase 1 has six, Maldives, Bora Bora, Seychelles, Hawaii, Fiji and Bali. DAMAC Islands 2 has eight, Bahamas, Bermuda, Cuba, Tahiti, Barbados, Maui, Antigua and Mauritius (DLD project register, via PropertyIndex, accessed 28 Sep 2026).

When will DAMAC Islands Maldives be handed over?

All five Maldives clusters have a registered completion date of 31 December 2028 on the DLD register. Maldives 2 was the most advanced at 14.12% on 16 July 2026, and Maldives 5 the least at 2.61% on 1 May 2026 (DLD register via Continental Club).

Do all DAMAC Islands phases hand over on the same date?

No. Property Finder lists Q4 2028 for the original clusters and Q2 2029 for later launches inside phase 1, such as Seychelles and Bali Phase 4 (accessed 28 Sep 2026).

How many homes has DAMAC handed over overall in 2026?

DAMAC reports 50,000 homes delivered to date, with more than 55,000 in its pipeline and 8,800 plus units targeted for handover in 2026 across its active projects (DAMAC, 4 Sep 2026).

Sources

  1. Property Finder, DAMAC Islands Phase 2 (opens in a new tab)propertyfinder.ae · accessed 28 Sep 2026
  2. DLD project register via Continental Club, Damac Islands - Maldives 2 (project 3437) (opens in a new tab)continentalclub.ae · inspection 16 Jul 2026, register as at 4 Oct 2026
  3. DLD project register via Continental Club, Damac Islands - Maldives 3 (project 3438) (opens in a new tab)continentalclub.ae · inspection 15 Jul 2026, register as at 5 Oct 2026
Request a Unit Review