
When is the Vista by Vision handover date?
Short answer
Vista by Vision has a registered completion date of 1 September 2027, matching the Q3 2027 handover shown by the developer and Property Finder. The last DLD inspection, on 14 May 2026, recorded the building 3.38% complete. With almost all the work still to do and no newer inspection published by 8 October 2026, the date in each buyer's SPA and the next DLD figure are the ones to watch.
Registered completion date (DLD)
1 Sep 2027
DLD register via Continental Club
Latest construction progress
3.38%
DLD inspection, 14 May 2026
Developer's stated date
Q3 2027
Developer supplied, via Continental Club
Portal date
1 Sep 2027
Property Finder, accessed 11 Oct 2026
Vista by Vision handover date: the latest position
Vista by Vision is registered with the Dubai Land Department (DLD) for completion on 1 September 2027. Property Finder shows the same date with a Q3 2027 delivery, and Continental Club records Q3 2027 as the developer’s date. Full project details are on the Vista by Vision page.
The building was 3.38% complete at the DLD inspection on 14 May 2026. That was the latest figure when the register was updated on 8 October 2026, so the public record says little yet about how fast the tower is rising.
Vista by Vision handover date by building
Vista by Vision is a single building with a basement, ground floor, 14 residential floors and a roof, registered as DLD project 4175 under the name Vista By Vision.
| Building | Construction progress (DLD, date) | Registered completion date | Developer or portal date |
|---|---|---|---|
| Vista by Vision (B+G+14+R, 328 units) | 3.38% (14 May 2026) | 1 Sep 2027 | Q3 2027 (developer); 1 Sep 2027 (Property Finder) |
How the Vista by Vision handover date has changed
| Date | What happened | Source |
|---|---|---|
| 28 Oct 2025 | Vision announces Vista as its next project, B+G+14+R with 321 homes | Vision Developments |
| 28 Oct 2025 | First DLD inspection, 0% | DLD register via Dubai Data |
| 18 Nov 2025 | Registered with the DLD | DLD register via Dubai Data |
| Dec 2025 | Vision says the building sold out in seven hours | Vision Developments |
| 1 Jan 2026 | Registered construction start; Property Finder lists sales from the same day | DLD register; Property Finder |
| 14 May 2026 | 3.38% complete; registered completion 1 Sep 2027 | DLD register via Continental Club |
| 11 Oct 2026 | Property Finder still lists 1 Sep 2027 | Property Finder |
The date has held at Q3 2027, or 1 September 2027, in every source checked. What has not been tested yet is the pace. Continental Club calculates 0.52 percentage points a month from the two inspections so far, and notes that across 1,175 completed Dubai projects the median pace is 2.48 points a month, with a median build of 40 months. The registered schedule gives Vista about 20 months from its January 2026 start.
What the Vista by Vision handover date means for payments
Property Finder lists the plan as 10% down payment, 10% during construction and 80% on handover. OffPlanIndex also shows a 20% down, 80% on handover version. In both, only 20% is paid before completion, so the handover date sets when buyers need the other 80%. For a 1 bedroom at the registered median of AED 1.11 million, that is about AED 888,000. If the date moves, that payment moves with it.
What to check before relying on the Vista by Vision date
- The anticipated completion date in the SPA, and whether it says 1 September 2027 or a quarter, plus the grace period allowed after it.
- The next DLD inspection. A figure well above 3.38% would show the superstructure under way.
- A mortgage pre-approval timed to the handover date, since 80% falls due then and the bank will value the finished unit.
Questions buyers also ask
When will Vista by Vision be completed?
The DLD register gives 1 September 2027. Property Finder lists the same date, and Continental Club records Q3 2027 as the developer's date.
Has the Vista by Vision handover date been delayed?
No change has been recorded. The registered completion date of 1 September 2027 matches the Q3 2027 date shown since sales began, and Vision Developments has not announced a new one.
How far along is Vista by Vision?
3.38% at the DLD inspection on 14 May 2026, up from 0% on 28 October 2025 (Dubai Data). No later inspection had been published when the register was updated on 8 October 2026.
Is Vista by Vision on track for September 2027?
Too early to tell. Only two inspections have been recorded, and the building would need to go from 3.38% to 100% in about 15 and a half months. Continental Club puts the pace so far at 0.52 percentage points a month.
