# Wadi Hills

URL: https://www.dxbrealtor.ai/projects/wadi-hills/
Developer: HRE Development
Area: Dubailand Residence Complex (DLRC)
Home types: Furnished studios, 1, 2 and 3 bedroom apartments
Updated: 2026-10-11

Wadi Hills by HRE Development in Dubailand Residence Complex: DLD completion date 31 January 2028, 7.72% built in September 2026, prices from AED 659,000 and a 70/30 plan.

## Key facts

- Registered completion date: 31 Jan 2028 (DLD register via Continental Club, updated 7 Oct 2026)
- Construction progress: 7.72% (DLD inspection, 14 Sep 2026)
- Units: 131 (DLD register; Property Finder says 140)
- Median studio sale price: AED 726,000 (22 DLD sales, via Continental Club, to 6 Oct 2026)

## When will Wadi Hills be handed over?

The Dubai Land Department (DLD) project register gives Wadi Hills, DLD project 4100, a registered completion date of 31 January 2028. HRE Development gives Q1 2028, and Property Finder lists January 2028. The two dates agree.

The building is at an early stage. A DLD inspection on 14 September 2026 recorded 7.72% progress (Continental Club, registry updated 7 October 2026). To reach 100% by 31 January 2028, the building needs to add about 92 points in the 16 and a half months after that inspection, or roughly 5.6 points a month.

Building-by-building dates and how the date has changed: [Wadi Hills handover date](/answers/wadi-hills-handover-date/).

## Wadi Hills construction update

Four DLD inspections are on record. The first, on 22 September 2025, recorded 0%. Progress was 0.04% on 24 February 2026, 2.61% on 4 June 2026 and 7.72% on 14 September 2026. The last three months added 5.11 points, the fastest stretch so far. Continental Club gives the registered construction start as 1 November 2025, while Property Finder shows 21 September 2025. Sharjah Islamic Bank holds the escrow account.

## Wadi Hills homes and sizes

Wadi Hills is one building of basement, ground floor and 11 upper floors on Al Ain Road, in the Wadi Al Safa 5 part of Dubailand Residence Complex. The DLD register lists 131 units; Property Finder and Binayah describe 140 furnished homes.

| Home type | Size |
|---|---|
| Studio | 372 to 418 sq ft |
| 1 bedroom | 667 to 734 sq ft |
| 2 bedroom | 1,093 sq ft |
| 3 bedroom | 1,423 to 1,477 sq ft |

Sizes are from DLD data on Continental Club. Property Finder lists studios of 368 to 419 sq ft, 1 bedrooms of 672 to 734 sq ft and 3 bedrooms of 1,436 to 1,487 sq ft, without a 2 bedroom row.

## Wadi Hills prices and resale

Continental Club and Binayah give launch prices from about AED 659,000. Property Finder shows a launch price of AED 712,000 in its header and AED 659,000 in its FAQ. HRE Development's launch release said prices were 25% to 35% below Meydan, Nad Al Sheba and Arabian Ranches, without naming a figure (Zawya).

The DLD register records 61 sales, about 3% of them resales (Continental Club, transactions to 6 October 2026). Medians are AED 726,000 for studios across 22 sales, AED 1,064,280 for 1 bedrooms across 17 sales and AED 1,595,000 for 3 bedrooms across 20 sales. The overall median is AED 16,644 per sq m, about AED 1,546 per sq ft, with studios the highest per sq ft.

## Wadi Hills payment plan

Property Finder and Binayah list a 70/30 plan: 10% down payment, 50% during construction, 10% on handover and 30% after handover. Neither source gives the number or timing of the post-handover instalments. On a studio at the median price of AED 726,000, the handover payment is about AED 72,600 and the post-handover balance about AED 217,800.

## Wadi Hills developer and delivery record

HRE Development was founded in 2021 and is backed by a construction group with more than 20 years of work, according to its launch release (Zawya). Property Finder lists the project under Hijazi Real Estate, and the DLD register names the developer as Wadi Hills City Real Estate Development. No completed project from HRE Development appears on the DLD-based sources used here, so the company has no handover record yet.

## What to check before buying at Wadi Hills

1. **The progress at the next DLD inspection.** The building needs about 5.6 points a month to meet 31 January 2028, against 1.5 points a month from June to September 2026.
2. **The post-handover schedule** for the final 30%, which the published plan does not break down.
3. **The unit count and layout in the SPA**, as the DLD register says 131 units and portals say 140.

## Sources

- Continental Club, Wadi Hills (DLD registry and transactions), registry updated 7 Oct 2026: https://continentalclub.ae/project/wadi-hills-by-hre-dubailand-residence-complex/
- Continental Club, Dubai projects handing over in 2028 (DLD register), accessed 11 Oct 2026: https://continentalclub.ae/handover-2028/
- Property Finder, Wadi Hills project page, accessed 11 Oct 2026: https://www.propertyfinder.ae/en/new-projects/hijazi-real-estate/wadi-hills
- Binayah, Wadi Hills, modified 11 Jul 2026: https://www.binayah.com/dubai-projects/wadi-hills/
- Zawya, HRE Development launches Wadi Hills in Dubailand, accessed 11 Oct 2026: https://www.zawya.com/en/press-release/companies-news/hre-development-launches-wadi-hills-in-dubailand-kjvgospe