HVM Living's 68 unit building in Dubai South passed its registered completion date of 30 September 2026 at 15.62% built. Handover and completion date, prices, sizes and payment plans.

## Key facts

- Registered completion date: 30 Sep 2026 (passed) (DLD project register via Continental Club)
- Construction progress: 15.62% (DLD inspection, 6 Jul 2026)
- Units: 68 (DLD register: 6 studios, 26 one bedroom, 36 two bedroom)
- Listed handover: Q1 to Q2 2027 (JRE, Palmera, Ezre, accessed 11 Oct 2026)

## When will VOI Residence by HVM Living be handed over?

The Dubai Land Department (DLD) project register, where the building is listed as "Voi Residence By Hvm Living", gave a registered completion date of 30 September 2026. That date has passed. The last DLD inspection, on 6 July 2026, recorded the building 15.62% complete, so most of the work was still ahead when the date arrived.

No revised date had been registered by 11 October 2026. Listings have moved on their own: Propsearch shows Q4 2026, JRE and Palmera Q1 2027, Ezre Q2 2027 and DubaiHaus 30 June 2027. None of these is a date filed by HVM Living with DLD.

Building-by-building dates and how the date has changed: [VOI Residence handover date](/answers/voi-residence-by-hvm-living-handover-date/).

## VOI Residence by HVM Living construction update

The register dates the construction start to 1 October 2024, and the first DLD inspection, on 20 August 2024, recorded 0% (Dubai Handover). Progress rose by 5.75 points between the inspections of 15 January 2026 and 6 July 2026, to 15.62% (Continental Club, register updated 25 September 2026). That pace is a little under one point a month.

Propsearch names Shine Square Building Contracting as main contractor and Al Gafry Consulting Architects Engineers as architect. The developer's filed estimate of the build cost is AED 21 million. The register lists one building of ground, six floors and a roof, under DLD project number 3234.

## VOI Residence by HVM Living homes and sizes

| Home type | Units (DLD) | Sizes in registered sales |
|---|---|---|
| Studio | 6 | About 295 sq ft |
| 1 bedroom | 26 | 696 to 811 sq ft |
| 2 bedroom | 36 | 795 to 1,178 sq ft |

Unit counts are from the DLD register via Dubai Handover. Sizes are from registered sales listed by Mitchells. Propsearch estimates 66 units and JRE lists 33 apartments on sale, so unit counts vary between sources; the register's 68 is the filed figure.

## VOI Residence by HVM Living prices and resale

Broker listings start from about AED 820,000 (JRE; DubaiHaus). Palmera lists 1 bedrooms from AED 933,087.

DLD recorded 28 sales between 27 May 2025 and 17 September 2026, all from the developer, at a median of AED 12,163 per square metre, about AED 1,130 per sq ft (Continental Club; Mitchells). Studios of 295 sq ft registered at AED 324,928 in June 2025. 1 bedrooms ranged from AED 735,060 for 715 sq ft to AED 932,351 for 811 sq ft, and 2 bedrooms from AED 940,416 for 795 sq ft to AED 1,513,532 for 1,166 sq ft. The latest sales, on 17 September 2026, were a 1,004 sq ft 2 bedroom at AED 1,120,536 and a 1,174 sq ft 2 bedroom at AED 1,300,000.

## VOI Residence by HVM Living payment plan

The plan listed most often (Alnair; Palmera; JRE) is:

- 20% on booking
- 25% during construction
- 7% on handover
- 48% over two or three years after handover

A second plan is 20% on booking, 32% during construction and 48% on handover. Continental Club shows 10/50/40 and Ezre shows 20/20/60, so the plan in each SPA needs checking.

## VOI Residence by HVM Living developer and delivery record

The register lists HVM Living Real Estate Development as the developer. Its VOI Residence page went live in October 2024, the same month as the registered construction start, and gives an office address on Sheikh Zayed Road. No other HVM Living project, completed or under way, is named in the sources reviewed. The building has passed its first registered date with under a fifth of the work done.

## What to check before buying at VOI Residence by HVM Living

1. **The completion date and grace period in the SPA**, now that the registered 30 September 2026 date has passed.
2. **A written revised date from HVM Living**, since listings range from Q4 2026 to June 2027 and none is filed with DLD.
3. **The post-handover instalments**, as 48% of the price may fall due over the two or three years after a handover that has already slipped.
4. **The next DLD inspection**, the first since July 2026.

## Sources

- DLD project register via Continental Club, Voi Residence By Hvm Living, inspection 6 Jul 2026, register updated 25 Sep 2026: https://continentalclub.ae/project/voi-residence-by-hvm-living-dubai-south-residential-district/
- DLD project register via Continental Club, Dubai handover 2026 tracker, accessed 11 Oct 2026: https://continentalclub.ae/handover-2026/
- Dubai Handover, VOI Residence by HVM Living, accessed 11 Oct 2026: https://dubaihandover.com/projects/3234-voi-residence-by-hvm-living
- Mitchells, VOI Residence by HVM Living DLD registry and registered sales, register as at 4 Oct 2026: https://www.mitchellscommercialrealty.com/off-plan/voi-residence-by-hvm-living
- Propsearch, VOI Residence, updated 13 Apr 2026: https://propsearch.ae/dubai/voi-residence
- HVM Living, VOI Residence project page, 10 Oct 2024: https://hvmliving.com/voi-residence-by-hvm-living/
- JRE Dubai, VOI Residence, accessed 11 Oct 2026: https://jre.ae/projects/voi-residence
- Palmera, VOI Residence by HVM Living, accessed 11 Oct 2026: https://www.palmera.realestate/property/voi-residence-by-hvm-living/
- Alnair, Voi Residence, accessed 11 Oct 2026: https://alnair.ae/en/dubai/project/voi-residence
- Ezre, VOI Residence, accessed 11 Oct 2026: https://ezre.ae/projects/voi-residence
- DubaiHaus, VOI Residence, accessed 11 Oct 2026: https://www.dubaihaus.com/en/project-details/voi-residence-2429