# Tria by Deyaar

URL: https://www.dxbrealtor.ai/projects/tria-by-deyaar/
Developer: Deyaar
Area: Dubai Silicon Oasis
Home types: Studios, 1 to 3 bedroom apartments, duplexes, penthouses and townhouses
Updated: 2026-09-28

A 32-storey tower in Dubai Silicon Oasis. Originally due in 2025, Deyaar's own construction update now targets September 2026.

## Key facts

- Original completion target: 2025 (Deyaar, Mar 2023)
- Current completion target: September 2026 (Deyaar construction update, accessed Sep 2026)
- Launch price, studio: From AED 517K (Propsearch)
- Recent transaction range: AED 615K to 1.65M (Aug to Sep 2026 transactions, Propsearch)

## When will Tria by Deyaar be completed?

Tria's completion date has moved since it was first announced.

| Source | Published date | When published |
|---|---|---|
| Deyaar, Tria project update | 2025 | 7 Mar 2023 |
| Property Finder | June 2025 | Listing, checked Sep 2026 |
| Propsearch | April 2025 (estimate) | Updated 27 Aug 2026 |
| Deyaar, construction update page | September 2026 | Accessed Sep 2026 |

Deyaar's own construction update, its most current source, describes the tower as being in final architectural finishes, testing and commissioning, with systematic snagging and de-snagging well advanced. That points to a project close to completion as of September 2026, more than a year after the original 2025 target.

## What is the Tria by Deyaar payment plan?

Property Finder lists the plan as 14% at sales launch, 35% during construction, 11% on handover and the remaining 40% after handover.

**Worked example**, using the studio launch price of AED 517,000:

| Stage | Amount |
|---|---|
| 14% at launch | AED 72,380 |
| 4% DLD registration fee (paid at booking) | AED 20,680 |
| Total due at launch | AED 93,060 |
| 35% during construction | AED 180,950 |
| 11% on handover | AED 56,870 |
| 40% post-handover | AED 206,800 |

This example uses the studio's published launch price and plan. It is not a quote for a specific unit, and units bought later or on resale may carry different terms.

## What do homes at Tria cost?

Studios launched from AED 517,000 to AED 538,314, one-bedroom units from AED 823,000, and two-bedroom units from about AED 1.2 million. Transactions recorded between August and September 2026 ranged from AED 615,000 to AED 1.65 million depending on unit type and size, reflecting resale activity rather than new launch pricing.

## Who is the developer and what is its handover record?

Deyaar holds RERA licence 530360 and runs a small active portfolio, currently 5 projects on the Dubai Land Department portal. One third-party analysis found 96.4% of Deyaar's contracted units delivered on or before the DLD-registered handover date across its portfolio, with average delays of 9 days and no contract cancellations. That is a portfolio-wide figure, not a statement about Tria specifically, and Tria's own completion date has already moved from 2025 to September 2026.

## What to check before booking or buying resale

1. **The current completion date directly with Deyaar**, since the developer's own published target has moved by more than a year.
2. **The construction stage**, via Deyaar's construction update page, which as of the latest check describes finishing and snagging works rather than a completed building.
3. **The DLD project status** for the specific building, through the Dubai Land Department's project status enquiry service.
4. **The payment plan terms on your contract**, particularly the post-handover portion, which makes up 40% of the price under the published plan.
5. **Recent transaction prices** if buying resale, since Propsearch recorded active trading as late as September 2026.

## Sources

- Deyaar, Tria project update, 7 Mar 2023: https://www.deyaar.ae/en/tria-project-update/
- Deyaar, construction updates of Deyaar projects in Dubai, accessed 28 Sep 2026: https://www.deyaar.ae/en/construction-update/
- Property Finder, Tria by Deyaar, accessed 28 Sep 2026: https://www.propertyfinder.ae/en/new-projects/deyaar-leasing/tria-by-deyaar
- Propsearch, Tria by Deyaar, 27 Aug 2026: https://propsearch.ae/dubai/tria-by-deyaar
- Oliva, Deyaar developer track record and completion history, accessed 28 Sep 2026: https://joinoliva.com/en/learn/blog/deyaar-developer-track-record-and-completion-history
- DLD, real estate project status enquiry, accessed 28 Sep 2026: https://backoffice.dubailand.gov.ae/en/eservices/real-estate-project-status-landing/real-estate-project-status