# Mr. C Residences Downtown

URL: https://www.dxbrealtor.ai/projects/mr-c-residences-downtown/
Developer: ALTA Real Estate Development
Area: City Walk, Al Wasl
Home types: 2, 3 and 4 bedroom apartments
Updated: 2026-10-11

Mr. C Residences Downtown has a registered completion date of 27 January 2027 and was 73.23% built in August 2026. Prices, sizes and the 40/60 plan.

## Key facts

- Registered completion date: 27 Jan 2027 (DLD project register via Continental Club)
- Construction progress: 73.23% (DLD inspection, 4 Aug 2026)
- Units: 169 (DLD register)
- Median registered price: AED 3,941 per sq ft (DLD sales via Crown Key, accessed 11 Oct 2026)

## When will Mr. C Residences Downtown be handed over?

The Dubai Land Department (DLD) register gives Mr. C Residences Downtown a registered completion date of 27 January 2027. Portals list Q1 2027. The payment schedule on the project's sales site had set the final payment at completion in December 2026, so the registered date is about one month later than that. Data Habibi also records the original promise as Q4 2026.

The DLD inspection of 4 August 2026 recorded the tower 73.23% complete. That leaves about 27% of the work for the five and a half months to the registered date.

Building-by-building dates and how the date has changed: [Mr. C Residences Downtown handover date](/answers/mr-c-residences-downtown-handover-date/).

## Mr. C Residences Downtown construction update

- Construction start on the register: September 2021.
- First DLD sales: January 2023 (Keyva).
- DLD inspection, 4 August 2026: 73.23%.
- Registered completion date: 27 January 2027.

The DLD project description, as quoted by Crown Key, is a basement, ground floor, mezzanine, seven podium levels, three service floors, three mechanical floors, 56 floors, a roof and an upper roof. Overit lists 71 floors. Some portals still showed an older DLD figure of 50.1% in October 2026.

## Mr. C Residences Downtown homes and sizes

The register lists 169 apartments. ALTA sells two collections: the Signature Collection of 2 and 3 bedrooms, and the Nobile Collection of 4 bedrooms (JRE).

| Home type | Size |
|---|---|
| 2 bedroom | 2,225 to 2,387 sq ft |
| 3 bedroom | 3,017 to 3,211 sq ft |
| 4 bedroom | Up to about 5,277 sq ft |

2 and 3 bedroom sizes are from DLD sales in 2026 (Data Habibi; Overit) and the JRE listing. The 4 bedroom figure is the top of JRE's range.

## Mr. C Residences Downtown prices and resale

Apartments start from about AED 8.1 million (Offplan Properties; Proprain). Crown Key puts the median registered price at about AED 3,941 per sq ft.

Recent DLD sales:

- 16 September 2026: 3 bedroom, 3,026 sq ft, AED 11,969,903.
- 26 August 2026: 3 bedroom, 3,157 sq ft, AED 12,049,142.
- 22 July 2026: 3 bedroom, 3,211 sq ft, AED 15,182,627.
- 13 May 2026: 2 bedroom, 2,322 sq ft, AED 8,742,842.

2 bedroom sales between March and May 2026 ranged from about AED 8.1 million to AED 10.8 million (Data Habibi; Overit).

## Mr. C Residences Downtown payment plan

The sales site lists a 40/60 plan tied to construction:

- 5% at reservation.
- 15% plus the 4% DLD fee at SPA signing.
- 10% at 60% construction, scheduled for December 2025.
- 10% at 80% construction, scheduled for June 2026.
- 60% at completion, scheduled for December 2026.

At 73.23% in August 2026, the 80% stage had not been reached on the DLD record, two months after its scheduled date. On a 2 bedroom at AED 8.1 million, the completion payment is about AED 4.86 million.

## Mr. C Residences Downtown developer and delivery record

ALTA Real Estate Development builds the Mr. C brand in Dubai with the Cipriani family. Its first, Mr. C Residences Jumeirah on the Dubai Canal, was announced complete on 21 November 2023 (Gulf Construction Online). Mr. C Residences Downtown is its second Mr. C tower. ALTA's project page lists a launch date of 30 January 2025, although DLD sales began in January 2023.

## What to check before buying at Mr. C Residences Downtown

1. **The completion date in the SPA.** Early buyers' schedules point to December 2026, the register to 27 January 2027.
2. **Which construction instalments have been called.** The 80% stage payment depends on DLD-certified progress.
3. **The 60% completion payment.** It is the largest sum and is due at completion, likely early 2027.
4. **The unit's size against recent sales.** Registered prices ranged from about AED 3,500 to AED 4,700 per sq ft in 2026.

## Sources

- DLD project register via Continental Club, inspection 4 Aug 2026, inspection 4 Aug 2026: https://continentalclub.ae/handover-2027/
- ALTA Real Estate Development, Mr. C Residences Downtown, accessed 11 Oct 2026: https://altadevelopment.ae/project/mr-c-residences-downtown/
- Mr. C Downtown Dubai sales site, payment plan, accessed 11 Oct 2026: https://www.mrcdowntowndubai.com/
- Crown Key, Mr.C Residences Downtown (DLD project 2476), accessed 11 Oct 2026: https://crownkey.ae/off-plan/mr-c-residences-downtown/
- Data Habibi, Mr. C Residences Downtown, accessed 11 Oct 2026: https://datahabibi.ae/dubai/new-projects/mr-c-residences-downtown
- Overit, Mr.C Residences Downtown (DLD record and sales), accessed 11 Oct 2026: https://overit.ae/project/mr-c-residences-downtown
- Keyva, Mr.C Residences Downtown, accessed 11 Oct 2026: https://www.keyva.ae/dubai/projects/mr-c-residences-downtown
- JRE, Mr. C Residences Downtown, accessed 11 Oct 2026: https://jre.ae/projects/mr-c-residences-downtown
- Offplan Properties, Mr C Residences Downtown, accessed 11 Oct 2026: https://offplan-properties.com/project/alta-real-estate-development/mr-c-residences-downtown
- Proprain, Mr. C Residences Downtown, accessed 11 Oct 2026: https://www.proprain.com/projects/mr-c-residences-downtown-dubai/
- Gulf Construction Online, Alta completes Mr. C Residences Jumeirah, 21 Nov 2023: https://gulfconstructiononline.com/ArticleTA/415965