MAG 777 in Dubai Sports City: its registered completion date of 15 January 2026 has passed with the tower 67.37% built. Prices, sizes and payment plan.

## Key facts

- Registered completion date: 15 Jan 2026 (passed) (DLD project register via Continental Club)
- Construction progress: 67.37% (DLD inspection, 30 Jul 2026)
- Units: 266 (114 studios, 133 one bedroom, 19 two bedroom (DLD))
- Median studio price: AED 786,780 (85 DLD sales, via Continental Club, Oct 2026)

## When will MAG 777 be handed over?

MAG 777 has passed its registered completion date. The DLD project register holds 15 January 2026, and a DLD inspection on 30 July 2026 recorded the tower 67.37% complete, up from 58.74% on 2 April 2026 (DLD register via Continental Club, updated 5 October 2026). Portals including Dubainary now list Q3 2026, but MAG has not published a revised date and the register has not been updated.

At the pace recorded between April and July 2026, about 2.2 points a month, the remaining 33 points would take about 15 months. That points to late 2027 unless the pace picks up for fit-out and finishing.

Building-by-building dates and how the date has changed: [MAG 777 handover date](/answers/mag-handover-date/).

## MAG 777 construction update

The DLD register records project number 3193, registered on 4 October 2024, with a construction start of 1 November 2024. The building is planned as a basement, ground floor, a tech level, 19 typical floors and a roof, with its escrow account at Emirates NBD.

At launch on 8 October 2024, MAG said the tower was already 60% complete (Middle East Construction News). That does not match the DLD record, which showed 58.74% only in April 2026, so the two measures differ.

| Inspection | Progress |
|---|---|
| 2 April 2026 | 58.74% |
| 30 July 2026 | 67.37% |

Source: DLD project register via Continental Club. The April figure is derived from the 8.63 point change Continental Club reports between the two inspections.

## MAG 777 homes and sizes

| Home type | Units (DLD) | Typical size |
|---|---|---|
| Studio | 114 | 456 to 743 sq ft |
| 1 bedroom | 133 | 735 to 965 sq ft |
| 2 bedroom | 19 | 1,387 sq ft |

The DLD register lists 266 units; MAG announced 261 fully fitted units at launch. Sizes are the register's typical ranges via Continental Club.

## MAG 777 prices and resale

Portals list studios from AED 790,000 (Dubainary). DLD registered sales give these medians (Continental Club, transactions to 4 October 2026):

- Studio, about 484 sq ft: AED 786,780 (85 sales)
- 1 bedroom, about 904 sq ft: AED 1,290,000 (45 sales)
- 2 bedroom, about 1,389 sq ft: AED 1,895,000 (13 sales)

Recent registrations include studios at AED 778,560 and AED 813,200 on 21 September 2026, 1 bedrooms at AED 1.2 million and AED 1.26 million on 4 September 2026, and a 2 bedroom at AED 2.02 million on 3 August 2026. Of 144 registered sales since 2024, Continental Club counts one resale.

## MAG 777 payment plan

Sources list different plans, but all put most of the price at handover:

- **Continental Club:** 20% down payment, 10% during construction, 70% on handover
- **fäm Properties:** 20% first instalment, 30% next, 50% on handover
- **dxbpropy:** varies by unit type, from 50% on handover for studios to 70% for 2 bedrooms

With 50% to 70% due on handover, the delay mainly moves the largest payment later.

## MAG 777 developer and delivery record

MAG 777 was launched by MAG Lifestyle Development, part of MAG Group; the DLD register names Dng Property Development as the registered developer. At launch MAG cited completed projects including MAG City in Mohammed Bin Rashid City and MAG 5 Boulevard in Dubai South. MAG 777 itself has missed both the end of 2025 launch target and the 15 January 2026 registered date.

A second MAG entry in the register, Mag 888, is a separate project in Downtown Dubai (DLD project 3542, registered 29 January 2025, planned completion 31 March 2028). Freehold Solutions reports it as listed cancelled in the DLD register.

## What to check before buying at MAG 777

1. **The completion date and grace period in the SPA**, since the registered date passed in January 2026.
2. **The handover instalment.** Confirm whether 50% or 70% is due, and arrange finance for it.
3. **The DLD record for project 3193**, for newer inspections after July 2026 and any revised completion date.
4. **The service charge.** Dubainary lists a published figure of AED 15 per sq ft a year; the first RERA approved budget sets the actual charge.

## Sources

- Continental Club, Mag 777 (DLD project register and transactions), registry updated 5 Oct 2026: https://continentalclub.ae/project/mag-777-sports-city/
- Continental Club, Dubai handover 2026 tracker (DLD register, CC BY 4.0), accessed 11 Oct 2026: https://continentalclub.ae/handover-2026/
- Dubai Data, Mag 777 (DLD register), accessed 11 Oct 2026: https://datadubai.ae/projects/mag-777.md
- Middle East Construction News, MAG launches $95mn MAG 777 tower, 8 Oct 2024: https://meconstructionnews.com/60925/mag-launches-95mn-mag-777-tower
- Khaleej Times, MAG launches Dh350 million tower at Dubai Sports City, Oct 2024: https://www.khaleejtimes.com/business/property/mag-launches-dh350-million-tower-at-dubai-sports-city
- Property Finder, Mag 777 project page, accessed 11 Oct 2026: https://www.propertyfinder.ae/en/new-projects/mag-property-development/mag-777
- fäm Properties, Mag 777, accessed 11 Oct 2026: https://famproperties.com/dubai-sports-city-dubai/mag-777-apartments
- Dubainary, MAG 777, accessed 11 Oct 2026: https://dubainary.com/off-plan/mag-mag-777
- dxbpropy, MAG 777 payment plan, accessed 11 Oct 2026: https://dxbpropy.ai/offplan/mag-777-dubai-sports-city-2495
- Freehold Solutions, Mag 888 (DLD register status), accessed 11 Oct 2026: https://freehold-dxb.com/cancelled-projects/mag-888/