# DAMAC District

URL: https://www.dxbrealtor.ai/projects/damac-district/
Developer: DAMAC Properties
Area: DAMAC Hills
Home types: Studio, 1 and 2 bedroom apartments, plus offices
Updated: 2026-10-11

DAMAC District in DAMAC Hills: handover and completion date, DLD construction progress, studio and 1 bedroom prices, and the 20/40/40 payment plan.

## Key facts

- Construction progress: 4.07% (DLD inspection, 22 Sep 2026)
- DLD registered completion date: 30 Mar 2029 (DLD project register via Continental Club)
- Developer handover: Q3 2029 (Bayut, 20 Oct 2025; Gulf News, Apr 2026)
- Units: 1,139 (DLD register; agents cite 1,008)

## When will DAMAC District be handed over?

DAMAC District is scheduled for handover in Q3 2029. That is the date DAMAC gave when the project was marketed in 2025 (Bayut, 20 October 2025) and repeated with the final release in 2026 (Cresco, 22 July 2026). Dubai Asset lists August 2029.

The Dubai Land Department (DLD) project register, where it appears as "Damac District", holds a registered completion date of 30 March 2029, about two quarters earlier than DAMAC's marketed date. At the latest DLD inspection, on 22 September 2026, the project was 4.07% complete.

Building-by-building dates and how the date has changed: [DAMAC District handover date](/answers/damac-district-handover-date/).

## DAMAC District construction update

The DLD register records construction starting on 14 February 2026. Progress was 0.12% at the inspection on 4 March 2026 and 4.07% on 22 September 2026 (DLD project register via Continental Club). The register lists three buildings under one project, number 4064, with the escrow account at Mashreq Bank.

At 4.07% about two and a half years before the registered date, the project is at an early stage of works.

## DAMAC District homes and sizes

DAMAC District sits inside DAMAC Hills, next to the Trump International Golf Club. Agents describe three towers of up to 32 storeys with no basements: two residential towers and one office tower linked to DAMAC Mall (DNK Real Estate).

| Home type | Units | Typical size |
|---|---|---|
| Studio | 131 | 377 to 446 sq ft |
| 1 bedroom | 817 | 629 to 993 sq ft |
| 2 bedroom | 142 | 1,017 to 1,423 sq ft |
| Offices | 49 | 2,920 to 5,185 sq ft |

Unit counts and sizes are from the DLD register via Continental Club, 1,139 units in all. Agents quote a lower total of 1,008 units, 959 apartments and 49 offices (DNK Real Estate). 1 bedrooms make up about 72% of the project.

## DAMAC District prices and resale

DAMAC's launch guide in September 2025 listed 1 bedrooms from AED 1.1 million, 2 bedrooms from AED 1.7 million and offices from AED 6.1 million. In April 2026 DAMAC released the final 600 apartments, studios and 1 bedrooms, with studios from AED 756,000 and 1 bedrooms from AED 1.1 million (Gulf News, 14 April 2026).

The DLD register shows 681 sales since 2025, all from the developer. Median prices were AED 798,310 for a studio of about 441 sq ft, AED 1,268,000 for a 1 bedroom of about 689 sq ft and AED 2,030,000 for a 2 bedroom of about 1,130 sq ft, an overall median of about AED 1,834 per sq ft (Continental Club, register updated 25 September 2026). Registered sales on 21 September 2026 included 1 bedrooms of about 650 to 735 sq ft at AED 1,162,560 to AED 1,302,000.

## DAMAC District payment plan

Payment terms differ by source and release:

- **Bayut (October 2025):** 20% on booking, 40% during construction, 40% on handover.
- **DAMAC (September 2025):** a monthly option of 20% down, 1% instalments during construction and 40% at the end.
- **Agent listing by tower (OPR):** Tower A 20/40/40; Tower B 50/50, starting with 5% on booking and 10% after one month.

DAMAC said the final release in April 2026 came with "flexible payment plans" but did not publish the terms (Cresco, 22 July 2026). On every version, 40% to 50% of the price falls due at handover.

## DAMAC District developer and delivery record

DAMAC Properties reported 50,000 homes handed over to date, more than 55,000 in its pipeline and more than 8,800 units targeted for handover in 2026 (PR Newswire, 4 September 2026). DAMAC District is one of its newer launches inside DAMAC Hills, an established community where earlier phases are complete.

## What to check before buying at DAMAC District

1. **Which tower the unit is in.** Agents list different payment plans for Tower A and Tower B, and the office tower is a separate building.
2. **The completion date in the SPA.** The DLD register says 30 March 2029, marketing says Q3 2029.
3. **The size of the handover payment.** 40% to 50% of the price is due at handover, more than three years away.
4. **Supply at handover.** More than 800 1 bedrooms are due in the same project around the same time.

## Sources

- DLD project register via Continental Club, Damac District, inspection 22 Sep 2026, register updated 25 Sep 2026: https://continentalclub.ae/project/damac-district-damac-hills/
- DLD project register via Continental Club, Dubai handover 2029 tracker, accessed 11 Oct 2026: https://continentalclub.ae/handover-2029/
- DAMAC Properties, DAMAC District prices and payment plan, 11 Sep 2025: https://www.damacproperties.com/en-us/blog/damac-district-prices-and-payment-plan-2378/
- Gulf News, DAMAC releases final 600 units at DAMAC Hills project after strong demand, 14 Apr 2026: https://gulfnews.com/business/property/damac-releases-final-600-units-at-damac-hills-project-after-strong-demand-1.500506503
- Bayut, DAMAC District building guide, 20 Oct 2025: https://www.bayut.com/buildings/damac-district/
- Cresco Real Estate, DAMAC District final collection, 22 Jul 2026: https://crescorealestate.ae/dubai-new-launches-2026/damac-district-final-collection/
- OPR, DAMAC District payment plans by tower, accessed 11 Oct 2026: https://opr.ae/projects/damac-district-damac-hills-dubai
- DNK Real Estate, DAMAC District, accessed 11 Oct 2026: https://www.dnkre.com/projects/damac-district
- Dubai Asset, DAMAC District, updated 17 Mar 2026: https://dubaiasset.ae/en/projects/damac-district
- PR Newswire, DAMAC achieves handover of 50,000 homes, with 55,000+ in pipeline, 4 Sep 2026: https://www.prnewswire.com/news-releases/damac-achieves-handover-of-50-000-homes-with-55-000-in-pipeline-and-usd-2-72-bn-in-h1-2026-construction-awards-302869272.html
