Binghatti Luxuria in JVT has a registered completion date of 30 July 2027 and was 7.04% built on 17 September 2026. Prices, sizes and the 20/50/30 plan.

## Key facts

- Registered completion date: 30 Jul 2027 (DLD project register via Continental Club; Binghatti says Q3 2027)
- Construction progress: 7.04% (DLD inspection, 17 Sep 2026)
- Units: 469 (213 studios, 195 one bedroom, 49 two bedroom, 12 retail (DLD project record via Dubai Handover))
- Median registered price: AED 1,959 per sq ft (195 DLD sales since 19 Feb 2026, via Dubai Handover, accessed 11 Oct 2026)

## When will Binghatti Luxuria be handed over?

The Dubai Land Department (DLD) register gives Binghatti Luxuria a registered completion date of 30 July 2027. Binghatti's own project page says Q3 2027, and Property Finder lists 30 July 2027, so the published dates agree.

The harder question is pace. The DLD inspection of 17 September 2026 recorded the tower 7.04% complete. The register shows construction starting on 1 January 2026. To finish on 30 July 2027, the remaining 93% of the work would need to be done in about ten months. Dubai Handover, which tracks the DLD record daily, projects a later finish at the pace seen so far.

Building-by-building dates and how the date has changed: [Binghatti Luxuria handover date](/answers/binghatti-luxuria-handover-date/).

## Binghatti Luxuria construction update

Binghatti Luxuria is one tower. Binghatti describes three basement levels, a ground floor, four podium levels, 24 residential floors, a mechanical floor and a roof. The DLD project record lists 33 floors.

- Registered construction start: 1 January 2026.
- First DLD sales: 19 February 2026.
- Latest DLD inspection: 7.04% on 17 September 2026.
- Registered completion date: 30 July 2027.

The register places the plot in Al Barsha South Fifth, the land district that covers JVT.

## Binghatti Luxuria homes and sizes

The DLD project record lists 469 units: 213 studios, 195 one bedroom apartments, 49 two bedroom apartments and 12 retail units. Sizes below come from registered sales.

| Home type | Units (DLD) | Size |
|---|---|---|
| Studio | 213 | 336 to 430 sq ft |
| 1 bedroom | 195 | 651 to 852 sq ft |
| 2 bedroom | 49 | 963 sq ft |
| Retail | 12 | 490 to 770 sq ft |

Sources: DLD project record and sales via Dubai Handover, accessed 11 October 2026.

## Binghatti Luxuria prices and resale

Studios launched from AED 765,999 (Property Finder; Dubai Asset, 17 March 2026). In October 2026 Binghatti listed 1 bedrooms from AED 1,248,999 for 651 sq ft and 2 bedrooms from AED 1,801,999 for 963 sq ft.

Registered prices are higher than the launch figure. Across 195 DLD sales since 19 February 2026, the median is about AED 1,959 per sq ft. By type, the medians are AED 782,499 for studios (AED 2,320 per sq ft), about AED 1.3 million for 1 bedrooms and about AED 1.8 million for 2 bedrooms. On 9 October 2026, a 338 sq ft studio registered at AED 792,999 (Dubai Handover, accessed 11 October 2026). All of these are sales from the developer, not resales, since the tower is not yet built.

## Binghatti Luxuria payment plan

Binghatti sells Luxuria on a 20/50/30 plan:

- 20% on booking.
- 50% during construction.
- 30% on completion.

Excel Properties breaks the construction share into 3% a month for 16 months and a single 2% instalment, with the 30% due at handover in July 2027. On a studio at the median registered price of AED 782,499, the completion payment is about AED 235,000. The 4% DLD registration fee is paid on top.

## Binghatti Luxuria developer and delivery record

Binghatti Developers has handed over towers such as Binghatti Onyx, Ghost and Phoenix. Several of its 2026 projects have run past their published dates, as shown in the [Binghatti handover date tracker](/answers/binghatti-handover-dates/). Luxuria is one of its newer launches, with work registered from January 2026.

## What to check before buying at Binghatti Luxuria

1. **The completion date and grace period in the SPA.** The register date is 30 July 2027, but progress was 7.04% in September 2026.
2. **The instalment schedule.** The 50% construction share is billed monthly on some offers, not by build stage, so most of it falls due whatever the progress.
3. **The next DLD inspection.** A jump from 7% would show whether the July 2027 date is still realistic.
4. **The unit size against the price.** Studios sell at a higher price per sq ft than 1 and 2 bedrooms in registered sales.

## Sources

- DLD project register via Continental Club, inspection 17 Sep 2026, inspection 17 Sep 2026: https://continentalclub.ae/handover-2027/
- Binghatti Developers, Binghatti Luxuria, accessed 11 Oct 2026: https://www.binghatti.com/en/projects/binghatti-luxuria
- Property Finder, Binghatti Luxuria project page, accessed 11 Oct 2026: https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-luxuria
- Dubai Handover, Binghatti Luxuria (DLD project record and sales), accessed 11 Oct 2026: https://dubaihandover.com/projects/4299-binghatti-luxuria
- Dubai Asset, Binghatti Luxuria, 17 Mar 2026: https://dubaiasset.ae/en/projects/binghatti-luxuria
- Excel Properties, Binghatti Luxuria payment plan, accessed 11 Oct 2026: https://excelproperties.ae/offplan/binghatti-luxuria-jvt