# When is the Royal Yacht Club Residence handover date?

URL: https://www.dxbrealtor.ai/answers/royal-yacht-club-residence-handover-date/
Topic: Handover date
Updated: 2026-10-11

## Short answer

The registered completion date for Royal Yacht Club Residence is 10 November 2027 on the Dubai Land Department (DLD) project register, and the developer gives Q4 2027. The last DLD inspection, on 18 June 2026, put construction at 14.69%. At the recorded pace of about 1% a month, the building would not reach 100% by November 2027, so a later date is possible.

## Key figures

- Registered completion date (DLD): 10 Nov 2027 (DLD register via Continental Club, updated 8 Oct 2026)
- Latest construction progress: 14.69% (DLD inspection, 18 Jun 2026)
- Developer's stated date: Q4 2027 (Developer supplied, via Continental Club)
- Portal estimate: 1 Dec 2027 (Property Finder, accessed 11 Oct 2026)

## Royal Yacht Club Residence handover date: the latest position

The Dubai Land Department (DLD) project register gives Royal Yacht Club Residence, the Azimuth Developments project on Dubai Islands, a registered completion date of 10 November 2027. The developer's own date is Q4 2027 (Continental Club), and Property Finder lists 1 December 2027. Full project details are on the [Royal Yacht Club Residence](/projects/royal-yacht-club-residence/) page.

The latest DLD inspection, on 18 June 2026, recorded 14.69% progress. About 85 points of work remained, with just under 17 months to the registered date.

## Royal Yacht Club Residence handover date by building

The DLD register treats the project as one building, project number 3770, with 147 units. Property Finder's description refers to two connected mid-rise blocks on one podium, but no separate dates are published for each block.

| Building | Construction progress (DLD, date) | Registered completion date | Developer or portal date |
|---|---|---|---|
| Royal Yacht Club Residence (147 units) | 14.69% (18 Jun 2026) | 10 Nov 2027 | Q4 2027 (developer, via Continental Club); 1 Dec 2027 (Property Finder) |

## How the Royal Yacht Club Residence handover date has changed

- **10 May 2025:** construction start on the DLD register. Property Finder gives 30 June 2025.
- **8 July 2025:** first DLD inspection, at 3.15%.
- **27 January 2026:** first sale listed on the DLD transaction register, a 2 bedroom at AED 4,013,512. Property Finder shows sales starting on 14 March 2026, so sources differ on the launch date.
- **5 March 2026:** offplan-dubai publishes the project with a 2027 handover.
- **18 June 2026:** DLD inspection at 14.69%.
- **October 2026:** the register shows 10 November 2027 (Continental Club, updated 8 October 2026). fäm Properties shows November 2027 and Property Finder December 2027.

No revision of the date has been published. The issue is pace: Continental Club records about 1.02% a month, while finishing by 10 November 2027 would need roughly 5% a month.

## What the Royal Yacht Club Residence handover date means for payments

offplan-dubai lists a 50/50 plan, with 50% paid during construction and 50% on handover, and says post-handover terms may be offered (page modified 7 July 2026). On that plan, the second half of the price falls due at handover. For a 1 bedroom at Property Finder's AED 2.3 million starting price, that is about AED 1.15 million due on completion. If completion moves past November 2027, that payment moves too.

## What to check before relying on the Royal Yacht Club Residence date

1. **The SPA date against the register.** Property Finder's 1 December 2027 and the register's 10 November 2027 differ, and only the SPA binds the developer.
2. **The grace period.** The SPA sets how far past the contract date the developer can run.
3. **Whether both blocks complete together.** The register shows one date for the whole project.
4. **A DLD inspection after 18 June 2026.** It will show whether the pace has picked up since the first year of work.

## Frequently asked

### What is the Royal Yacht Club Residence completion date?

The DLD register gives 10 November 2027 (Continental Club, registry updated 8 October 2026). fäm Properties also shows November 2027, and Property Finder lists 1 December 2027.

### Is Royal Yacht Club Residence finished?

No. The DLD inspection on 18 June 2026 recorded 14.69% progress, up from 3.15% on 8 July 2025.

### Has the Royal Yacht Club Residence handover date been delayed?

Not on the register so far. The date has been 10 November 2027 on the DLD register and Q4 2027 in the developer's material. The recorded pace of about 1.02% a month is well below what that date requires.

### When will Royal Yacht Club Residences on Dubai Islands be ready?

Royal Yacht Club Residences, as Property Finder spells it, has a registered completion date of 10 November 2027. Units are handed over after completion, in line with each SPA.

## Sources

- Continental Club, Royal Yacht Club Residence (DLD project register), registry updated 8 Oct 2026: https://continentalclub.ae/project/royal-yacht-club-residence-dubai-islands/
- Continental Club, projects due for handover in 2027 (DLD register, CC BY 4.0), updated 10 Oct 2026: https://continentalclub.ae/handover-2027/
- Property Finder, Royal Yacht Club Residences project page, accessed 11 Oct 2026: https://www.propertyfinder.ae/en/new-projects/azimuth-developments/royal-yacht-club-residences
- fäm Properties, Royal Yacht Club Residence completion date, accessed 11 Oct 2026: https://famproperties.com/completion-date/royal-yacht-club-residence
- offplan-dubai, Royal Yacht Club Residence, modified 7 Jul 2026: https://www.offplan-dubai.com/?p=48831
- DLD, real estate project status enquiry: https://backoffice.dubailand.gov.ae/en/eservices/real-estate-project-status-landing/real-estate-project-status
