## Short answer

Oasis Residences Dubai South has a registered completion date of 1 July 2027, while HZ Development's site shows Q1 2027 and Propsearch April 2027. The last Dubai Land Department inspection, on 16 July 2026, recorded 35.25% complete. At the March to July 2026 pace the building would reach 100% around early 2028, so the July 2027 date needs faster progress.

## Key figures

- Registered completion date: 1 Jul 2027 (DLD project register via Continental Club)
- Latest construction progress: 35.25% (DLD inspection, 16 Jul 2026)
- Developer's stated date: Q1 2027 (HZ Development project page, accessed 11 Oct 2026)
- Estimate at recent pace: About early 2028 (Calculation from the March to July 2026 DLD readings, not a developer date)

## Oasis Residences Dubai South handover date: the latest position

Oasis Residences Dubai South is registered with the Dubai Land Department (DLD) for completion on 1 July 2027. At the last DLD inspection, on 16 July 2026, the building was 35.25% complete. Prices, sizes and the payment plan are on the project page: [Oasis Residences Dubai South](/projects/oasis-residences-dubai-south/).

HZ Development's own project page shows Q1 2027, earlier than the register. Between March and July 2026 the building gained about 3.4 points a month. Finishing by 1 July 2027 needs about 5.6 points a month from mid-July 2026. At the recent pace, 100% would come around early 2028, about seven months after the registered date.

## Oasis Residences Dubai South handover date by building

The project is a single five-storey building of 159 apartments (DLD project 3726), registered by Al Helal Al Zahaby Real Estate Development and sold as HZ Development.

| Building | Construction progress (DLD, date) | Registered completion date | Developer or portal date |
|---|---|---|---|
| Oasis Residences Dubai South (159 apartments, G + 4 + roof) | 35.25% (16 Jul 2026) | 1 Jul 2027 | Q1 2027 (HZ Development); Apr 2027 (Propsearch); 31 Mar 2027 (Takween Aldar); Jul 2027 (Property Finder) |

## How the Oasis Residences Dubai South handover date has changed

| Date | Event | Source |
|---|---|---|
| 1 Jul 2025 | Construction starts and bookings open; completion registered for 1 Jul 2027 | DLD via Continental Club; Property Finder |
| 7 Aug 2025 | Project registered with DLD | DLD via dxboffplan |
| 15 Oct 2025 | Public launch with AX Capital as sales agent | Khaleej Times |
| 23 Mar 2026 | DLD inspection: about 22.3% (implied by the later gain) | DLD via Continental Club |
| 13 Apr 2026 | Propsearch estimates handover in April 2027 | Propsearch |
| 16 Jul 2026 | DLD inspection: 35.25% | DLD via Continental Club |
| 21 Sep 2026 | Latest registered sale, a 1 bedroom at AED 777,974 | DLD via Continental Club |

The registered date has not moved. Broker dates have ranged from 31 March 2027 to July 2027. The building went from start to about 22% in under nine months, then gained 13 points in the four months to July 2026.

## What the Oasis Residences Dubai South handover date means for payments

Property Finder lists 10% down, 40% during construction, 10% on handover and 40% after handover, and Continental Club spreads the last 40% over 36 months. Another plan listed by brokers puts 3% on handover and 37% over 33 months (OffPlanIndex). On both, little is due at handover itself. A later completion pushes back the start of the post-handover instalments rather than a single large payment. On a 1 bedroom at the median AED 870,601, the 40% post-handover share is about AED 348,000.

## What to check before relying on the Oasis Residences Dubai South date

1. **The completion date in the SPA**, since dates given to buyers range from 31 March 2027 to 1 July 2027.
2. **When the post-handover instalments start.** The SPA should say whether they run from handover or from a fixed date.
3. **The next DLD inspection.** Keeping to 1 July 2027 implies about 66% by the end of 2026; the March to July pace implies about 54%.
4. **The plan's handover share.** It is 10% on one plan and 3% on another.

## Frequently asked

### Is Oasis Residences Dubai South finished?

No. The DLD inspection of 16 July 2026 recorded the building 35.25% complete. Its registered completion date is 1 July 2027.

### What is the Oasis Residences Dubai South completion date?

1 July 2027 on the DLD register (via Continental Club). Property Finder lists July 2027, Propsearch April 2027 and HZ Development's own page Q1 2027.

### Has the Oasis Residences Dubai South handover date been delayed?

No revised date has been filed. The register has held 1 July 2027 since construction started on 1 July 2025. Earlier broker dates of March or April 2027 are now behind the register date.

### Is Oasis Residences in Dubai South a single building?

Yes. The DLD register lists one building of 159 apartments, with a ground floor and four residential floors.

## Sources

- DLD project register via Continental Club, Oasis Residences Dubai South, inspection 16 Jul 2026; registry updated 5 Oct 2026: https://continentalclub.ae/project/oasis-residences-dubai-south-dubai-south-residential-district/
- DLD project register via Continental Club, handover 2027 list, accessed 11 Oct 2026: https://continentalclub.ae/handover-2027/
- Property Finder, Oasis Residences project page, accessed 11 Oct 2026: https://www.propertyfinder.ae/en/new-projects/al-helal-al-zahaby-real-estate/oasis-residences
- HZ Development, Oasis Residences, accessed 11 Oct 2026: https://hzdevelopment.ae/project/oasis-residences/
- Propsearch, Oasis Residences Dubai South, updated 13 Apr 2026: https://propsearch.ae/dubai/oasis-residences-dubai-south
- Takween Aldar, Oasis Residences, accessed 11 Oct 2026: https://takweenaldar.ae/en/off-plan/project/oasis-residences
- Khaleej Times, HZ Development launches Oasis Residences in Dubai South, 15 Oct 2025: https://www.khaleejtimes.com/kt-network/hz-development-launches-oasis-residences-in-dubai-south-appoints-ax-capital-as-exclusive-sales-partner
- OffPlanIndex, Oasis Residences Dubai South payment plans, accessed 11 Oct 2026: https://offplanindex.ae/en/projects/oasis-residences-dubai-south