# When is the Cove Boulevard by Imtiaz handover date?

URL: https://www.dxbrealtor.ai/answers/cove-boulevard-by-imtiaz-handover-date/
Topic: Handover date
Updated: 2026-10-11

## Short answer

Cove Boulevard by Imtiaz has a registered completion date of 30 October 2028 on the Dubai Land Department (DLD) register, while Imtiaz's own project page estimates Q2 2028. The DLD inspection of 30 September 2026 recorded 10.45% construction progress, up from 5.90% on 27 April 2026. The four month gap between the two dates is the main point to settle in the SPA.

## Key figures

- Registered completion date (DLD): 30 Oct 2028 (DLD register via Continental Club, 4 Oct 2026)
- Latest construction progress: 10.45% (DLD inspection, 30 Sep 2026)
- Developer's stated date: Q2 2028 (Imtiaz project page, accessed 11 Oct 2026)
- Portal date: 30 Oct 2028 (Property Finder, accessed 11 Oct 2026)

## Cove Boulevard handover date: the latest position

The Dubai Land Department (DLD) project register holds a registered completion date of 30 October 2028 for Cove Boulevard By Imtiaz, project number 3675, in Dubailand Residence Complex. Property Finder lists the same date. Imtiaz's own project page gives an estimated completion of Q2 2028. More on prices and homes is on the [Cove Boulevard by Imtiaz](/projects/cove-boulevard-by-imtiaz/) page.

The DLD inspection of 30 September 2026 recorded 10.45% progress. Imtiaz's tracker shows 11% overall, with sub-structure at 30 and super-structure at 1. The tower launched in May 2025, and Property Finder lists the developer's stock as sold out, so most buyers now are buying resale units with the original handover terms attached.

## Cove Boulevard handover date by building

Cove Boulevard is one 30 storey tower with 436 units, including 149 offices.

| Building | Construction progress (DLD, date) | Registered completion date | Developer or portal date |
|---|---|---|---|
| Cove Boulevard By Imtiaz (436 units) | 10.45%, 30 Sep 2026 | 30 Oct 2028 | Q2 2028 (Imtiaz); 30 Oct 2028 (Property Finder) |

Progress and dates are from the DLD register as republished by Continental Club, registry updated 4 October 2026. Cove Grand and the Cove Edition towers nearby are separate DLD projects with their own dates.

## How the Cove Boulevard handover date has changed

| Date | Event | Source |
|---|---|---|
| 25 May 2025 | Bookings open and construction is registered as starting; completion date 30 October 2028. | Property Finder; DLD register |
| 27 Apr 2026 | DLD inspection: 5.90%. | DLD register, via Continental Club |
| 30 Sep 2026 | DLD inspection: 10.45%. | DLD register, via Continental Club |
| Oct 2026 | Imtiaz's page estimates Q2 2028; the register still shows 30 October 2028. | Imtiaz; DLD register |

The registered date has not moved. Progress so far is 4.55 points in the five months to September 2026. To reach 100% by 30 October 2028, the tower needs about 3.6 points a month over the remaining 25 months. For Imtiaz's Q2 2028 estimate, it needs about 4.3 points a month over 21 months.

## What the Cove Boulevard handover date means for payments

Imtiaz lists two plans. On the 60/40 plan, 40% is due on completion, so the date decides when the largest single payment falls. On the 70/30 plan, 70% is paid by completion and 30% follows in quarterly instalments over three years after handover. For a studio at the registered sales median of AED 711,560 (Continental Club, to 3 October 2026), 40% is about AED 284,600.

## What to check before relying on the Cove Boulevard date

1. **Which date the SPA states**, Q2 2028 or 30 October 2028, and the grace period after it.
2. **That the unit is in Cove Boulevard**, DLD project 3675, rather than Cove Grand or a Cove Edition tower.
3. **The next DLD inspection**, which will show whether the super-structure has started rising.

## Frequently asked

### When will Cove Boulevard be completed?

The DLD registered completion date is 30 October 2028. Imtiaz estimates Q2 2028 on its project page. The tower was 10.45% built at the DLD inspection of 30 September 2026.

### Is Cove Boulevard by Imtiaz finished?

No. It is under construction, at 10.45% on 30 September 2026 (DLD register via Continental Club). Imtiaz's own tracker showed 11% overall.

### Has the Cove Boulevard handover date been delayed?

No. The registered date of 30 October 2028 has not changed or passed. Sources differ on the target, with Imtiaz at Q2 2028 and the register and Property Finder at 30 October 2028.

### How much is due at Cove Boulevard handover?

On the 60/40 plan, 40% is due on completion. On the 70/30 plan, the final 30% is paid over three years after handover (Imtiaz).

## Sources

- Continental Club, Cove Boulevard By Imtiaz (DLD registry and transactions), registry updated 4 Oct 2026: https://continentalclub.ae/project/cove-boulevard-by-imtiaz-dubailand-residence-complex/
- Continental Club, Dubai projects handing over in 2028 (DLD register), accessed 11 Oct 2026: https://continentalclub.ae/handover-2028/
- Imtiaz Developments, Cove Boulevard by Imtiaz project page, accessed 11 Oct 2026: https://imtiaz.ae/property/cove-boulevard-by-imtiaz
- Property Finder, Cove Boulevard project page, accessed 11 Oct 2026: https://propertyfinder.ae/en/new-projects/imtiaz-developments/cove-boulevard
- Inside Realty, Imtiaz Cove Boulevard, accessed 11 Oct 2026: https://insiderealty.ae/en/projects/imtiaz-cove-boulevard-dubailand