# When is the Bayz 102 handover date?

URL: https://www.dxbrealtor.ai/answers/bayz-102-handover-date/
Topic: Handover date
Updated: 2026-10-12

## Short answer

The Bayz 102 handover date is 31 December 2029, the registered completion date on the Dubai Land Department (DLD) register, while Danube's own project page gives June 2029. The DLD site inspection of 6 October 2026 put construction at 6.52% complete, up from 5.86% on 30 June 2026, and Danube's internal inspection of 31 August 2026 gave 16%, with piling finished and excavation under way. When Danube unveiled the tower in September 2024 it said completion was expected in 2028, so the date has already moved back by at least a year.

## Key figures

- Registered completion date (DLD): 31 Dec 2029 (DLD register, project 3125, via Mitchells, accessed 1 Oct 2026)
- Latest construction progress: 6.52% (DLD site inspection, 6 Oct 2026 (Danube's own check, 31 Aug 2026, 16%))
- Developer's stated date: Jun 2029 (Danube, accessed 28 Sep 2026)
- Date change since launch: 2028 to 2029 (Danube, 12 Sep 2024; DLD register)

## Bayz 102 handover date: the latest position

Bayz 102 is registered for completion on 31 December 2029. That is the date the Dubai Land Department holds for project number 3125, and Property Finder and Bayut show the same Q4 2029. Danube's own project page gives an earlier June 2029. The DLD site inspection of 6 October 2026 recorded the tower 6.52% complete, 22 months after the registered construction start of 1 December 2024. More on prices and the tower itself is on the [Bayz 102 by Danube](/projects/bayz-102/) page.

Danube publishes a higher figure from its own site checks. Its internal inspection of 31 August 2026 put overall progress at 16%, with shoring and piling complete and excavation in progress. The two figures come from different inspections about five weeks apart, and the DLD figure is the one on the official register. Danube described the work at the end of August 2026 as excavation, and at the October inspection about 39 months remained to the registered date.

## Bayz 102 handover date by building

Bayz 102 is a single tower, so one registered date applies to every unit. The DLD register describes it as 4 basements, ground and 102 levels, with 1,088 registered units. Danube's own page counts 956 apartments.

| Building | Construction progress (DLD, date) | Registered completion date | Developer or portal date |
|---|---|---|---|
| Bayz 102 (4 basements, ground and 102 levels) | 6.52%, 6 Oct 2026 | 31 Dec 2029 | Jun 2029 (Danube); Q4 2029 (Property Finder, Bayut) |

Earlier DLD inspections recorded about 5.2% on 23 March 2026 and 5.86% on 30 June 2026, so progress on the register rose by about 1.3 points in just over six months (Continental Club, DLD data).

## How the Bayz 102 handover date has changed

| Date | What happened | Source |
|---|---|---|
| 11 Sep 2024 | Danube unveiled Bayz 102. It said the tower would take about four years to build, with completion expected in 2028. | Danube, 12 Sep 2024 |
| 1 Dec 2024 | Registered construction start on the DLD register. | DLD register |
| 30 Jun 2026 | 5.86% complete at the DLD site inspection. Registered completion date 31 December 2029. | DLD register, via Mitchells |
| 30 Jul 2026 | Danube named 11 projects due for handover within 12 months. Bayz 102 was not one of them. | Arabian Post |
| 31 Aug 2026 | 16% complete on Danube's internal inspection, with piling finished. | Danube |
| Sep 2026 | Danube's page gives June 2029. Property Finder and Bayut give Q4 2029. | Danube; Property Finder; Bayut |
| 6 Oct 2026 | 6.52% complete at the DLD site inspection. Registered completion date still 31 December 2029. | DLD register, via Continental Club |

The 2028 date given at the unveiling no longer appears on Danube's pages. Danube has not announced a revision, so the move to 2029 shows only in the dates now published, and those still differ by six months.

## What the Bayz 102 handover date means for payments

Danube's published plan is 10% at booking, 59% during construction, 1% at handover and 30% over 30 months after handover. That puts 69% of the price before completion and very little on the handover day itself.

The handover date matters most for the last 30%. If handover is in June 2029, the 30 monthly payments run to about the end of 2031. If it is 31 December 2029, they run to about mid 2032. On a studio listed from AED 1.27 million, the 1% at handover is AED 12,700 and the post-handover balance is AED 381,000, or about AED 12,700 a month.

On 26 August 2026 Danube also offered Bayz 102 with 0% down and 2% a month for a limited time, a different schedule from the published plan.

## What to check before relying on the Bayz 102 date

1. **Which date your SPA states.** Danube's page and the DLD register are six months apart, and the SPA date and its grace period are what the contract enforces.
2. **Which payment plan you are on.** The published 10/59/1/30 plan and the August 2026 0% down offer pay out on different schedules before and after handover.
3. **The DLD progress for project 3125**, through DLD's project status enquiry service. In mid 2026 Danube's own figure was about 10 points above the register's.
4. **The construction stage, not only the percentage.** Danube's update of 31 August 2026 listed excavation as the current work, so the next updates will show when the basements and the first floors start.

## Frequently asked

### What is the Bayz 102 completion date?

31 December 2029. That is the registered completion date for DLD project number 3125 (DLD register, via Mitchells, accessed 1 Oct 2026). Property Finder and Bayut show the same Q4 2029, while Danube's own project page gives June 2029.

### Is Bayz 102 finished?

No. The DLD site inspection of 6 October 2026 put the tower at 6.52% complete, up from 5.86% on 30 June 2026. Danube's internal inspection of 31 August 2026 gave 16%, with shoring and piling complete and excavation in progress (Danube, construction update).

### Has the Bayz 102 handover date been delayed?

When Danube unveiled Bayz 102 on 11 September 2024, it said the tower would take about four years to build, with completion expected in 2028 (Danube, 12 Sep 2024). Danube now gives June 2029 and the DLD register holds 31 December 2029. Danube has not published a reason for the later date.

### When will Bayz 102 be ready to move in?

Not before mid 2029 on any published date. Danube gives June 2029 and the DLD registered completion date is 31 December 2029. In July 2026 Danube named 11 projects due for handover within 12 months, and Bayz 102 was not among them (Arabian Post, 30 Jul 2026).

### How much is due at the Bayz 102 handover?

Under Danube's published plan, 1% is due on handover, after 10% at booking and 59% during construction. The remaining 30% is paid over 30 months after handover, so its timing moves with the handover date (Danube; Bayut, accessed 28 Sep 2026).

## Sources

- Mitchell's, Bayz 102 by Danube, DLD registry and registered sales (DLD project 3125), accessed 1 Oct 2026: https://www.mitchellscommercialrealty.com/off-plan/bayz-102-by-danube
- Continental Club, Bayz 102 by Danube (DLD registry data), registry updated 25 Sep 2026: https://continentalclub.ae/project/bayz-102-by-danube-business-bay/
- DLD project register via Continental Club, Dubai handover 2029 tracker, Bayz 102, inspection 6 Oct 2026, register updated 11 Oct 2026, accessed 12 Oct 2026: https://continentalclub.ae/handover-2029/
- Danube Properties, Bayz 102 construction update, 31 Aug 2026: https://danubeproperties.com/construction/bayz102/
- Danube Properties, Bayz 102, accessed 28 Sep 2026: https://danubeproperties.com/bayz-102/
- Danube Properties, Built for air taxis, Danube unveils Bayz102 tower, 12 Sep 2024: https://danubeproperties.com/built-for-air-taxis-danube-unveils-bayz102-tower/
- Property Finder, Bayz 102 project page, accessed 28 Sep 2026: https://www.propertyfinder.ae/en/new-projects/danube-properties/bayz-102
- Bayut, Bayz 102 by Danube Properties building guide, accessed 1 Oct 2026: https://www.bayut.com/buildings/bayz-102/
- Arabian Post, Danube advances handover of 11 Dubai developments, 30 Jul 2026: https://thearabianpost.com/danube-advances-handover-of-11-dubai-developments/
- Danube Properties, Danube makes Dubai homeownership easier with zero down payment, 26 Aug 2026: https://danubeproperties.com/danube-properties-makes-dubai-homeownership-easier-with-zero-down-payment/
- DLD, real estate project status enquiry: https://backoffice.dubailand.gov.ae/en/eservices/real-estate-project-status-landing/real-estate-project-status
